| < < | --++!! GBT Operations & Commissioning Meeting |
| > > |
GBT Operations & Commissioning Meeting |
| <<O>> Difference Topic CommissioningMeeting07Aug31 (r1.11 - 31 Aug 2007 - BobAnderson) |
| Added: | |
| > > | We are soooooo close to finishing!! |
| Added: | |
| > > | All of the machining finished Tuesday morning, and Continental has demobilized. Satcom checked the level of the final areas, installed wear plates, and grouted the sections yesterday. Liquid epoxy was injected into some of the voids and debonded areas yesterday. That work continues today and tomorrow. After allowing for curing, the telescope should be ready for scheduling on Monday morning. The stairs have been re-installed, and the baskets have been removed. There are no restrictions on elevation angles. All azimuth and elevation motors and their brake packages and tachometers have been PM'd and are in service. The full system was run yesterday and today, and there are no faults. |
| <<O>> Difference Topic CommissioningMeeting07Aug31 (r1.10 - 31 Aug 2007 - GlenLangston) |
| Added: | |
| > > |
|
| Added: | |
| > > |
|
| <<O>> Difference Topic CommissioningMeeting07Aug31 (r1.9 - 31 Aug 2007 - ScottRansom) |
| Added: | |
| > > | Quite a bit to report this week. 1. After working with Ray Craeger and finding that all the new 8-bit Spigot code somehow managed to get left out of the release, I tested the new 8-bit 800MHz mode via Astrid and all looks grand. On Monday we used S-band to drift through a known MSP and it looked great. With Paul Demorest we compared the profile to one made with GASP and they were very similar. Will be great for future S-band pulsar projects (and globular cluster pulsar timing). 2. Randy, John and I cleaned up the specifications for the new pulsar backend project. Paul was in GB yesterday trying to start learning the system. And it seems like Brandon will be working part time on the Stage I development (which should be a big boon to getting Randy, Jason, and Paul spun up). We may be converging on a name for the new beast as well. I think we like GUPPi. Green bank Ultimate Pulsar Processor. Opinions? 3. Julia Deneva's drift-scan S-band observations this week using the new 8-bit Spigot modes have had some issues. The biggest problem is that the Spectrometer and/or Spigot keeps clipping the zero-lags when the telescope gets close to the Galactic Center. Since Tsys changes dramatically, maybe this isn't too surprising. We've tried several "solutions" involving changing the Convertor Rack attenuator settings and balancing the IFRack periodically, but the Spigot seems to be easily knocked out of calibration by doing these things. Her data from last night was almost completely clipped (however, we didn't know this until after this evenings observations were complete). Maybe we need to rejuvenate the cursed AutoLeveler?.... (time passes) Actually, I just got off a long phone call with Julia and things tonight looked pretty good. By manually balancing the IFrack at strategicly timed intervals, she managed to observe through the Galactic Center with only about 10 sec of clipping in total. There was tons of RFI early in the evening, though. |
| <<O>> Difference Topic CommissioningMeeting07Aug31 (r1.8 - 31 Aug 2007 - AmyShelton) |
| Changed: | |
| < < |
|
| > > |
|
| Changed: | |
| < < |
|
| > > |
|
| Changed: | |
| < < |
|
| > > |
|
| Changed: | |
| < < |
|
| > > |
|
| Changed: | |
| < < |
|
| > > |
|
| <<O>> Difference Topic CommissioningMeeting07Aug31 (r1.7 - 30 Aug 2007 - ToddHunter) |
| Added: | |
| > > |
|
| <<O>> Difference Topic CommissioningMeeting07Aug31 (r1.6 - 30 Aug 2007 - ToneyMinter) |
| Changed: | |
| < < | |
| > > | We were able to put the S-band project onto the telescope starting on Tuesday evening. They had some issues with the changing power levels as the Galactic Center drifted by. They have modified their observing techniques to handle this. They also had one instance of Astrid freezing up. |
| Added: | |
| > > |
K and Ku were cooled down. A preliminary checkout of these receivers was performed. K checked out OK. Ku, however, had intermitent power instabilities in the LCP of feed 2.
PF1 is still under repairs. Carl removed all 450 MHz observing from the schedule and the 350 MHz feed will be installed once PF1 is ready.
Q-band was taken off the telescope this week.
|
| <<O>> Difference Topic CommissioningMeeting07Aug31 (r1.5 - 30 Aug 2007 - AmyShelton) |
| Added: | |
| > > |
We are in the sixth development cycle of 2007. Please see the PlanOfRecordC62007 for all of the division's assigned activities.
Operational & User SupportOperational and user support was very light this week.Modification Requests/Tasks
|
| <<O>> Difference Topic CommissioningMeeting07Aug31 (r1.4 - 30 Aug 2007 - RandyMcCullough) |
| Added: | |
| > > | Digital Group Status 25-AUG-07 THRU 31-AUG-07 |
| Changed: | |
| < < |
Operations, Problem Summary |
| > > | ***Operations, Problem Summary*** |
| Changed: | |
| < < |
Development |
| > > |
No significant events to report this week.
***Maintenance***
Active Surface...
No work was done on the Active Surface this week.
***Development***
CICADA (Advanced Digital Backends Program)...
Specifications for the NGCUNPB have now been placed on our CICADA wiki for review and approval.
Spectrometer LTA Re-design...
|
| Changed: | |
| < < |
Plans |
| > > |
|
| Added: | |
| > > | Randy |
| <<O>> Difference Topic CommissioningMeeting07Aug31 (r1.3 - 30 Aug 2007 - CarlBignell) |
| Changed: | |
| < < | Activities List |
| > > | Activities List |
| Added: | |
| > > |
Last Week
=====
|
| Added: | |
| > > |
Observations for proposals
GBT07A-060
Next Week
=====
Observations scheduled for **
GBT07C-067 [ B] Helene Courtois
Bulk Motions of Filaments in the Local Universe
GBT06B-037 [ B] Joel Weisberg
Probing the Small-Scale Structure of Molecular
Gas with Pulsar B1641-45
GBT07B-006 [ B] Fernando Camilo
Studying the magnetar XTE J1810-197
GBT07B-008 [ B] Nissim Kanekar
The nature of damped Lyman-alpha systems, as
traced by their spin temperatures
GBT07A-060 [F B] Julia Deneva
S-band Drift Search for Transients and Pulsars in
the Inner Galaxy
** Scheduled as F-ixed, P-rimary, B-ackup
Contact Information for 09/13/2007 - 09/27/2007
===================================
Proposal PI Bands Email [NRAO contact]
------------------ ----- -------------------- GBT07A-089 Fernando Camilo 8 fernando@astro.columbia.edu [Scott Ransom] GBT07B-011 Dunc Lorimer 3 Duncan.Lorimer@mail.wvu.edu [Scott Ransom] GBT07C-067 Helene Courtois L courtois@ifa.hawaii.edu [Rick Fisher] GBT07B-014 Marta Burgay S burgay@ca.astro.it [Scott Ransom] GBT07B-005 Sharon Montgomery L smontgomery@clarion.edu [Frank Ghigo] GBT07B-006 Fernando Camilo S fernando@astro.columbia.edu [Scott Ransom] GBT07B-007 Nissim Kanekar 8 nkanekar@nrao.edu [D.J. Pisano] GBT07B-008 Nissim Kanekar 3 nkanekar@nrao.edu [Frank Ghigo] GBT07A-060 Julia Deneva S deneva@astro.cornell.edu [Scott Ransom] GBT07A-072 Lisa Wei L wei@astro.umd.edu [Frank Ghigo] Scheduled hours [backup] ====================
Category/Month-> August September
Astronomy ~ 241 8 [573]
Maintenance ~ 210 17 [068]
Test & Comm ~ 294 655 [031]
Un-assigned ~ 0 40
Proposal Checkouts #[hrs]*
=====================
Awaiting checkout - 0[0]
Active checkout - 0[0]
On Hold - 0[0]
Schedule - 76[3212]
Completed - 491[6289]
* All but completed queue applies to GBT only proposals
Current backlog of Reg & RRS proposals [hours prior to 07B*] = 1168
[2005:369(14), 2006:355(17), 2007:444(21)]
Backlog includes 59 hrs of monitoring projects
182 hrs of vlbi projects
Total time to discharge [hours] = 6518
Includes 286 hours++ of monitoring (not Large or Spec) after trimester 07B
|
| <<O>> Difference Topic CommissioningMeeting07Aug31 (r1.2 - 30 Aug 2007 - ChrisClark) |
| Added: | |
| > > | The servo room network upgrade has been completed. SDD report that all seems to be well. |
| <<O>> Difference Topic CommissioningMeeting07Aug31 (r1.1 - 30 Aug 2007 - RichardPrestage) |
| Topic CommissioningMeeting07Aug31 . { View | Diffs | r1.13 | > | r1.12 | > | r1.11 | More } |
|
Revision r1.1 - 30 Aug 2007 - 16:50 GMT - RichardPrestage Revision r1.13 - 31 Aug 2007 - 14:54 GMT - StevenWhite |
Content copyright © 1999-2007 by the contributing authors. All material on this collaboration platform is the property of the contributing authors. |