 <<O>>  Difference Topic CommissioningMeeting08Apr25 (r1.14 - 25 Apr 2008 - BobAnderson)
Changed:
<
<

>
>

Nothing to report. A very quiet week.


 <<O>>  Difference Topic CommissioningMeeting08Apr25 (r1.13 - 25 Apr 2008 - DennisEgan)
Added:
>
>


 <<O>>  Difference Topic CommissioningMeeting08Apr25 (r1.12 - 25 Apr 2008 - AmyShelton)
Added:
>
>

  • Operational Support:
    • Minor BOS support
    • Astrid hanging because of corrupted ports on earth.
    • GBTIDL user support for issues related to large file sizes.
  • PlanOfRecordC32008

 <<O>>  Difference Topic CommissioningMeeting08Apr25 (r1.11 - 25 Apr 2008 - GlenLangston)
Added:
>
>

  • The MIT/LL crew upgraded their computer system, IF electronics and installed the 1.5 to 3 GHz feed.
  • Thanks to everyone who helped the MIT/LL crew the last two weeks.
  • Measurements by Gary and Jonah indicate the Kildal feed has a good pattern in the frequency range 150 to 500 MHz.
  • Regular operations resumes on Tuesday April 29.
  • Rich Bradley and Rohit Gawande hope to test their 500 to 3000 MHz feed on the 43m some time in the next month.

 <<O>>  Difference Topic CommissioningMeeting08Apr25 (r1.10 - 25 Apr 2008 - RonMaddalena)
Added:
>
>

We supported 21 projects in 34 observing sessions, including 4 VLB sessions. The telescope was also scheduled for maintenance (16 hrs) and servo tests (2 hrs). Lost time was low -- 3.4 hrs, 2.2% -- and came from:

  • Earth reboot (Grail/Astrid RPC problems) : 2.5 hrs
  • Telescope schedule conflict : 0.25 hrs
  • Observer no-show : 0.25 hrs
  • Winds : 0.23 hrs
  • Unexpected Safe Hold Mode (2 instances) : 0.09 hrs
  • Operator error : 0.08 hrs

The safe-hold problems were very atypical and occurred within a few minutes of each other but haven't happened again since last weekend. One observer was informed of a later start time than that given to the operators and the receiver was ready before the observer was ready (i.e., it was our fault). The Earth/Grail/Astrid problem was also atypical.


 <<O>>  Difference Topic CommissioningMeeting08Apr25 (r1.9 - 25 Apr 2008 - KarenONeil)
Changed:
<
<

Dynamic Scheduling -- Karen

>
>

Dynamic Scheduling -- Karen (2 week report)

  • Accomplishments:
    • First review of DSS to telescope operators
    • Version 0.7 released
    • Actual database uploaded
    • Overview calendar complete
    • Web page for observer information updated
  • Coming up
    • Begin training science support staff
    • Continue working with telescope operators
    • Operations MR begin worked on
    • Weather history being developed
    • User's manual almost complete
  • Concerns
    • Only 5 more weeks until release eek!

 <<O>>  Difference Topic CommissioningMeeting08Apr25 (r1.8 - 25 Apr 2008 - ToddHunter)
Changed:
<
<

  • Holography-
    • [Todd?]
>
>

  • OOF Holography
    • As of last night, the latest OOF software from Bojan has been compiled and executed on prospero. Next we need to itemize the various libraries that will need to be updated in Astrid etc. before it can be incorporated into the system.
    • First draft written for MR8C308 (to add a thermal Zernike model to active surface manager)
  • Traditional holography
    • Last Friday, a location was found for the holography reference receiver that can coexist with RFI monitoring station -- adjacent to, but offset toward the elevator side. Measurements were made and mechanical drawings of the box and tube have been created.
    • Fred is modeling the required accuracy for position knowledge. Preliminary result is somewhere in the 10-20 cm range. A survey will likely be made sometime after it is installed.
Changed:
<
<

    • On telescope tests
      • New velocity generation for pointing model
      • Test pointing update command ‘glitches’
>
>

    • On-telescope tests of recently-completed servo MRs (Monday night)
      • Minor bug fix for the velocity generation for pointing model (removes the possibility of an oscillation caused by the hysteresis term)
      • Temporal smoothing of dynamic correction pointing updates (which can otherwise cause command ‘glitches’)
Added:
>
>

    • Traditional holography manager testing
Added:
>
>


 <<O>>  Difference Topic CommissioningMeeting08Apr25 (r1.7 - 24 Apr 2008 - StevenWhite)
Added:
>
>

  • Nothing to report
Added:
>
>

  • Nothing to report

 <<O>>  Difference Topic CommissioningMeeting08Apr25 (r1.6 - 24 Apr 2008 - MartyBloss)
Changed:
<
<

>
>

  • MUSTANG 'cold' at UPenn and soon available for remote VNC access after some connectivity issues sorted
  • Housekeeping section of YGOR manager under development
Changed:
<
<

PTCS program -- John

>
>

PTCS program -- Marty

  • Servo-
    • Proof-of-concept for MATLAB to C++ code conversion
  • Holography-
    • [Todd?]
  • Upcoming activities-
    • On telescope tests
      • New velocity generation for pointing model
      • Test pointing update command ‘glitches’
    • PLC Interlock acceptance testing (Az/El)

 <<O>>  Difference Topic CommissioningMeeting08Apr25 (r1.5 - 24 Apr 2008 - CarlBignell)
Changed:
<
<

Activities List

>
>

Activities List

Added:
>
>

Last Week =====

Added:
>
>

Observations for proposals BB240 , GBT08A-020, GBT08A-075, GBT08A-033, GBT08A-077, GBT07A-087, GBT07C-086, GBT07A-066, BL156 , GBT07C-066, GBT08A-047, GBT08A-037, GBT08A-027, GBT07C-057, GBT07B-025, GBT07C-049, GBT07B-029, GBT05A-029, BB242 , GBT08A-040, GBT07C-060

Completed proposals BL156, GBT07C-066, GBT08A-027, GBT07C-057

Next Week ===== Observations scheduled for ** BB240 [FP ] Geoff Bower RIPL: Radio Interferometric PLanet Search GBT08A-020 [F ] Jason Hessels Completing the GBT350 Pulsar and Transient Survey of the North Galactic Plane GBT08A-021 [F B] Jeff Mangum Formaldehyde Densitometry of IR-Bright Galaxies GBT08A-043 [F B] Jeremy Darling An OH Megamaser Survey at z~1 GBT07B-031 [ P ] Steven Majewski Proper Motions of the Sagittarius Tidal Stream and the Shape of the Halo GBT08A-033 [F B] Mike Blanton Testing the cold dark matter mass function with dwarf disk galaxies GBT07A-087 [F ] Paul Demorest Detecting nHz Gravitational Radiation using a Pulsar Timing Array GBT08A-014 [F B] Jay Lockman On the Trail of Smith's Cloud GBT07C-033 [F ] Jason Hessels Follow-up Studies of Recent GBT Pulsar Discoveries GBT08A-047 [F B] Chris Carilli First limits to the IGM during cosmic reionization using the H 2p-2s transition GBT07C-056 [ P ] Jeremy Darling Formaldehyde in the Gravitational Lens PKS 1830-211 GBT08A-039 [F ] Dana Balser Magnetic Fields in Photo-Dissociation Regions GBT07C-005 [ B] Jeff Mangum Formaldehyde Densitometry of IR-Bright Galaxies GBT07C-049 [ P ] Jaime Pineda The COMPLETE GBT Ammonia Mapping of Perseus GBT08A-081 [F B] Kevin Bandura HI Brightness Mapping of DEEP2 Fields GBT08A-082 [F ] Min Yun Probing Distribution and Physical Characteristics of HI Clouds in Galaxy Halos GBT08A-062 [F ] Jeremy Darling A "Blind'' HI Absorption Pilot Survey of the Local Universe GBT08A-040 [ P ] Pat Thaddeus A Search for the Negative Molecular Ions C4H-, C3N-, and CH2CN- GBT08A-041 [F B] Jeremy Darling Formaldehyde Absorption in the Gravitational Lens PKS 1830-211 GBT07A-051 [ P ] Mike Hollis A GBT Legacy Survey of Prebiotic Molecules Toward SgrB2?(N-LMH) and TMC-1 GBT07C-060 [F ] Fernando Camilo GLAST timing at GBT: six key radio-faint pulsars ** Scheduled as F-ixed, P-rimary, B-ackup

Contact Information for 05/08/2008 - 05/22/2008 =================================== Proposal PI Bands Email [NRAO contact]


------------------ ----- -------------------- BB240 Geoff Bower X gbower@astro.berkeley.edu [] GBT08A-020 Jason Hessels 8 jhessels@science.uva.nl [Scott Ransom] GBT07C-084 Laura Kasian LS kasian@physics.ubc.ca [Scott Ransom] GBT08A-021 Jeff Mangum U jmangum@nrao.edu [Jim Braatz] GBT08A-043 Jeremy Darling 8 jdarling@origins.colorado.edu [Toney Minter] GBT08A-033 Mike Blanton L blanton@nyu.edu [Jules Harnett] GBT07A-087 Paul Demorest S pdemores@nrao.edu [Scott Ransom] GBT07C-030 Joel Bregman K jbregman@umich.edu [D.J. Pisano] GBT08A-077 Fernando Camilo S fernando@astro.columbia.edu [Scott Ransom] GBT07B-020 Ingrid Stairs L stairs@astro.ubc.ca [Scott Ransom] GBT08A-011 Maura McLaughlin? 38 maura.mclaughlin@mail.wvu.edu [Scott Ransom] GBT07B-031 Steven Majewski K srm4n@virginia.edu [Larry Morgan] BD120 Shep Doeleman C sdoeleman@haystack.mit.edu [] GBT07A-066 Jim Braatz K jbraatz@nrao.edu [Jim Braatz] GBT08A-068 Ryan Johnson L ryan.e.johnson@dartmouth.edu [Jules Harnett] GBT08A-013 Thushara Pillai L tpillai@cfa.harvard.edu [Jules Harnett] GBT07A-101 Clive Dickinson B cdickins@astro.caltech.edu [Brian Mason] GBT07B-034 Robert Ferdman L ferdman@phas.ubc.ca [Scott Ransom] GBT08A-014 Jay Lockman L jlockman@nrao.edu [Jay Lockman] GBT08A-015 Mallory Roberts XSC malloryr@gmail.com [Scott Ransom] GBT07C-068 Amy Lovell L alovell@agnesscott.edu [Toney Minter] GBT07C-013 Nissim Kanekar S nkanekar@nrao.edu [Frank Ghigo] GBT07C-079 Antonio Crapsi K a.crapsi@oan.es [Toney Minter] GBT07C-014 Keivan Stassun K keivan.stassun@vanderbilt.edu [Larry Morgan] GBT08A-017 Pieter Buyle K pieter.buyle@ugent.be [Jim Braatz] GBT08A-039 Dana Balser C dbalser@nrao.edu [Dana Balser] GBT07B-029 Michael Kramer 8 mkramer@jb.man.ac.uk [Scott Ransom] GBT05A-029 Paul VandenBout? B pvandenb@nrao.edu [] GBT08A-082 Min Yun L myun@astro.umass.edu [Jules Harnett] GBT08A-072 Helene Courtois L h.courtois@ipnl.in2p3.fr [Rick Fisher] BB242 Jim Braatz K jbraatz@nrao.edu [] GBT08A-073 Viswesh Marthi 8 vrmarthi@ncra.tifr.res.in [Jules Harnett] GBT07A-051 Mike Hollis 3468A jan.m.hollis@nasa.gov [Larry Morgan] GBT07C-060 Fernando Camilo S fernando@astro.columbia.edu [Scott Ransom]

Scheduled hours [backup] ==================== Category/Month-> April May June July Astronomy ~ 634 [083] 574 [354] 263 [002] 253 Maintenance ~ 60 43 [051] 167 195 Test & Comm ~ 26 48 [034] 7 0 Un-assigned ~ 0 79 284 298

Proposal Checkouts #[hrs]* ===================== Awaiting checkout - 0[0] Active checkout - 0[0] On Hold - 0[0] Schedule - 114[2264] Completed - 537[6535] * All but completed queue applies to GBT only proposals

Current backlog of Reg & RRS proposals [hours prior to 08A*] = 1092 [2005:56(5), 2006:194(10), 2007:842(41)] Backlog includes 112 hrs of monitoring projects 254 hrs of vlbi projects Total time to discharge [hours] = 4997 Includes 276 hours++ of monitoring (not Large or Spec) after trimester 08A

        1. hours of Regular & RRS proposals
        2. hours of Large proposals
        3. hours of VLBI proposals
* Includes projects that are on hold for trimester 08A ++ Time is counted in other break down as well. 08A

 <<O>>  Difference Topic CommissioningMeeting08Apr25 (r1.4 - 24 Apr 2008 - JohnFord)
Changed:
<
<

>
>

  • Gave talk to CV NTC about the CICADA program, and about the CASPER program. We talked about how some of this might be used in our receivers and IF systems in the near future.
  • GUPPI
    • Working on fixing timing problems in designs so they will work at 1.6 Gs/s
    • Working on problem causing a slip of a few bins in spectrum
    • Packaged up the machine in one chassis
    • Patrick, Amy, and ROn have made good progress on control software
    • Scott and Paul have gotten the data collection software going.
    • Took data on GBT and 43m last week

 <<O>>  Difference Topic CommissioningMeeting08Apr25 (r1.3 - 24 Apr 2008 - RandyMcCullough)
Added:
>
>

Accelerometer #4 (located at the vertex) was restored to service by replacing a faulty RS-232 driver chip in its companion GDAQ unit.


 <<O>>  Difference Topic CommissioningMeeting08Apr25 (r1.2 - 24 Apr 2008 - GalenWatts)
Changed:
<
<

>
>

  • Upcoming activities: A. Harris, UMd, will be performing upgrades to the Zpec hardware sometime this summer.

 <<O>>  Difference Topic CommissioningMeeting08Apr25 (r1.1 - 24 Apr 2008 - RonMaddalena)
Added:
>
>

%META:TOPICINFO{author="RonMaddalena" date="1209046230" format="1.0" version="1.1"}% %META:TOPICPARENT{name="CommissioningMeetings"}%

GBT Operations & Commissioning Meeting

25 April 2008

GB137 and by video-con from CV-Conf

AGENDA


Upcoming Activities -- Carl

Activities List


Operations


Scheduling Status -- Carl



Observing News -- Ron


GBT Telescope Operations -- Bob


Mechanical Division Operations -- Dennis


Microwave Electronics Operations -- Steve


Digital Electronics Operations -- Randy


RFI Group Operations -- Carla


Software Operations -- Amy


Computing and Network Operations -- Chris


Business Services -- Mike


43m Operations -- Glen


Project and Development Work


Dynamic Scheduling -- Karen


MUSTANG -- Brian


PTCS program -- John


CICADA program -- John


Ka-band Rx / Zpectrometer -- Galen


K-band Focal Plane Array -- Steve


Other Project Notes


Upcoming Meetings


Any other Business

-- RonMaddalena - 24 Apr 2008


Topic CommissioningMeeting08Apr25 . { View | Diffs | r1.14 | > | r1.13 | > | r1.12 | More }
Revision r1.1 - 24 Apr 2008 - 14:10 GMT - RonMaddalena
Revision r1.14 - 25 Apr 2008 - 13:49 GMT - BobAnderson