  • Accomplishments:
    • Version 0.4 released (Feb 1)
    • MR on integrating Carl’s database written, submitted to Carl
  • Risks:
    • Reduced software effort for first 6 weeks of Q2; will result in less ease-of-use for June tests
    • All desired user docs for June tests are still not complete, but are rapidly getting there
  • Upcoming
    • Dana will being comparison of his code to new code
    • Meeting next week to discuss when a score is too low and how to display observers scheduling probabilities
    • Software team working on calendar to display windowed, fixed sessions

 <<O>>  Difference Topic CommissioningMeeting08Feb08 (r1.14 - 08 Feb 2008 - DennisEgan)
Changed:
<
<

>
>


 <<O>>  Difference Topic CommissioningMeeting08Feb08 (r1.13 - 08 Feb 2008 - RandyMcCullough)
Changed:
<
<

No significant events to report this week

>
>

Todd reported that the Pyrgeometer located at the Laser Lab was off-line. Jason and J.D. discovered that the corresponding Linux box was locked up and proceeded to fix the problem with a simple re-boot first thing this morming (08-FEB-08).


 <<O>>  Difference Topic CommissioningMeeting08Feb08 (r1.12 - 08 Feb 2008 - BobAnderson)
Changed:
<
<

>
>

  • Just routine maintenance this week, plus the zspectrometer installation.

 <<O>>  Difference Topic CommissioningMeeting08Feb08 (r1.11 - 08 Feb 2008 - GlenLangston)
Added:
>
>

  • Normal spacecraft tracking last week.
  • MIT/LL electronics issue in one of channels, suspended tracking Wed, Thurs, Friday
  • Two engineeers from MIT/LL performed maintenance on trailer electronics.
  • 43m Dewar pumped and temperatures now look good.
  • Further tests of 43m high rate pointing planned.
  • Operations likely in FY 2009
  • New peak pattern is installed in 43m. Figure below.
    • To view latest peaks plots follow link:

 <<O>>  Difference Topic CommissioningMeeting08Feb08 (r1.10 - 08 Feb 2008 - CarlBignell)
Changed:
<
<

Activities List

>
>

Activities List

Added:
>
>

Last Week =====

Added:
>
>

Observations for proposals GBT07C-094, BB240 , GBT07C-040, GBT08A-077, GBT08A-011, GBT07A-087, GBT08A-034, GBT07A-066, GBT08A-014, GBT05B-011, GBT07A-029, BG170 , GBT08A-072, GBT07A-094, GBT07A-040, GBT07A-051

Completed proposals GBT07C-094, BG170

Next Week ===== Observations scheduled for ** BB240 [ P ] Geoff Bower RIPL: Radio Interferometric PLanet Search GBT08A-020 [ B] Jason Hessels Completing the GBT350 Pulsar and Transient Survey of the North Galactic Plane BR125 [F ] Tim Robishaw The New Extragalactic Magnetometer: Zeeman Splitting in OH Megamasers GBT08A-076 [ B] Nissim Kanekar The nature of damped Lyman-alpha systems, as traced by their spin temperatures GBT08A-054 [ P ] Esteban Araya Correlated Variability of Astrophysical Masers II: Flares in IRAS18566+0408 GBT07C-084 [ B] Laura Kasian GBT Timing of a Young Highly Relativistic Binary Pulsar GBT08A-065 [F ] Don Campbell Surface Properties of Titan GBT07A-087 [ B] Paul Demorest Detecting nHz Gravitational Radiation using a Pulsar Timing Array GBT08A-066 [ P ] John Bally NH3 Survey of Galactic Plane Cloud Cores Selected at 1.1 mm with Bolocam GBT08A-077 [F B] Fernando Camilo Studying the magnetar XTE J1810-197 GBT08A-056 [ P ] Simon Dicker Observations with MUSTANG on the GBT at 3.3mm GBT08A-034 [F B] Bob Rood The Abundance Gradient in the Milky Way GBT07A-066 [FP ] Jim Braatz The Megamaser Cosmology Project GBT08A-057 [ B] Jennifer Donovan A Continuing Search for Wet Mergers in a Dry Sample GBT07A-034 [F ] Jim Braatz The Megamaser Cosmology Project: A Survey for H2O Masers in SDSS and 2MRS AGNs GBT08A-003 [ B] Steve Curran The Metallicity-21-cm Line Strength Relation in Damped Ly-alpha Absorbers GBT07B-034 [F B] Robert Ferdman Timing Binary and Millisecond Pulsars from the Parkes Multibeam Survey GBT07A-050 [ P ] Claudia Cyganowski Kinematics of Ionized and Molecular Gas Associated with IR Dust Bubbles GBT08A-073 [ B] Viswesh Marthi A deep search for associated HI 21cm absorption in red quasars GBT07C-082 [ B] James Aguirre Searching for Dark Matter Annihilations in Draco GBT07A-040 [ P ] Larry Weintraub Detecting the Origin of Arcminute Scale CMB Anisotropy GBT07A-051 [FP ] Mike Hollis A GBT Legacy Survey of Prebiotic Molecules Toward SgrB2?(N-LMH) and TMC-1 GBT07C-060 [F ] Fernando Camilo GLAST timing at GBT: six key radio-faint pulsars ** Scheduled as F-ixed, P-rimary, B-ackup

Contact Information for 02/21/2008 - 03/06/2008 =================================== Proposal PI Bands Email [NRAO contact]


------------------ ----- -------------------- GBT08A-086 Philip Nicholson S nicholso@astro.cornell.edu [Frank Ghigo] BB240 Geoff Bower X gbower@astro.berkeley.edu [] GBT07C-084 Laura Kasian LS kasian@physics.ubc.ca [Scott Ransom] GBT05A-040 Andrew Baker B ajbaker@physics.rutgers.edu [Dana Balser] GBT08A-032 Lynn Matthews L lmatthew@cfa.harvard.edu [Jules Harnett] GBT08A-065 Don Campbell S campbell@astro.cornell.edu [Frank Ghigo] GBT08A-011 Maura McLaughlin? 38 maura.mclaughlin@mail.wvu.edu [Scott Ransom] GBT07A-087 Paul Demorest 8 pdemores@nrao.edu [Scott Ransom] GBT08A-077 Fernando Camilo S fernando@astro.columbia.edu [Scott Ransom] GBT07A-066 Jim Braatz K jbraatz@nrao.edu [Jim Braatz] GBT08A-034 Bob Rood X rtr@virginia.edu [Dana Balser] GBT08A-056 Simon Dicker P simon.dicker@gmail.com [Brian Mason] GBT08A-057 Jennifer Donovan L jen@astro.columbia.edu [Jules Harnett] GBT08A-058 Léo Barriault L leo.barriault.1@ulaval.ca [Jay Lockman] GBT08A-014 Jay Lockman L jlockman@nrao.edu [Jay Lockman] GBT07B-034 Robert Ferdman L ferdman@phas.ubc.ca [Scott Ransom] GBT07C-033 Jason Hessels S jhessels@science.uva.nl [Scott Ransom] GBT06C-033 Andy Harris B harris@astro.umd.edu [Karen O'Neil] GBT07C-024 Nami Sakai K nami@taurus.phys.s.u-tokyo.ac.jp [D.J. Pisano] GBT07B-025 Scott Ransom S sransom@nrao.edu [Scott Ransom] GBT08A-006 Tom Bania X bania@bu.edu [Dana Balser] GBT08A-018 Nami Sakai K nami@taurus.phys.s.u-tokyo.ac.jp [Larry Morgan] GBT05C-035 Andrew Baker B ajbaker@physics.rutgers.edu [Dana Balser] GBT07A-029 Dick Crutcher L crutcher@uiuc.edu [Toney Minter] GBT05C-047 Thomas Greve B tgreve@submm.caltech.edu [Dana Balser] GBT07B-029 Michael Kramer L mkramer@jb.man.ac.uk [Scott Ransom] GBT07A-050 Claudia Cyganowski K ccyganow@astro.wisc.edu [Toney Minter] GBT07A-040 Larry Weintraub B lcw@astro.caltech.edu [Brian Mason] GBT07C-060 Fernando Camilo S fernando@astro.columbia.edu [Scott Ransom] GBT07A-051 Mike Hollis 3468A jan.m.hollis@nasa.gov [Larry Morgan]

Scheduled hours [backup] ==================== Category/Month-> February March April May Astronomy ~ 590 [334] 647 [554] 627 [484] 589 [374] Maintenance ~ 21 [068] 4 [102] 9 [102] 42 [051] Test & Comm ~ 72 [035] 60 [034] 49 [040] 31 [032] Un-assigned ~ 17 34 39 82

Proposal Checkouts #[hrs]* ===================== Awaiting checkout - 0[0] Active checkout - 0[0] On Hold - 0[0] Schedule - 114[3371] Completed - 537[6566] * All but completed queue applies to GBT only proposals

Current backlog of Reg & RRS proposals [hours prior to 08A*] = 1531 [2005:88(6), 2006:269(10), 2007:1174(49)] Backlog includes 67 hrs of monitoring projects 304 hrs of vlbi projects Total time to discharge [hours] = 5394 Includes 82 hours++ of monitoring (not Large or Spec) after trimester 08A

        1. hours of Regular & RRS proposals
        2. hours of Large proposals
        3. hours of VLBI proposals
* Includes projects that are on hold for trimester 08A ++ Time is counted in other break down as well. 08A

 <<O>>  Difference Topic CommissioningMeeting08Feb08 (r1.9 - 08 Feb 2008 - RonMaddalena)
Added:
>
>

We supported 15 projects in 28 observing sessions, including 3 VLB runs. The telescope was also scheduled for 8.5 hrs of maintenance and 6 hrs of M&C tests. Lost time was 12 hrs (8.3%) of which almost 8 hrs was due to the weather. Of the 14 operators shifts, 7 were free of problems. The major causes of lost time were:

  • Freezing rain - 7.9 hrs
  • Antenna communication problem - 2.6 hrs
  • Archivist (4 instances) - 0.5 hrs
  • Spigot - 0.3 hrs
  • Disk Space/User Error - 0.3 hrs
  • Spectrometer - 0.2 hrs
  • Astrid - 0.2 hrs

The Astrid, Archivist, and Antenna problems are probably all related and probably have a common cause. If so, the problem in total cost us 3.3 hrs. Joe will have more details.

Changed:
<
<

>
>

Zpectrometer was placed on the telescope and turned on in preparation for observing this weekend or next week. No major news concerning Mustang.


 <<O>>  Difference Topic CommissioningMeeting08Feb08 (r1.8 - 08 Feb 2008 - ToddHunter)
Added:
>
>

    • Pointing
      • Azimuth track map from last week shows familiar structure, with small increase in tilt amplitude since September
      • However, there is an unexplained sinusoid in the Y inclinometer difference vs. azimuth that needs further study
Changed:
<
<

>
>

    • OOF holography with Mustang and Q-band

 <<O>>  Difference Topic CommissioningMeeting08Feb08 (r1.7 - 07 Feb 2008 - ToddHunter)
Changed:
<
<

    • Team meeting scheduled
>
>

    • Team meeting scheduled for next week
Changed:
<
<

      • Ongoing MUSTANG OOF analysis
      • Additional runs during MUSTANG observations over next few weeks
>
>

      • Ongoing analysis of Mustang data compared to Q-band data; progress in python script development
      • Additional observations with different scan strategies are planned during MUSTANG runs over next few weeks

 <<O>>  Difference Topic CommissioningMeeting08Feb08 (r1.6 - 07 Feb 2008 - JohnFord)
Changed:
<
<

>
>

  • GUPPI
    • Randy and Jason achieved a milestone this week by collecting data samples from a 400 MHz tone, shipping them off to a bee2 through the xaui ports, and processing them with a PFB/FFT into a nice spectrum. They continued on and have designed another design that ships the output of the PFB/FFT through the backplane to another FPGA, which then collects the data.
    • Glen is building a spectrometer for the 43m project for doing pointing.
    • Glen is also investigating a design from Peter McMahon? of MeerKAT?/CASPER that includes all the "backend" blocks we need to complete the first phase of GUPPI.
    • J.D. and our PCHS mentor student have installed a UPS, the 2 iBOBs, and space for the BEE in a rack in the tape room. It's kind of a low-key home for an ultimate pulsar processor.
  • Other
    • Worked to include a library from Glenn Jones of JPL into our development tree.
    • Installed a new version of the CASPER library tarball into our development tree.
    • Sent out a call for papers from team members for URSI and a CASPER workshop

 <<O>>  Difference Topic CommissioningMeeting08Feb08 (r1.5 - 07 Feb 2008 - RandyMcCullough)
Added:
>
>

No significant events to report this week


 <<O>>  Difference Topic CommissioningMeeting08Feb08 (r1.4 - 07 Feb 2008 - GalenWatts)
Changed:
<
<

>
>

  • Accomplishments since last report
    • Zpectrometer installed on GBT this week.
  • Upcoming activities
    • RCO Saturday or Monday

 <<O>>  Difference Topic CommissioningMeeting08Feb08 (r1.3 - 07 Feb 2008 - MartyBloss)
Added:
>
>

  • Items/actions completed:
    • Sponsor tests of manager with tower and crate
    • Improvements to IDL analysis routines
      • Added calibration routine
      • Added opacity correction
      • Improved binary routines
      • Updated documentation

  • Decisions made:
    • Observing plan completed; team to meet in GB week of Feb-11

  • Items/actions in progress:
    • Completion of sponsor tests and bug fix for cycle
    • Research into vibration noise as a function of elevation
    • Drafting of housekeeping document/spec (Simon)

  • Near-term activities (next ~2 weeks):
    • Close out development cycle and release resources assigned to other projects
    • Support MUSTANG team in GB
Changed:
<
<

PTCS program -- John

>
>

PTCS program -- Todd/John

  • Items/actions completed:
    • Team meeting scheduled
    • OOF Holography
      • Ongoing MUSTANG OOF analysis
      • Additional runs during MUSTANG observations over next few weeks
    • Servo Replacement
      • Created PTCS small groups, their charters, and team wiki pages
      • Created Servo Replacement Specification wiki (map attached)

  • Near-term activities (next ~2 weeks):
    • Refine Servo Project software requirements (ongoing)
    • Update documentation/wikis (>2 wks)

 <<O>>  Difference Topic CommissioningMeeting08Feb08 (r1.2 - 07 Feb 2008 - RonMaddalena)
Changed:
<
<

nn Month 2008

>
>

08 February 2008


 <<O>>  Difference Topic CommissioningMeeting08Feb08 (r1.1 - 07 Feb 2008 - AmyShelton)
Added:
>
>

%META:TOPICINFO{author="AmyShelton" date="1202408880" format="1.0" version="1.1"}% %META:TOPICPARENT{name="CommissioningMeetings"}%

GBT Operations & Commissioning Meeting

nn Month 2008

GB137 and by video-con from CV-Conf

AGENDA


Upcoming Activities -- Carl

Activities List


Operations


Scheduling Status -- Carl



Observing News -- Ron


Commissioning Plans -- Ron


GBT Telescope Operations -- Bob


Mechanical Division Operations -- Dennis


Microwave Electronics Operations -- Steve


Digital Electronics Operations -- Randy


RFI Group Operations -- Carla


Software Operations -- Amy


Computing and Network Operations -- Chris


Business Services -- Mike


43m Operations -- Glen


Project and Development Work


Dynamic Scheduling -- Karen


MUSTANG -- Brian


PTCS program -- John


CICADA program -- John


Ka-band Rx / Zpectrometer -- Galen


K-band Focal Plane Array -- Steve


Other Project Notes


Any other Business


Topic CommissioningMeeting08Feb08 . { View | Diffs | r1.15 | > | r1.14 | > | r1.13 | More }
Revision r1.1 - 07 Feb 2008 - 18:28 GMT - AmyShelton
Revision r1.15 - 08 Feb 2008 - 15:35 GMT - KarenONeil
Content copyright © 1999-2007 by the contributing authors.
All material on this collaboration platform is the property of the contributing authors.