| <<O>> Difference Topic CommissioningMeeting08Mar07 (r1.14 - 07 Mar 2008 - DennisEgan) |
| Changed: | |
| < < | |
| > > |
|
| <<O>> Difference Topic CommissioningMeeting08Mar07 (r1.13 - 07 Mar 2008 - KarenONeil) |
| Added: | |
| > > |
|
| <<O>> Difference Topic CommissioningMeeting08Mar07 (r1.12 - 07 Mar 2008 - BobAnderson) |
| Added: | |
| > > |
|
| <<O>> Difference Topic CommissioningMeeting08Mar07 (r1.11 - 07 Mar 2008 - StevenWhite) |
| Added: | |
| > > |
|
| Added: | |
| > > |
|
| <<O>> Difference Topic CommissioningMeeting08Mar07 (r1.10 - 07 Mar 2008 - RonMaddalena) |
| Added: | |
| > > |
We supported 19 projects in 34 observing sessions, including 1 VLB run. The telescope was also scheduled for 13 hrs of PTCS tests and 9 hrs of maintenance. We were at half speed for 16.5 hrs due to low temperatures. Lost time was rather high (16.6 hrs, about 10.5%) of which 13.4 hrs were due to one or another weather factors.
|
| Changed: | |
| < < | |
| > > | Using Zpectrometer, Andy Harris and Andrew Baker have a very solid detection toward a high redshift (z ~ 2.2) object that had been previously detected with the Spectrometer. |
| <<O>> Difference Topic CommissioningMeeting08Mar07 (r1.9 - 07 Mar 2008 - ToddHunter) |
| Added: | |
| > > |
|
| <<O>> Difference Topic CommissioningMeeting08Mar07 (r1.8 - 06 Mar 2008 - JohnFord) |
| Changed: | |
| < < |
Digital Electronics Operations -- Randy |
| > > |
Digital Electronics Operations -- John
|
| Changed: | |
| < < | |
| > > |
|
| Changed: | |
| < < | |
| > > |
|
| <<O>> Difference Topic CommissioningMeeting08Mar07 (r1.7 - 06 Mar 2008 - GlenLangston) |
| Added: | |
| > > |
|
| Added: | |
| > > | %META:FILEATTACHMENT{name="43mSpectrum.png" attr="" comment="43m 2K Channel Spectrometer" date="1204841214" path="43mSpectrum.png" size="4545" user="GlenLangston" version="1.1"}% |
| <<O>> Difference Topic CommissioningMeeting08Mar07 (r1.6 - 06 Mar 2008 - MartyBloss) |
| <<O>> Difference Topic CommissioningMeeting08Mar07 (r1.5 - 06 Mar 2008 - CarlBignell) |
| Changed: | |
| < < | Activities List |
| > > | Activities List |
| Added: | |
| > > |
Last Week
=====
|
| Added: | |
| > > |
Observations for proposals
BB240 , GBT05A-040, GBT08A-011,
GBT08A-077, GBT07A-087, GBT07A-066,
GBT07C-033, GBT08A-058, GBT07B-034,
GBT08A-014, GBT06C-033, GBT07C-024,
GBT08A-006, GBT08A-018, GBT05C-035,
GBT07A-029, GBT07C-060, GBT07A-040
Completed proposals
GBT07A-040
Next Week
=====
Observations scheduled for **
GBT08A-076 [ B] Nissim Kanekar
The nature of damped Lyman-alpha systems, as
traced by their spin temperatures
GBT07C-084 [F B] Laura Kasian
GBT Timing of a Young Highly Relativistic Binary
Pulsar
GBT07B-020 [ B] Ingrid Stairs
The Pulsar Triple System in M4
GBT08A-056 [ P ] Simon Dicker
Observations with MUSTANG on the GBT at 3.3mm
GBT07A-066 [ P ] Jim Braatz
The Megamaser Cosmology Project
GBT08A-057 [F B] Jennifer Donovan
A Continuing Search for Wet Mergers in a Dry
Sample
GBT07A-101 [ P ] Clive Dickinson
Ka-band CCB high-resolution mapping of spinning
dust
GBT08A-014 [ B] Jay Lockman
On the Trail of Smith's Cloud
GBT07B-034 [ B] Robert Ferdman
Timing Binary and Millisecond Pulsars from the
Parkes Multibeam Survey
GBT08A-058 [F B] Léo Barriault
GBT OH Observations at high galactic latitudes
GBT06C-033 [FP ] Andy Harris
A CO(1-0) Survey of Dusty Galaxies with Elusive
Redshifts
GBT08A-006 [F B] Tom Bania
Solving "The 3-Helium Problem"
GBT08A-018 [ P ] Nami Sakai
Production Pathways of Sulfur-Bearing
Carbon-Chain Molecules
GBT07A-029 [ B] Dick Crutcher
A Definitive Test of Star Formation Theory
GBT08A-083 [ B] Daniela Goncalves
The North Celestial Pole Loop
GBT08A-073 [ B] Viswesh Marthi
A deep search for associated HI 21cm absorption
in red quasars
GBT07A-051 [ B] Mike Hollis
A GBT Legacy Survey of Prebiotic Molecules Toward
SgrB2?(N-LMH) and TMC-1
GBT07C-060 [ B] Fernando Camilo
GLAST timing at GBT: six key radio-faint pulsars
** Scheduled as F-ixed, P-rimary, B-ackup
Contact Information for 03/20/2008 - 04/03/2008
===================================
Proposal PI Bands Email [NRAO contact]
------------------ ----- -------------------- BB251 Edo Berger X eberger@ociw.edu [] GBT07C-072 Marcel Agueros 8 agueros@astro.washington.edu [Scott Ransom] BB240 Geoff Bower X gbower@astro.berkeley.edu [] GBT07A-086 Joel Bregman Q jbregman@umich.edu [Jim Braatz] GBT07C-084 Laura Kasian LS kasian@physics.ubc.ca [Scott Ransom] GBT08A-011 Maura McLaughlin? 8 maura.mclaughlin@mail.wvu.edu [Scott Ransom] GBT07C-030 Joel Bregman K jbregman@umich.edu [D.J. Pisano] GBT08A-077 Fernando Camilo S fernando@astro.columbia.edu [Scott Ransom] GBT07A-087 Paul Demorest S pdemores@nrao.edu [Scott Ransom] GBT07C-086 Pat Thaddeus K pthaddeus@cfa.harvard.edu [Toney Minter] GBT08A-056 Simon Dicker P simon.dicker@gmail.com [Brian Mason] GBT07A-066 Jim Braatz K jbraatz@nrao.edu [Jim Braatz] GBT07B-034 Robert Ferdman L ferdman@phas.ubc.ca [Scott Ransom] GBT08A-047 Chris Carilli L ccarilli@nrao.edu [Toney Minter] GBT07C-033 Jason Hessels 8 jhessels@science.uva.nl [Scott Ransom] GBT08A-058 Léo Barriault L leo.barriault.1@ulaval.ca [Jay Lockman] GBT06C-033 Andy Harris B harris@astro.umd.edu [Karen O'Neil] GBT08A-006 Tom Bania X bania@bu.edu [Dana Balser] GBT08A-018 Nami Sakai K nami@taurus.phys.s.u-tokyo.ac.jp [Larry Morgan] GBT07C-049 Jaime Pineda K jpineda@cfa.harvard.edu [Jules Harnett] GBT07A-029 Dick Crutcher L crutcher@uiuc.edu [Toney Minter] GBT07B-029 Michael Kramer 8 mkramer@jb.man.ac.uk [Scott Ransom] GBT05A-029 Paul VandenBout? B pvandenb@nrao.edu [] GBT08A-082 Min Yun L myun@astro.umass.edu [Jules Harnett] GBT07A-094 Scott Ransom S sransom@nrao.edu [Scott Ransom] BM270 James Miller-Jones X jmiller@nrao.edu [] GBT07C-060 Fernando Camilo 8 fernando@astro.columbia.edu [Scott Ransom] GBT07A-051 Mike Hollis 3468A jan.m.hollis@nasa.gov [Larry Morgan] Scheduled hours [backup] ====================
Category/Month-> March April May
Astronomy ~ 655 [415] 622 [480] 599 [361]
Maintenance ~ 22 [068] 9 [102] 42 [051]
Test & Comm ~ 44 [024] 56 [040] 43 [032]
Un-assigned ~ 23 34 60
Proposal Checkouts #[hrs]*
=====================
Awaiting checkout - 0[0]
Active checkout - 0[0]
On Hold - 0[0]
Schedule - 114[2915]
Completed - 537[6566]
* All but completed queue applies to GBT only proposals
Current backlog of Reg & RRS proposals [hours prior to 08A*] = 1374
[2005:63(5), 2006:251(10), 2007:1060(44)]
Backlog includes 67 hrs of monitoring projects
292 hrs of vlbi projects
Total time to discharge [hours] = 4704
Includes 114 hours++ of monitoring (not Large or Spec) after trimester 08A
|
| <<O>> Difference Topic CommissioningMeeting08Mar07 (r1.4 - 06 Mar 2008 - AmyShelton) |
| Added: | |
| > > |
|
| <<O>> Difference Topic CommissioningMeeting08Mar07 (r1.3 - 06 Mar 2008 - BenTester?) |
| Added: | |
| > > | Parts for the servo room arrived and I am on the telescope right now fitting them. |
| <<O>> Difference Topic CommissioningMeeting08Mar07 (r1.2 - 06 Mar 2008 - GalenWatts) |
| Added: | |
| > > |
|
| Added: | |
| > > |
|
| <<O>> Difference Topic CommissioningMeeting08Mar07 (r1.1 - 06 Mar 2008 - RichardPrestage) |
| Topic CommissioningMeeting08Mar07 . { View | Diffs | r1.14 | > | r1.13 | > | r1.12 | More } |
|
Revision r1.1 - 06 Mar 2008 - 16:13 GMT - RichardPrestage Revision r1.14 - 07 Mar 2008 - 14:58 GMT - DennisEgan |
Content copyright © 1999-2007 by the contributing authors. All material on this collaboration platform is the property of the contributing authors. |