Info

The actions listed are provided as a guide only. Additional/other items may be discussed depending on the situation and current observing conditions. Also see the Shift Duties Guide for additional details.

>
>

Info

The actions listed are provided as a guide only. Additional/other items may be discussed depending on the situation and current observing conditions. Also see the Shift Duties Guide for additional details.

Changed:
<
<

Brief location of any personnel on the GBT.
>
>

Brief location of any personnel on the GBT, 43meter, 45ft, or other locations of importance.
Changed:
<
<

Check status of servo systems / electronics / cryogenics.
>
>

Check status of servo systems / electronics / cryogenics on all telescopes.
Changed:
<
<

-- DavidRose - 12 May 2005

>
>

-- DavidRose - 27 Mar 2007


 <<O>>  Difference Topic OperatorChangeover (r1.4 - 12 May 2005 - DavidRose)
Changed:
<
<

The actions listed are provided as a guide only. Additional/other items may be discussed depending on the situation and current observing conditions.

>
>

The actions listed are provided as a guide only. Additional/other items may be discussed depending on the situation and current observing conditions. Also see the Shift Duties Guide for additional details.

Changed:
<
<

-- DavidRose - 10 Mar 2004

>
>

-- DavidRose - 12 May 2005


 <<O>>  Difference Topic OperatorChangeover (r1.3 - 10 Mar 2004 - DavidRose)
Changed:
<
<

The steps listed are for use as a guide only. Additional items may be discussed depending on the situation and current observing conditions.

STEP

ACTION
1 Off-going operator during shift change:
  • Brief shift activities, current observing routine, outages.
  • Brief location of any personnel on the GBT.
  • Brief planned or expected maintenance.
  • Brief planned or expected visitors.
  • Brief special, temporary, or significant procedural changes since last shift.
  • Brief latest weather.
  • Brief any safety issues or special call-out requirements.
  • Log out of Ops Log and print/post shift summary. 
2 On-coming operator upon assuming shift:
  • Continue scheduled observing or maintenance programs.
  • Check parameters associated with current observing routine if in progress.
  • Check status of servo systems / electronics / cryogenics.
  • Check weather.
  • Check listening post stations.
  • Login to Ops Log.
  • Complete other duties as required.
>
>

The actions listed are provided as a guide only. Additional/other items may be discussed depending on the situation and current observing conditions.

Changed:
<
<

-- DavidRose - 02 Oct 2003

>
>

OFF-GOING OPERATOR RESPONSIBILITIES
Brief shift activities, current observing routine, outages.
Brief location of any personnel on the GBT.
Brief planned or expected maintenance.
Brief planned or expected visitors.
Brief special, temporary, or significant procedural changes since last shift.
Brief latest weather.
Brief any safety issues or special call-out requirements.
Log out of OpsLog and print/review/post shift summary.

ON-COMING OPERATOR UPON ASSUMING SHIFT
Continue scheduled observing or maintenance programs.
Check parameters associated with current observing routine if in progress.
Check status of servo systems / electronics / cryogenics.
Check weather.
Check listening post stations.
Login to OpsLog.
Complete other shift as required.

-- DavidRose - 10 Mar 2004


 <<O>>  Difference Topic OperatorChangeover (r1.2 - 23 Oct 2003 - DavidRose)
Changed:
<
<

%META:TOPICPARENT{name="TemporaryGBTOpsArea"}%

>
>

%META:TOPICPARENT{name="TelescopeOperations"}%


 <<O>>  Difference Topic OperatorChangeover (r1.1 - 02 Oct 2003 - DavidRose)
Added:
>
>

%META:TOPICINFO{author="DavidRose" date="1065121795" format="1.0" version="1.1"}% %META:TOPICPARENT{name="TemporaryGBTOpsArea"}%

TELESCOPE OPERATIONS


OPERATOR CHANGEOVER

Info

The steps listed are for use as a guide only. Additional items may be discussed depending on the situation and current observing conditions.

STEP

ACTION
1 Off-going operator during shift change:
  • Brief shift activities, current observing routine, outages.
  • Brief location of any personnel on the GBT.
  • Brief planned or expected maintenance.
  • Brief planned or expected visitors.
  • Brief special, temporary, or significant procedural changes since last shift.
  • Brief latest weather.
  • Brief any safety issues or special call-out requirements.
  • Log out of Ops Log and print/post shift summary. 
2 On-coming operator upon assuming shift:
  • Continue scheduled observing or maintenance programs.
  • Check parameters associated with current observing routine if in progress.
  • Check status of servo systems / electronics / cryogenics.
  • Check weather.
  • Check listening post stations.
  • Login to Ops Log.
  • Complete other duties as required.

-- DavidRose - 02 Oct 2003


Topic OperatorChangeover . { View | Diffs | r1.6 | > | r1.5 | > | r1.4 | More }
Revision r1.1 - 02 Oct 2003 - 19:09 GMT - DavidRose
Revision r1.6 - 06 Feb 2008 - 20:40 GMT - DavidRose
Content copyright © 1999-2007 by the contributing authors.
All material on this collaboration platform is the property of the contributing authors.