 <<O>>  Difference Topic 2007Cycle3ProgressReport (r1.4 - 28 Mar 2008 - PauletteWoody)
Changed:
<
<

ERPd restrictions 4 4
Objections 3 13
>
>

ERPd restrictions 15 41
Added:
>
>

  • ERPd Restriction values amended PW 28MAR08

 <<O>>  Difference Topic 2007Cycle3ProgressReport (r1.3 - 11 Jun 2007 - WesleySizemore)
Added:
>
>

Completed site inspection at Canaan Valley Resort and provided ERPd limits necessary to protect NRAO from harmful interference.

Changed:
<
<

>
>

    • Began using "Radio Control" software with AR-ONE communications receiver.
    • Sugar Grove has ordered the Icom R-9500 communications receiver for our use.
Changed:
<
<

>
>

    • Continue work on amplifier and antenna installation.
    • Designed and am having the machine shop construct mounting bracket for laptop computer.

 <<O>>  Difference Topic 2007Cycle3ProgressReport (r1.2 - 05 Jun 2007 - PauletteWoody)
Changed:
<
<

Cycle 2 YTD
>
>

Cycle 3 YTD
Changed:
<
<

New Preliminary 0 0 0 14 16 14
Revisited Preliminary 0 0 0 6 6 6
New Regular 0 0 0 71 175 99
New Government 0 0 0 28 28 28
>
>

New Preliminary 12 12 20 26 28 34
Revisited Preliminary 1 1 4 7 7 10
New Regular 54 87 134 125 262 233
New Government 3 3 3 31 31 31
Changed:
<
<

TOTAL REVIEWED 0 0 0 146 252 174
ERPd restrictions 0 0
Objections 0 10
>
>

TOTAL REVIEWED 75 108 167 221 360 341
ERPd restrictions 4 4
Objections 3 13
Changed:
<
<

Pending Processing 0
Non-GVT, ERPd restrictions 0
GVT assignments, processing 0
GVT assignments, Tabled 0
GVT assignments, concerns 0
>
>

Pending Processing 76
Non-GVT, ERPd restrictions 8
GVT assignments, processing 1
GVT assignments, Tabled 14
GVT assignments, concerns 22
Changed:
<
<

Site Inspections, pending 0
>
>

Site Inspections, pending 13
Changed:
<
<

Interference investigations 0
>
>

| Interference investigations | 5 | 450-470 MHz, 850-860 MHz and 2.4 GHz

Added:
>
>

  • Site tours for SGRS and WV DHHR Trauma
  • April Evers MOA report
Changed:
<
<

-- CarlaBeaudet - 15 May 2007

>
>

-- PauletteWoody - 05 Jun 2007


 <<O>>  Difference Topic 2007Cycle3ProgressReport (r1.1 - 15 May 2007 - CarlaBeaudet)
Added:
>
>

%META:TOPICINFO{author="CarlaBeaudet" date="1179238766" format="1.0" version="1.1"}% %META:TOPICPARENT{name="Electronics.RfiGroup"}% Green Bank RFI Management Cycle 3 Progress Report (Apr 1 - May 15, 2007)

1. Direct Observer Support:

  • Working to achieve voluntary cooperation from a transmitter outside the NRQZ on 856.2875, 856.3625, 857.2875, and 858.2875 MHz.
  • Investigated interference report at 18.57 GHz.
  • Worked with Rick Fisher to look at low-level, narrowband, L band interference suspected of coming from receiver room equipment.
  • Investigated numerous reports of broadband and narrowband interference in the week prior to the start of the track work; the broadband could have been powerline, wleding, or both. Requested some metrics of welding RFI from Scott Ransom, who will be observing during the track work.

2. NRQZ (Zone 5) Administration:

Cycle 2 YTD
Category # Requests # Sites #Freq # Requests # Sites #Freq
New Preliminary 0 0 0 14 16 14
Revisited Preliminary 0 0 0 6 6 6
New Regular 0 0 0 71 175 99
New Government 0 0 0 28 28 28
Revisited Gvt 0 0 0 27 27 27
TOTAL REVIEWED 0 0 0 146 252 174
ERPd restrictions 0 0
Objections 0 10
Site Inspections 0 3
Waivered Inspections 0 0

Pending Processing 0
Non-GVT, ERPd restrictions 0
GVT assignments, processing 0
GVT assignments, Tabled 0
GVT assignments, concerns 0
Site Inspections, complete 0
Site Inspections, pending 0
Special Conditions 0
Interference investigations 0

3. WVRAZ:

  • Have identified an appropriate limit comparison method and developed an evaluation method for equipment in the WVRAZ.
  • Continued monitoring for power line and cable TV RFI.
  • Have monitored Frontier's progress in the critical, line-of-sight installations in this area. They have not yet replaced a single wireless modem. Have re-initiated contact with the Frontier lawyer.
  • Have spoken with the Snowshoe communications manager RE the WVRAZ limits and WIFI installations at Soaring Eagle Lodge at Snowshoe. Scheduled to meet with them.

4. On-Site RFI Mitigation (Zones 1-2):

  • Anechoic Chamber testing:
    • 4/9/07 initial testing of Compressor Control Unit for 140' telescope
    • 4/11/07 Proximity Card Reader
    • 4/16/07 Nike Ipod acessory 2.4 GHz transmitter
    • 5/14/07 Antenna Pattern Measurement system for the PAPER project.
    • Chamber converted for feed testing and returned to RFI testing setup
  • Spoke with business management about removing telephone patch boxes from rack and with computer division about disconnecting and reconnecting fiber optic cables in rack. The rack in the auditorium will be worked on after the Summer tour season 07.
  • Provided initial input RE RFI aspect of Proposed GBT Fire Suppression system.

5. RFI Policy, Instrumentation, Reporting Mechanism, etc:

  • GBT Monitoring Station
    • Gimbal, antennas and cabling installed. Need to hook up fiber lines and run operational checks.
  • Working collaboratively with Amy to develop web-based forms for data entry for the RFI Database. Also devised a set of criteria so we can give Danielle a set of realistic fake data to work with in designing her IDL tool.
  • RFI Monitoring Station at 40'
  • RFI Truck
  • Provided RFI presentation at GBT tour guide orientation meetings. (actually got to use it at one of the 2 meetings)
  • Corresponded with a student participant in the Summer EPO programs about the site policy.

6. Outreach:

  • Paulette preparing NSMA Presentation; group input.
  • Anechoic Chamber tours for the WVU visit

7. Other:

  • Performed an RFI survey in Charlottesville of the fully populated ALMA correlator.

-- CarlaBeaudet - 15 May 2007


Topic 2007Cycle3ProgressReport . { View | Diffs | r1.4 | > | r1.3 | > | r1.2 | More }
Revision r1.1 - 15 May 2007 - 14:19 GMT - CarlaBeaudet
Revision r1.4 - 28 Mar 2008 - 22:20 GMT - PauletteWoody