RFI Group Progress Reports 2007

Changed:
<
<

Yearly Summary

>
>

Green Bank RFI Management 2007 Progress Summary

1. NRQZ Administration:

  • Processed 538 requests for coordination at 850 sites for 872 transmission frequencies.
  • Performed 13 site inspections.
  • Corrected NRQZ compliance problems with 3 coordinated transmitters.
  • Provided 10 personal tours to government and industry representatives to promote a spirit of compliance with NRQZ regulations.
  • Provided 10% of 1 FTE to support a propagation model study in collaboration with Virgina Tech and NSWC
  • Obtained improved-resolution topography data for WV
  • Developed NRQZ policy in collaboration with NSF

2. Direct Observer Support:

  • Responded to
    • 25 real-time Observer Reports
    • 6 Observer Special Requests (band surveys, etc.)
    • 17 Requests for transmitter coordination

3. WVRAZ:

  • Monitored, recorded, and reported to the FCC illegal usage on 3 frequencies.
  • Monitored and mitigated local broadband sources continuously 1 week in advance of GBT observations at L band and lower.
  • Assessed compliance of 4 specific local unlicensed transmitters, and assessed coverage for 1 class of unlicenced transmitter.
  • Worked with EPO group on 7 seperate initiatives to encourage WVRAZ compliance in the community.
    • Frontier
    • Soaring Eagle Lodge Coordination
    • Times Article
    • Xmas Card
    • BB initiative
    • Snow Shoe Homeowners Assoc.
    • Rimfire Lodge Cat 5 cables
  • Worked extensively on NRAO's policy WRT WVRAZ issues.

4. On-Site RFI Mitigation (Zones 1-2):

  • Tested 16 devices for compliance in the Anechoic Chamber.
  • Provided mitigation designs for 5 projects.
  • Designed and executed 2 site-specific tests to measure parameters such as shielding effectiveness.
  • Worked at the planning stage on 5 seperate EPO initiatives to encourage compliance with site RFI regulations.
  • Gave presentation on GB site RFI policy to GB staff; developed video script to do the same.

5. RFI Infrastructure improvements:

  • Completed the GBT RFI Monitoring Station
  • Initiated the RFI Database Project and produced an IDL visualization tool for it
  • Preliminary work towards producing regular, archived, RFI monitoring
  • Outfitted new mobile RFI monitoring station
  • Continual mantenance and improvement of 40' monitoring station
  • Developed sensible visual comparison of ITU, FCC, and NRQZ limits
  • Installed new mount for the 3.6m dish antenna to support BYU Focal Plane Array RFI Excision Project

6. Outreach:

  • Provided tours and/or presentations about RFI for 8 different outreach events.
  • Responded to 3 requests for technical information from other academic institutions
  • Provided 2.5 days of site access and guidance for PBS Wired Science Film Crew and gave on-camera interviews

7. Other:

  • Participated in:
    • National Spectrum Management Association Meeting (presenter)
    • Green Bank Strategic Planning Initiative Conference
    • Electronics Division Planning Process Workshop
    • GB Summer Student Program
    • Green Bank Project Planning Workshop
    • Bi-weekly Green Bank RFI/EPO meetings
    • Monthly NRAO Spectrum Management Teleconferences
    • Quarterly NSF Spectrum Management Teleconferences
    • Occasional ITU WP7D Teleconferences
    • Weekly RFI Group Meetings
    • Annual RFI Group Stategic Planning Meeting

 <<O>>  Difference Topic 2007CycleProgressReports (r1.1 - 08 Feb 2008 - CarlaBeaudet)
Added:
>
>

%META:TOPICINFO{author="CarlaBeaudet" date="1202488500" format="1.0" version="1.1"}% %META:TOPICPARENT{name="Electronics.RfiGroup"}%

RFI group Progress Reports 2007



Yearly Summary

Cycle/Quarterly Reports

Green Bank RFI Management Cycle 1 Progress Report (Jan 1 – Feb 16, 2007)

Green Bank RFI Management Cycle 2 Progress Report (Feb 17 – Mar 31, 2007)

Green Bank RFI Management Cycle 3 Progress Report (Apr 1 – May 15, 2007)

Green Bank RFI Management Cycle 4 Progress Report (May 16 – Jul 1, 2007)

Green Bank RFI Management Cycle 5 Progress Report (Jul 1 – Aug 15, 2007)

Green Bank RFI Management Cycle 6 Progress Report (Aug 16 – Oct 1, 2007)

Green Bank RFI Management 4th Quarter Progress Report (Oct 1 – Dec 31, 2007)

-- CarlaBeaudet - 08 Feb 2008


Topic 2007CycleProgressReports . { View | Diffs | r1.2 | > | r1.1 | More }
Revision r1.1 - 08 Feb 2008 - 16:35 GMT - CarlaBeaudet
Revision r1.2 - 08 Feb 2008 - 19:48 GMT - CarlaBeaudet
Content copyright © 1999-2007 by the contributing authors.
All material on this collaboration platform is the property of the contributing authors.