NRAO Home  >  Green Bank  |  Wiki Topic:    GB > Projects > 2007Q4ProgressReport (r1.1 vs. r1.5)
   Changes | Index | Contents | Search | Statistics | Jump to Topic:
 <<O>>  Difference Topic 2007Q4ProgressReport (r1.5 - 28 Mar 2008 - PauletteWoody)
Changed:
<
<

NRQZ Applications Reviewed Cycle 7-8 YTD 2007
  # Requests # Sites In # Sites Out # Freq # Requests # Sites # Freq
Preliminary 17 16   16 64 65 71
Private 104 170 67 228 343 654 664
Government 23 23   23 131 131 131
TOTAL REVIEWED 144 276 67 267 538 850 872
ERPd restrictions 11 52
Objections 0 38
Site Inspections completed 4 13
Waivered Inspections 7 12
>
>

NRQZ Applications Reviewed Cycle 7-8 YTD 2007
  # Requests # Sites In # Freq # Requests # Sites # Freq
Preliminary 17 16 16 64 65 71
Private 104 237 228 343 654 664
Government 23 23 23 131 131 131
TOTAL REVIEWED 144 343 267 538 850 872
ERPd restrictions 37 125
Site Inspections completed 4 13
Waivered Inspections 7 12

  • ERPd Restriction values amended PW 28MAR08

 <<O>>  Difference Topic 2007Q4ProgressReport (r1.4 - 15 Jan 2008 - PauletteWoody)
Changed:
<
<

NRQZ Applications Reviewed Cycle 6 YTD
>
>

NRQZ Applications Reviewed Cycle 7-8 YTD 2007
Changed:
<
<

Site Inspections completed 1 10
Waivered Inspections 9 14
>
>

Site Inspections completed 4 13
Waivered Inspections 7 12

 <<O>>  Difference Topic 2007Q4ProgressReport (r1.3 - 15 Jan 2008 - WesleySizemore)
Added:
>
>

  • Started work on telephone switch rack RFI mitigation in tour center.
Changed:
<
<

  • Completed? repair of RFI shielding compromised by the installation of the new heating/cooling unit installed at 40' RFI trailer.
  • 3 meter resolution topography data issues; status???.
>
>

  • Completed repair of RFI shielding compromised by the installation of the new heating/cooling unit installed at 40' RFI trailer.
  • 3 meter resolution topography data issues: Ordered software that may edit WV 3 meter topo data to make it usable across state line.

Changed:
<
<

>
>

  • Assisted WV DHS&ES in identifying source of RFI to their IFLOWS repeater at Snowshoe.
  • Assisted Alleghaney County Public School Bus system in trying to identify source of RFI to their radio system on Warm Springs Mountain.
  • Participated in a PBS Wired Science segment on the NRQZ.

 <<O>>  Difference Topic 2007Q4ProgressReport (r1.2 - 14 Jan 2008 - PauletteWoody)
Changed:
<
<

NRQZ Applications Reviewed Cycle 6 YTD
  # Requests # Sites # Freq # Requests # Sites # Freq
Preliminary       47 49 61
Private       239 417 436
Government       108 108 108
TOTAL REVIEWED       394 574 605
ERPd restrictions 0 41
Objections 0 38
Site Inspections completed   9
Waivered Inspections   5

*

>
>

NRQZ Applications Reviewed Cycle 6 YTD
  # Requests # Sites In # Sites Out # Freq # Requests # Sites # Freq
Preliminary 17 16   16 64 65 71
Private 104 170 67 228 343 654 664
Government 23 23   23 131 131 131
TOTAL REVIEWED 144 276 67 267 538 850 872
ERPd restrictions 11 52
Objections 0 38
Site Inspections completed 1 10
Waivered Inspections 9 14

  • Grand Tour:
    • Dobson Cellular
  • Evers MOA reports for October, November and December
  • Meeting with J. Gonzalez/WVDHHR Trauma

 <<O>>  Difference Topic 2007Q4ProgressReport (r1.1 - 07 Jan 2008 - CarlaBeaudet)
Added:
>
>

%META:TOPICINFO{author="CarlaBeaudet" date="1199720040" format="1.0" version="1.1"}% %META:TOPICPARENT{name="Electronics.RfiGroup"}% Green Bank RFI Management 4th Quarter Progress Report (Oct 1 - Dec 31, 2007)

1. Direct Observer Support:

  • C band interference reported by JM Hollis traced to system problem.
  • RFI Surveys performed for Deshpande A. Yogesh M. and Anish R. using GBT Mon. Station in selected bands between 110 MHz and 1450 MHz. survey results here

2. NRQZ (Zone 5) Administration: 1OCT07 - 31DEC07

NRQZ Applications Reviewed Cycle 6 YTD
  # Requests # Sites # Freq # Requests # Sites # Freq
Preliminary       47 49 61
Private       239 417 436
Government       108 108 108
TOTAL REVIEWED       394 574 605
ERPd restrictions 0 41
Objections 0 38
Site Inspections completed   9
Waivered Inspections   5

*

3. WVRAZ:

  • Continued monitoring for power line and cable TV RFI.
  • Provided input to business office WRT Frontier Communications issue.
  • Provided Guest Information brochures and logo CAT5 cables to Rimfire Lodge at Snowshoe.

4. On-Site RFI Mitigation (Zones 1-2):

  • Anechoic Chamber testing:
    • Request-to-exit Infrared motion detector (component of Keyless Entry System)
  • Created mitigation scheme for keyless entry system in collaboration with the system installer; ordered hardware for same.

5. RFI Policy, Instrumentation, Reporting Mechanism, etc:

  • GBT Monitoring Station
    • Replaced lightning damaged amplifier in channel 3 of GBT monitoring station; added gnded bias T to bleed off static.
  • Anechoic Chamber
    • Anritsu Spec An MS2602A was repaired and calibrated.
    • Lab View installation, windows PC and network connection requested at anechoic chamber.
  • RFI Data Base Project
    • Articulated project requirements in collaboration with sponsors and end users.
    • Was able to secure 75% of Lihong's time to complete web-based data entry forms in Turbo Gears.
    • Articulated requirements for the GUI, began backtracking to formulate relational table structure of database.
  • Archival Monitoring Options beginning to be articulated.
  • Location for NSWC tower donation was determined; waiting for footer specifications from NSWC.

  • Completed? repair of RFI shielding compromised by the installation of the new heating/cooling unit installed at 40' RFI trailer.
  • 3 meter resolution topography data issues; status???.

6. Outreach:

7. Other:

  • Attended Operations meetings
  • Attended 2-day Project Planning Seminar
  • Attended 1-day Management Seminar
  • Attended RFI/EPO meetings
  • Attended NRAO Spectrum Managers Teleconference

Topic 2007Q4ProgressReport . { View | Diffs | r1.5 | > | r1.4 | > | r1.3 | More }
Revision r1.1 - 07 Jan 2008 - 15:34 GMT - CarlaBeaudet
Revision r1.5 - 28 Mar 2008 - 22:51 GMT - PauletteWoody
Content copyright © 1999-2007 by the contributing authors.
All material on this collaboration platform is the property of the contributing authors.