Summary

In January, 2007 initial testing with the Zpectrometer was completed and the Zpectrometer was removed from the telescope. A suspected gain offset somewhere in the cooled section of the receiver greatly limits the capabilities of the Zpectrometer; the receiver remained on the telescope exhibiting excellent performance with the Caltech Continuum back end. Continuum observations were performed through the end of April, 2007.
Changed:
<
<

  • All information will be moved from the main receiver page to this page soon.
>
>

In early Summer 2007 it was decided to temporarily reconfigure the receiver to improve the symmetry of the circuitry before the first hybrid in an effort to reduce a gain offset in that circuitry indicated by lab testing during Spring, 2007. This reconfiguration will result in a receiver of two beams with the previous 1.35 arc minute separation, each beam providing one linear polarization perpendicular to the other beam. This configuration results in a simpler, more symmetric circuit before the first hybrid with fewer components and therefore less loss before the cryogenic amplifier stages. Drawbacks are the loss of circular polarization capability and the loss of half the receiver channels requiring longer integration times for all observers. It is hoped that improvement in receiver temperature from less loss in the dewar circuitry will offset some of the necessary increase in integration time. Permanence of this change will be decided after review of lab and on-telescope results during Fall and Winter, 2007.

Changed:
<
<

-- GalenWatts - 25 Sep 2007

>
>

Components removed from the dewar circuitry before the first hybrid are the circular to square transitions, the ridged wall polarizers, the square waveguide 45 degree twists, the ortho-mode junctions and some sections of rectangular WR28 waveguide. In their place will be circular to WR28 transitions, WR28 45 degree twists and a pair of custom fabricated WR28 E-plane 90 degree bends. All other receiver components and specification including feed separation and location will remain unchanged.

Recent meeting minutes

Upcoming Meetings:

Pictures

Software Modification Requests

  • Modification requests not completed by Sept 30 were suspended.

Lab Reports

Lab Spectrometer Waterfall Baseline Plots from September, 2007

Each trace is (Scan B - Scan A)/Scan A, earlier scan are towards the bottom.
  • Beam 2, 27.5/0.8 GHz:
    B2G275.png

  • Beam 2, 33/0.8 GHz:
    B2G33.png

  • Beam 2, 36.5/0.8 GHz:
    B2G365.png

  • Beam 1, 39/0.8 GHz
    B1G39.png

Specifications for the Ka Receiver Manager fits file.

%META:FILEATTACHMENT{name="Front.jpg" attr="" comment="" date="1196192122" path="Front.jpg" size="592313" user="GalenWatts" version="1.1"}% %META:FILEATTACHMENT{name="Side.jpg" attr="" comment="" date="1196192133" path="Side.jpg" size="201037" user="GalenWatts" version="1.1"}% %META:FILEATTACHMENT{name="50Kabsorber.jpg" attr="" comment="" date="1196192144" path="50Kabsorber.jpg" size="214220" user="GalenWatts" version="1.1"}% %META:FILEATTACHMENT{name="KaFeedPatters.pdf" attr="" comment="" date="1196192158" path="KaFeedPatters.pdf" size="296959" user="GalenWatts" version="1.1"}% %META:FILEATTACHMENT{name="1vs2Deltas.pdf" attr="" comment="" date="1196192267" path="1vs2Deltas.pdf" size="564727" user="GalenWatts" version="1.1"}% %META:FILEATTACHMENT{name="B1G39.png" attr="" comment="" date="1196192509" path="B1G39.png" size="113268" user="GalenWatts" version="1.1"}% %META:FILEATTACHMENT{name="B2G33.png" attr="" comment="" date="1196192523" path="B2G33.png" size="111967" user="GalenWatts" version="1.1"}% %META:FILEATTACHMENT{name="B2G275.png" attr="" comment="" date="1196192534" path="B2G275.png" size="115530" user="GalenWatts" version="1.1"}% %META:FILEATTACHMENT{name="B2G365.png" attr="" comment="" date="1196192544" path="B2G365.png" size="114241" user="GalenWatts" version="1.1"}%

 <<O>>  Difference Topic KaMods2007 (r1.1 - 25 Sep 2007 - GalenWatts)
Added:
>
>

%META:TOPICINFO{author="GalenWatts" date="1190728007" format="1.0" version="1.1"}% %META:TOPICPARENT{name="KaBandReceiver"}%

GBT 26-40 GHz Receiver Modifications of Summer, 2007

  • All information will be moved from the main receiver page to this page soon.

-- GalenWatts - 25 Sep 2007


Topic KaMods2007 . { View | Diffs | r1.2 | > | r1.1 | More }
Revision r1.1 - 25 Sep 2007 - 13:46 GMT - GalenWatts
Revision r1.2 - 27 Nov 2007 - 19:56 GMT - GalenWatts
Content copyright © 1999-2007 by the contributing authors.
All material on this collaboration platform is the property of the contributing authors.