NRAO Home  >  Green Bank  |  Wiki Topic:    GB > Projects > PennArrayReceiver (r1.1 vs. r1.38)
   Changes | Index | Contents | Search | Statistics | Jump to Topic:
 <<O>>  Difference Topic PennArrayReceiver (r1.38 - 19 Dec 2005 - BrianMason)
Changed:
<
<

6. Resource Requests for Cycle 8 2005 (15nov05 - EOY)

>
>

6. Resource Requests for Cycle 1 2006


 <<O>>  Difference Topic PennArrayReceiver (r1.37 - 07 Nov 2005 - BrianMason)
Changed:
<
<

6. Resource Requests for Cycle 7 2005 (01oct05 - 10nov05)

>
>

6. Resource Requests for Cycle 8 2005 (15nov05 - EOY)


 <<O>>  Difference Topic PennArrayReceiver (r1.36 - 09 Sep 2005 - BrianMason)
Deleted:
<
<

4. Work Packages-- things we'll be working on, oct04 -- mar05

Changed:
<
<

At PENN

  • Final optics fabrication
  • Run MUX cold in dewar, become familiar with operation
    • ... with detectors.
    • address any issues found in the process (eg magnetic fields in the dewar that render squids inoperable)
  • Test and characterize system with detectors (optical efficiency, noise, loading, etc)
  • in-Lab demonstration of basic functionality before GBT run

At GSFC

  • Characterize the test bolometer arrays
  • Fabricate final bolometer arrays
  • complete & distribute IRC v6
  • get MkIII? MUXing fully working, and the data into IRC

At NIST

  • 2 day MUX operation training session (sometime in first 2 weeks of Oct)

At GB

  • grail infrastructure improvements
  • IRC java/soap GBT IX work
  • NIST visit
  • 2x 1 week Penn Lab visits in Jan/Feb??
  • manufacture mounting hardware and RFI box
  • test assemble/fit mounting hardware and RFI box, send on to Penn
  • manufacture lenses
  • PTCS team consulting support for pointing & focus in Feb/Mar 2005
    • PAR team in turn would support OOF mapping on a consulting basis...

NOTE: We have planned a big effort starting May 2005 to port the NASA software functionality over to GBT M&C.

5. Milestones

  • Penn / GSFC
    • Take delivery of final cryostat (early Dec03 -- done)
    • Cooldown of final cryostat (25mar04 --> done 05may04 -- & 20mK colder than test cryostat and old fridge!)
    • Final MUX operational in lab with dummy bolometers (01feb04 --> 01may04 --> early Jun? --> Fall 2005)
      • nb: preliminary MUX has been operated in black-box mode at Penn, still awaiting firmware upgrades, cold operation, etc
      • 06may04: waiting on Tekdata cables for cold operation; these are in progress, expected in ~4 weeks from now.
    • Finish Optics construction (30apr04 --> Dec 2005)
    • Working detectors delivered to Penn (17may04 --> Fall 2005??)
    • Integrate detectors to final cryostat (14jun04 --> Dec 2005??)
    • Construction complete/begin testing final instrument (06sep04 --> Mar 2005?)
    • Delivery to GB (Sep 04 --> Feb 2005?)
  • GB
    • Tests of new scan modes/observing procedures (30dec03 --> done)
    • collaboration meetings (GSFC nov 03; GSFC & Princeton feb04; done)
    • Better Simulated Datasets (15jan04 --> done apr04 [mosaicking, skydips, other scan patterns, improved atmosphere model] , some fixed still needed done and analyzed...)
    • specify calibration strategy (june/july 04 --> sometime before the engineering run??)
    • DAQ Interface finalized and documented (early may 04 --> late may 04)-- includes OS issues, timestamping-- GSFC working on this now.
    • Bill Cotton's package analyzes simulated datasets (early Jul 04-- done but still iterating on simulation improvements [may04])
      • We still have issues to sort out in OBIT but no time to work on this in the near term. Maybe just wait until real data.
    • project status review meeting in Philly, with extended working visit (jun04 done)
    • RFI Enclosure design finished (Q1 04 --> august04 --> Sep 2004)
    • RFI Enclosure and mounting hardware manufactured, fit checked, and delivered to Penn (end Dec 2004)
    • Manufacture final lenses for Penn (dec 2004)
    • GBT does a daisy scan from within IRC (15feb05)
    • YGOR Manager complete (early Aug 04-- put off to 2005 at the earliest)

6. Resource Requests for Cycle 6 2005 (15aug05 - end sep)

>
>

6. Resource Requests for Cycle 7 2005 (01oct05 - 10nov05)


 <<O>>  Difference Topic PennArrayReceiver (r1.35 - 05 Aug 2005 - BrianMason)
Changed:
<
<

6. Resource Requests for Cycle 5 2005 (01jul05 - 15aug05)

>
>

6. Resource Requests for Cycle 6 2005 (15aug05 - end sep)


 <<O>>  Difference Topic PennArrayReceiver (r1.34 - 24 Jun 2005 - BrianMason)
Changed:
<
<

6. Resource Requests for Cycle 3 2005 (16may05 - end jun 05)

>
>

6. Resource Requests for Cycle 5 2005 (01jul05 - 15aug05)


 <<O>>  Difference Topic PennArrayReceiver (r1.33 - 06 May 2005 - BrianMason)
Changed:
<
<

6. Resource Requests for Cycle 3 2005 (01 Apr 05 - 15 May 05)

>
>

6. Resource Requests for Cycle 3 2005 (16may05 - end jun 05)


 <<O>>  Difference Topic PennArrayReceiver (r1.32 - 29 Mar 2005 - BrianMason)
Changed:
<
<

>
>


 <<O>>  Difference Topic PennArrayReceiver (r1.31 - 25 Mar 2005 - BrianMason)
Changed:
<
<

6. Resource Requests for Cycle 2 2005 (Feb 15 - Apr 1?)

>
>

6. Resource Requests for Cycle 3 2005 (01 Apr 05 - 15 May 05)


 <<O>>  Difference Topic PennArrayReceiver (r1.30 - 07 Feb 2005 - BrianMason)
Changed:
<
<

6. Resource Requests for Cycle 8 2004 (15nov04 - 31dec04)

>
>

6. Resource Requests for Cycle 2 2005 (Feb 15 - Apr 1?)


 <<O>>  Difference Topic PennArrayReceiver (r1.29 - 17 Dec 2004 - BrianMason)
Changed:
<
<

  • Electronics Division Request?
  • Mechanical Division Request
  • Scientific Services Division Request?
  • Software Development Division Request?
  • Antenna Access Request?
  • Commissioning Time Request?
  • Additional Request Info?
  • Request Summary?
>
>

Added:
>
>

    • Cycle 8 2004? (nov 15 - eoy)

 <<O>>  Difference Topic PennArrayReceiver (r1.28 - 05 Nov 2004 - BrianMason)
Changed:
<
<

6. Resource Requests for Cycle 7 2004 (01oct04 - 15nov04)

>
>

6. Resource Requests for Cycle 8 2004 (15nov04 - 31dec04)

  • Electronics Division Request?
  • Mechanical Division Request
  • Scientific Services Division Request?
  • Software Development Division Request?
  • Antenna Access Request?
  • Commissioning Time Request?
  • Additional Request Info?
  • Request Summary?
Added:
>
>


 <<O>>  Difference Topic PennArrayReceiver (r1.27 - 21 Sep 2004 - BrianMason)
Changed:
<
<

4. Work Packages

>
>

4. Work Packages-- things we'll be working on, oct04 -- mar05

Changed:
<
<

See Current cycle requests

>
>

At PENN

  • Final optics fabrication
  • Run MUX cold in dewar, become familiar with operation
    • ... with detectors.
    • address any issues found in the process (eg magnetic fields in the dewar that render squids inoperable)
  • Test and characterize system with detectors (optical efficiency, noise, loading, etc)
  • in-Lab demonstration of basic functionality before GBT run

At GSFC

  • Characterize the test bolometer arrays
  • Fabricate final bolometer arrays
  • complete & distribute IRC v6
  • get MkIII? MUXing fully working, and the data into IRC

At NIST

  • 2 day MUX operation training session (sometime in first 2 weeks of Oct)

At GB

  • grail infrastructure improvements
  • IRC java/soap GBT IX work
  • NIST visit
  • 2x 1 week Penn Lab visits in Jan/Feb??
  • manufacture mounting hardware and RFI box
  • test assemble/fit mounting hardware and RFI box, send on to Penn
  • manufacture lenses
  • PTCS team consulting support for pointing & focus in Feb/Mar 2005
    • PAR team in turn would support OOF mapping on a consulting basis...

NOTE: We have planned a big effort starting May 2005 to port the NASA software functionality over to GBT M&C.

Changed:
<
<

    • Take delivery of final cryostat (early Dec03 -- done)
    • Final MUX operational in lab with dummy bolometers (01feb04 --> 01may04 --> early Jun?)
      • nb: preliminary MUX has been operated in black-box mode at Penn, still awaiting firmware upgrades, cold operation, etc
      • 06may04: waiting on Tekdata cables for cold operation; these are in progress, expected in ~4 weeks from now.
>
>

    • Take delivery of final cryostat (early Dec03 -- done)
Changed:
<
<

    • Finish Optics construction (30apr04 --> ...)
    • Working detectors delivered to Penn (17may04 --> ...)
    • Integrate detectors to final cryostat (14jun04 --> ...)
    • Construction complete/begin testing final instrument (06sep04 --> ...)
    • Delivery to GB (Sep 04 --> 25oct04?)
>
>

    • Final MUX operational in lab with dummy bolometers (01feb04 --> 01may04 --> early Jun? --> Fall 2005)
      • nb: preliminary MUX has been operated in black-box mode at Penn, still awaiting firmware upgrades, cold operation, etc
      • 06may04: waiting on Tekdata cables for cold operation; these are in progress, expected in ~4 weeks from now.
    • Finish Optics construction (30apr04 --> Dec 2005)
    • Working detectors delivered to Penn (17may04 --> Fall 2005??)
    • Integrate detectors to final cryostat (14jun04 --> Dec 2005??)
    • Construction complete/begin testing final instrument (06sep04 --> Mar 2005?)
    • Delivery to GB (Sep 04 --> Feb 2005?)
Changed:
<
<

    • Tests of new scan modes/observing procedures (30dec03 --> done)
>
>

    • Tests of new scan modes/observing procedures (30dec03 --> done)
Changed:
<
<

    • Better Simulated Datasets (15jan04 --> done apr04 [mosaicking, skydips, other scan patterns, improved atmosphere model] , some fixed still needed)
    • RFI Enclosure for PAR finished (Q1 04 --> august04)
    • specify calibration strategy (june/july 04)
>
>

    • Better Simulated Datasets (15jan04 --> done apr04 [mosaicking, skydips, other scan patterns, improved atmosphere model] , some fixed still needed done and analyzed...)
    • specify calibration strategy (june/july 04 --> sometime before the engineering run??)
Changed:
<
<

    • project status review meeting in Philly, with extended working visit (jun04)
>
>

      • We still have issues to sort out in OBIT but no time to work on this in the near term. Maybe just wait until real data.
    • project status review meeting in Philly, with extended working visit (jun04 done)
    • RFI Enclosure design finished (Q1 04 --> august04 --> Sep 2004)
    • RFI Enclosure and mounting hardware manufactured, fit checked, and delivered to Penn (end Dec 2004)
    • Manufacture final lenses for Penn (dec 2004)
    • GBT does a daisy scan from within IRC (15feb05)
Changed:
<
<

6. Resource Requests for Cycle 6 2004 (15aug04 - 01oct04)

>
>

6. Resource Requests for Cycle 7 2004 (01oct04 - 15nov04)

Added:
>
>

Added:
>
>


 <<O>>  Difference Topic PennArrayReceiver (r1.26 - 30 Jul 2004 - BrianMason)
Changed:
<
<

6. Resource Requests for Cycle 5 2004 (start Jul 2004 - mid Aug 2004)

>
>

6. Resource Requests for Cycle 6 2004 (15aug04 - 01oct04)

Added:
>
>


 <<O>>  Difference Topic PennArrayReceiver (r1.25 - 17 Jun 2004 - BrianMason)
Changed:
<
<

6. Resource Requests for Cycle 3 2004 (May 15 2004 - Jun 30 2004)

>
>

6. Resource Requests for Cycle 5 2004 (start Jul 2004 - mid Aug 2004)

Changed:
<
<

>
>


 <<O>>  Difference Topic PennArrayReceiver (r1.24 - 06 May 2004 - BrianMason)
Changed:
<
<

    • Final MUX operational in lab with dummy bolometers (01feb04 --> 01may04)
>
>

    • Final MUX operational in lab with dummy bolometers (01feb04 --> 01may04 --> early Jun?)
Changed:
<
<

    • Cooldown of final cryostat (25mar04)
    • Finish Optics construction (30apr04)
    • Working detectors delivered to Penn (17may04)
    • Integrate detectors to final cryostat (14jun04)
    • Construction complete/begin testing final instrument (06sep04)
    • Delivery to GB (Sep 04 --> 25oct04)
>
>

      • 06may04: waiting on Tekdata cables for cold operation; these are in progress, expected in ~4 weeks from now.
    • Cooldown of final cryostat (25mar04 --> done 05may04 -- & 20mK colder than test cryostat and old fridge!)
    • Finish Optics construction (30apr04 --> ...)
    • Working detectors delivered to Penn (17may04 --> ...)
    • Integrate detectors to final cryostat (14jun04 --> ...)
    • Construction complete/begin testing final instrument (06sep04 --> ...)
    • Delivery to GB (Sep 04 --> 25oct04?)
Changed:
<
<

    • Better Simulated Datasets (15jan04 --> when Brian has time)
    • RFI Enclosure for PAR finished (Q1 04 --> later in the summer or fall: TBD)
    • specify calibration strategy (summer04)
    • DAQ Interface finalized and documented (early may 04)-- includes OS issues, timestamping-- GSFC working on this now.
    • Bill Cotton's package analyzes simulated datasets (early Jul 04-- done but need better sims as per above)
>
>

    • Better Simulated Datasets (15jan04 --> done apr04 [mosaicking, skydips, other scan patterns, improved atmosphere model] , some fixed still needed)
    • RFI Enclosure for PAR finished (Q1 04 --> august04)
    • specify calibration strategy (june/july 04)
    • DAQ Interface finalized and documented (early may 04 --> late may 04)-- includes OS issues, timestamping-- GSFC working on this now.
    • Bill Cotton's package analyzes simulated datasets (early Jul 04-- done but still iterating on simulation improvements [may04])
Changed:
<
<

6. Resource Requests for Cycle 3 2004 (April 05 - May 14 2004)

>
>

6. Resource Requests for Cycle 3 2004 (May 15 2004 - Jun 30 2004)

Added:
>
>


 <<O>>  Difference Topic PennArrayReceiver (r1.23 - 05 May 2004 - BrianMason)
Changed:
<
<

>
>


 <<O>>  Difference Topic PennArrayReceiver (r1.22 - 18 Mar 2004 - RichardPrestage)
Changed:
<
<

The CCB is being funded through NRAO’s university-built instrumentation program.

>
>

The PAR is being funded through NRAO’s university-built instrumentation program.


 <<O>>  Difference Topic PennArrayReceiver (r1.21 - 17 Mar 2004 - BrianMason)
Changed:
<
<

5. Three-Month Goals

  • Hold CDR
  • Finish final dewar constr (Target Delivery Date: 03Dec03)
  • Visit GSFC to learn about MUX/Detector parameter choice optimization (Mason; Nov/Dec 03)
  • Document requests for new antenna modes
  • Validate IDL simulation sensitivities; import arbitrary scan patterns.
  • Detector details to sort out with GSFC/Penn
    • final 1/f, tau targets
    • dark bolometers
  • multibeam pointing algorithms [may depend on Penn Graduate student Michell Caler's availability]

6. Long Term Goals

  • Penn Milestones
    • Take delivery of final cryostat (early Dec03)
    • Final MUX operational in lab (01feb04)
    • Finish Optics construction (02apr04)
    • Integrate detectors to final cryostat (17may04)
    • Construction complete/begin testing final instrument (14jun04)
    • Delivery to GB (Sep/Oct 04)
  • GB Milestones
    • Simulated Datasets (15jan04)
    • RFI Enclosure for PAR finished (Q1 04)
    • Memo specifying calibration strategy written (early may 04)
    • DAQ Interface finalized and documented (early may 04)-- includes OS issues, timestamping
    • FITS file specification memo (early Jun 04)
    • Bill Cotton's package analyzes simulated datasets (early Jul 04)
    • YGOR Manager complete (early Aug 04)-- tests w/Rx in lab can begin over network
    • Linear Inversion imaging of selected science cases (early Sep 04)
    • High Level Software ready for commissioning (end Oct 04)
>
>

5. Milestones

Changed:
<
<

7. Resource Requests for Cycle 3 2004 (April 05 - May 14 2004)

>
>

  • Penn / GSFC
    • Take delivery of final cryostat (early Dec03 -- done)
    • Final MUX operational in lab with dummy bolometers (01feb04 --> 01may04)
      • nb: preliminary MUX has been operated in black-box mode at Penn, still awaiting firmware upgrades, cold operation, etc
    • Cooldown of final cryostat (25mar04)
    • Finish Optics construction (30apr04)
    • Working detectors delivered to Penn (17may04)
    • Integrate detectors to final cryostat (14jun04)
    • Construction complete/begin testing final instrument (06sep04)
    • Delivery to GB (Sep 04 --> 25oct04)
  • GB
    • Tests of new scan modes/observing procedures (30dec03 --> done)
    • collaboration meetings (GSFC nov 03; GSFC & Princeton feb04; done)
    • Better Simulated Datasets (15jan04 --> when Brian has time)
    • RFI Enclosure for PAR finished (Q1 04 --> later in the summer or fall: TBD)
    • specify calibration strategy (summer04)
    • DAQ Interface finalized and documented (early may 04)-- includes OS issues, timestamping-- GSFC working on this now.
    • Bill Cotton's package analyzes simulated datasets (early Jul 04-- done but need better sims as per above)
    • project status review meeting in Philly, with extended working visit (jun04)
    • YGOR Manager complete (early Aug 04-- put off to 2005 at the earliest)

6. Resource Requests for Cycle 3 2004 (April 05 - May 14 2004)

Changed:
<
<

8. Project Artifacts

>
>

7. Project Artifacts

Changed:
<
<

9. Other Information

>
>

8. Random Notes, Links &c.

  • We need to work out a plan to incorporate GB engineering personnel into lab testing (at Penn & GB) meaningfully, and otherwise start transferring expertise needed for maintenance.
  • Links

 <<O>>  Difference Topic PennArrayReceiver (r1.20 - 15 Mar 2004 - RichardPrestage)
Changed:
<
<

7. Resource Requests for Cycle 2 2004 (Feb 14 '04 - Mar 31 '04)

>
>

7. Resource Requests for Cycle 3 2004 (April 05 - May 14 2004)

Added:
>
>


 <<O>>  Difference Topic PennArrayReceiver (r1.19 - 09 Feb 2004 - RichardPrestage)
Changed:
<
<

  • Electronics Division Request?
>
>


 <<O>>  Difference Topic PennArrayReceiver (r1.18 - 09 Feb 2004 - BrianMason)
Changed:
<
<

7. Resource Requests for Cycle 1 2004 (January 1 2004 - February 13 2004)

>
>

7. Resource Requests for Cycle 2 2004 (Feb 14 '04 - Mar 31 '04)

Changed:
<
<

    • Cycle 7 (August 18 2003 - October 1 2003)
    • Cycle 8 (Oct 1 2003 - 15 Nov 2003)
    • Cycle 9 (Nov 15 2003 - Dec 31 2003)
>
>


 <<O>>  Difference Topic PennArrayReceiver (r1.17 - 13 Dec 2003 - RichardPrestage)
Changed:
<
<

7. Current Cycle requests (15nov03 - 31dec03 = Cycle 9)

>
>

7. Resource Requests for Cycle 1 2004 (January 1 2004 - February 13 2004)

Changed:
<
<

>
>

    • Cycle 7 (August 18 2003 - October 1 2003)
    • Cycle 8 (Oct 1 2003 - 15 Nov 2003)
    • Cycle 9 (Nov 15 2003 - Dec 31 2003)
Changed:
<
<

>
>


 <<O>>  Difference Topic PennArrayReceiver (r1.16 - 13 Dec 2003 - RichardPrestage)
Changed:
<
<

    • q1-2003-rept-par?[Q1 2003]
    • q2-2003-rept-par?[Q2 2003]
    • q3-2003-rept-par?[Q3 2003]
>
>


 <<O>>  Difference Topic PennArrayReceiver (r1.15 - 07 Nov 2003 - BrianMason)
Changed:
<
<

  • Summary: Finish Dewar; visit GSFC (Mason); New Antenna Mode Tests (Mason w/SDD support)-- also a CCB work package; compile & test SCUBA-2 simulator; import arbitrary scan patterns to simulator; work with Michelle Caler on pointing and simulation issues.
>
>

  • Summary: Finish Dewar; visit GSFC (Mason); compile & test SCUBA-2 simulator; import arbitrary scan patterns to simulator; work with Michelle Caler on pointing and simulation issues.

 <<O>>  Difference Topic PennArrayReceiver (r1.14 - 04 Nov 2003 - BrianMason)
Changed:
<
<

7. Current Cycle requests (01oct-15nov 2003=Cycle 8)

>
>

7. Current Cycle requests (15nov03 - 31dec03 = Cycle 9)

Added:
>
>


 <<O>>  Difference Topic PennArrayReceiver (r1.13 - 07 Oct 2003 - BrianMason)
Added:
>
>

  • Visit GSFC to learn about MUX/Detector parameter choice optimization (Mason; Nov/Dec 03)

 <<O>>  Difference Topic PennArrayReceiver (r1.12 - 06 Oct 2003 - BrianMason)
Changed:
<
<

  • IDL simulation improvements & multibeam pointing algorithms [?]
>
>

  • Validate IDL simulation sensitivities; import arbitrary scan patterns.
  • Detector details to sort out with GSFC/Penn
    • final 1/f, tau targets
    • dark bolometers
  • multibeam pointing algorithms [may depend on Penn Graduate student Michell Caler's availability]
Deleted:
<
<

    • CDR 17/18 Oct 2003
    • Complete & Ship Final Dewar (03 Dec 2003)
    • Document new antenna mode requests (Dec 03)
Changed:
<
<

8. PREVIOUS CYCLE requests

>
>

8. Project Artifacts

  • Previous Cycle Requests
Added:
>
>

  • Quarterly Reports
    • q1-2003-rept-par?[Q1 2003]
    • q2-2003-rept-par?[Q2 2003]
    • q3-2003-rept-par?[Q3 2003]

 <<O>>  Difference Topic PennArrayReceiver (r1.11 - 05 Oct 2003 - BrianMason)
Added:
>
>

    • CDR 17/18 Oct 2003
    • Complete & Ship Final Dewar (03 Dec 2003)

 <<O>>  Difference Topic PennArrayReceiver (r1.10 - 30 Sep 2003 - BrianMason)
Added:
>
>

See Current cycle requests

Changed:
<
<

7. Current Cycle requests (01oct-15nov 2003)

  • CDR Support (Electronis/Software): review of documents, participation in 20&21 Oct review as feasible.
>
>

  • Penn Milestones
    • Take delivery of final cryostat (early Dec03)
    • Final MUX operational in lab (01feb04)
    • Finish Optics construction (02apr04)
    • Integrate detectors to final cryostat (17may04)
    • Construction complete/begin testing final instrument (14jun04)
    • Delivery to GB (Sep/Oct 04)
  • GB Milestones
    • Document new antenna mode requests (Dec 03)
    • Simulated Datasets (15jan04)
    • RFI Enclosure for PAR finished (Q1 04)
    • Memo specifying calibration strategy written (early may 04)
    • DAQ Interface finalized and documented (early may 04)-- includes OS issues, timestamping
    • FITS file specification memo (early Jun 04)
    • Bill Cotton's package analyzes simulated datasets (early Jul 04)
    • YGOR Manager complete (early Aug 04)-- tests w/Rx in lab can begin over network
    • Linear Inversion imaging of selected science cases (early Sep 04)
    • High Level Software ready for commissioning (end Oct 04)

7. Current Cycle requests (01oct-15nov 2003=Cycle 8)

  • CDR Support (Electronis/Software/Mech): review of documents, participation in 17&18 Oct review as feasible.
Changed:
<
<

8. PREVIOUS CYCLE requests(August 18 2003 - October 1 2003)

NOTE
we are nominally planning on a CDR on the cycle7/cycle8 boundary, although we will not officially set a date for the CDR until 15aug. Future decisions like this can be better synchronized with the planning process.
>
>

8. PREVIOUS CYCLE requests

* Par03Cycle7Rq[Cycle 7] (August 18 2003 - October 1 2003)

Added:
>
>


 <<O>>  Difference Topic PennArrayReceiver (r1.9 - 30 Sep 2003 - RichardPrestage)
Added:
>
>


 <<O>>  Difference Topic PennArrayReceiver (r1.8 - 26 Sep 2003 - BrianMason)
Deleted:
<
<

  • Guide Penn team in writing the documentation we need to write the manager.
  • Receiver Room vibration measurement
  • New Stepper Motor RFI measurement
Deleted:
<
<

  • Finalize Penn/GB Interfaces (mech; software; electronics; RFI) as needed for the CDR
Changed:
<
<

>
>

  • Finish final dewar constr (Target Delivery Date: 03Dec03)
  • Document requests for new antenna modes
  • IDL simulation improvements & multibeam pointing algorithms [?]
Added:
>
>

-- BrianMason - 26 Sep 2003


 <<O>>  Difference Topic PennArrayReceiver (r1.7 - 22 Sep 2003 - BrianMason)
Changed:
<
<

7. Current Cycle Requests (August 18 2003 - October 1 2003)

>
>

7. Current Cycle requests (01oct-15nov 2003)

  • CDR Support (Electronis/Software): review of documents, participation in 20&21 Oct review as feasible.
  • Mechanical Division: construction of Penn Array dewar (already proceeding)

8. PREVIOUS CYCLE requests(August 18 2003 - October 1 2003)

Changed:
<
<

8. Other Information

>
>

9. Other Information

Changed:
<
<

%META:FILEATTACHMENT{name="pennarraygb.pdf" attr="" comment="Draft 2004 Penn Array Schedule (GB point of view)" date="1061320455" path="pennarraygb.pdf" size="59597" user="BrianMason" version="1.1"}%

>
>

%META:FILEATTACHMENT{name="pennarraygb.pdf" attr="" comment="" date="1062357159" path="pennarraygb.pdf" size="64635" user="BrianMason" version="1.1"}%


 <<O>>  Difference Topic PennArrayReceiver (r1.6 - 19 Aug 2003 - BrianMason)
Added:
>
>

%META:FILEATTACHMENT{name="pennarraygb.pdf" attr="" comment="Draft 2004 Penn Array Schedule (GB point of view)" date="1061320455" path="pennarraygb.pdf" size="59597" user="BrianMason" version="1.1"}%


 <<O>>  Difference Topic PennArrayReceiver (r1.5 - 31 Jul 2003 - RichardPrestage)
Changed:
<
<

The Penn Array Receiver is a 64-pixel continuum imaging system for the 3mm band. The project is a collaboration of the University of Pennsylvania, NASA-Goddard Space Flight Center and the NRAO. The project is being funded through NRAO’s university-built instrumentation program. The project was formally initiated in the first quarter of 2002 with the signing of a memorandum of agreement between NRAO and Upenn. The NRAO is providing instrument machining services, control software and the interface to GBT systems, and data analysis software. The Penn Array Receiver will be designed as a facility instrument, accessible to all GBT Users. The Critical Design Review is expected to be held in Fall 2003, and scheduled delivery is in early 2005. More details on the PAR are available from Brian Mason’s

>
>

The Penn Array Receiver is a 64-pixel continuum imaging system for the 3mm band. The project is a collaboration of the University of Pennsylvania, NASA-Goddard Space Flight Center and the NRAO. The project is being funded through NRAO’s university-built instrumentation program. The project was formally initiated in the first quarter of 2002 with the signing of a memorandum of agreement between NRAO and Upenn. The NRAO is providing instrument machining services, control software and the interface to GBT systems, and data analysis software. The Penn Array Receiver will be designed as a facility instrument, accessible to all GBT Users. The Critical Design Review is expected to be held in Fall 2003, and scheduled delivery is in early 2005. More details on the PAR are available from Brian Mason’s

Changed:
<
<

The CCB is being funded through NRAO’s university-built instrumentation program.

>
>

The CCB is being funded through NRAO’s university-built instrumentation program.

Changed:
<
<

  • Project Manager: BrianMason?
  • Project Engineer: RogerNorrod?
  • Project Scientist: BrianMason?
>
>

Changed:
<
<

7. Current Cycle Requests (Cycle 7= Aug 18 - Oct 1 2003)

>
>

7. Current Cycle Requests (August 18 2003 - October 1 2003)

Changed:
<
<

  • Electronics Group
    • New Stepper Motor RFI Measurements
    • Review of CDR Documents, Participation in CDR
    • Continued support for Penn detailed design phase (advice/consultation)
    • Deliver optical interface circuit design (for cal diodes)
  • Receiver Group
    • Follow up on Rx Room Vibration Measurements if needed
    • Review of CDR Documents, Participation in CDR
    • Assist Dennis in ordering materials for Final Dewar prior to 01sep03 (RN)
    • Continued support for Penn detailed design phase (advice/consultation)
  • Mechanical/Machine Shop
    • Estimate Construction time for Final Dewar (we expect drawings by 01sep03)
    • Order materials for final dewar prior to 01sep03
    • Build final dewar
  • Software Group
    • Review electronics/software interface documents to be provided by Penn (goal is a CDR level document. I think we will get their first draft by late Aug).
  • Scientific Services
    • Write Acceptance Tests
    • Work with Penn Graduate Student on multi-beam pointing and other quick-look software
    • Further effort as needed (to follow detector development, or electronics & interfaces)
    • in all, ~ 15% of Brian's time over the cycle.
>
>


 <<O>>  Difference Topic PennArrayReceiver (r1.4 - 28 Jul 2003 - BrianMason)
Changed:
<
<

>
>


 <<O>>  Difference Topic PennArrayReceiver (r1.3 - 28 Jul 2003 - BrianMason)
Changed:
<
<

7. Other Information

>
>

7. Current Cycle Requests (Cycle 7= Aug 18 - Oct 1 2003)

NOTE
we are nominally planning on a CDR on the cycle7/cycle8 boundary, although we will not officially set a date for the CDR until 15aug. Future decisions like this can be better synchronized with the planning process.
  • Electronics Group
    • New Stepper Motor RFI Measurements
    • Review of CDR Documents, Participation in CDR
    • Continued support for Penn detailed design phase (advice/consultation)
    • Deliver optical interface circuit design (for cal diodes)
  • Receiver Group
    • Follow up on Rx Room Vibration Measurements if needed
    • Review of CDR Documents, Participation in CDR
    • Assist Dennis in ordering materials for Final Dewar prior to 01sep03 (RN)
    • Continued support for Penn detailed design phase (advice/consultation)
  • Mechanical/Machine Shop
    • Estimate Construction time for Final Dewar (we expect drawings by 01sep03)
    • Order materials for final dewar prior to 01sep03
    • Build final dewar
  • Software Group
    • Review electronics/software interface documents to be provided by Penn (goal is a CDR level document. I think we will get their first draft by late Aug).
  • Scientific Services
    • Write Acceptance Tests
    • Work with Penn Graduate Student on multi-beam pointing and other quick-look software
    • Further effort as needed (to follow detector development, or electronics & interfaces)
    • in all, ~ 15% of Brian's time over the cycle.
Added:
>
>

8. Other Information


 <<O>>  Difference Topic PennArrayReceiver (r1.2 - 21 Jul 2003 - BrianMason)
Deleted:
<
<

Added:
>
>

The Penn Array receiver will be the first major new mm wave capability on the GBT, and will have significant scientific impacts on a wide range of fields such as the study of high redshift galaxies, the Sunyaev-Zel'dovich Effect, and star formation in our Galaxy.

Changed:
<
<

>
>

  • Guide Penn team in writing the documentation we need to write the manager.
  • Receiver Room vibration measurement
  • New Stepper Motor RFI measurement
Changed:
<
<

>
>

  • Finalize Penn/GB Interfaces (mech; software; electronics; RFI) as needed for the CDR
  • Hold CDR
Deleted:
<
<


 <<O>>  Difference Topic PennArrayReceiver (r1.1 - 16 Jun 2003 - NicoleRadziwill)
Added:
>
>

%META:TOPICINFO{author="NicoleRadziwill" date="1055798821" format="1.0" version="1.1"}% %META:TOPICPARENT{name="WebHome"}%

Penn Array Receiver


1. Scope

The Penn Array Receiver is a 64-pixel continuum imaging system for the 3mm band. The project is a collaboration of the University of Pennsylvania, NASA-Goddard Space Flight Center and the NRAO. The project is being funded through NRAO’s university-built instrumentation program. The project was formally initiated in the first quarter of 2002 with the signing of a memorandum of agreement between NRAO and Upenn. The NRAO is providing instrument machining services, control software and the interface to GBT systems, and data analysis software. The Penn Array Receiver will be designed as a facility instrument, accessible to all GBT Users. The Critical Design Review is expected to be held in Fall 2003, and scheduled delivery is in early 2005. More details on the PAR are available from Brian Mason’s GBT High Frequency Instrumentation Development web page. The CCB is being funded through NRAO’s university-built instrumentation program.

2. Strategic Value

3. Personnel

The following refers to GBT contact staff, not actual instrument builders.
  • Project Manager: BrianMason?
  • Project Engineer: RogerNorrod?
  • Project Scientist: BrianMason?
  • Project Team: ?

4. Work Packages

5. Three-Month Goals

6. Long Term Goals

7. Other Information


Topic PennArrayReceiver . { View | Diffs | r1.38 | > | r1.37 | > | r1.36 | More }
Revision r1.1 - 16 Jun 2003 - 21:27 GMT - NicoleRadziwill
Revision r1.38 - 19 Dec 2005 - 22:05 GMT - BrianMason