| Changed: |
< < |
| Modification requests - All Sections Complete | 3/31/07 | 5/15/07 | Design and testing sections will be complete upon deployment. |
|
> > |
| Modification requests - All Sections Complete | 3/31/07 | 9/1/07 | Design and testing sections will be complete upon deployment. |
|
| Changed: |
< < |
|
> > |
| Review panel | 04/24/2007 | | Complete |
|
| Changed: |
< < |
| Project complete | 02/15/07 | 04/15/06 | |
|
> > |
| Project complete | 02/15/07 | 04/15/06 | Complete |
|
| Changed: |
< < |
| Version 2.0 of Observing Manual completed | 04/01/07 | 4/20/07 | |
|
> > |
| Version 2.0 of Observing Manual completed | 04/01/07 | 4/20/07 | Complete |
|
| Changed: |
< < |
| Proposal review | 06/01/07 | | |
| Final proposal complete | 06/30/07 | | |
| Stage I tools complete, Dynamic scheduling commences | 06/01/08 | | |
| Stage II tools complete | 06/01/09 | | |
|
> > |
| Proposal review | 06/01/07 | 06/06/07 | Complete |
| Final proposal complete | 06/30/07 | 08/15/07 | Implementing changes from the reviews; Delayed due to less staff than anticipated |
| Stage I tools complete, Dynamic scheduling commences | 06/01/08 | 10/01/08 | Delayed due to less staff than anticipated |
| Stage II tools complete | 06/01/09 | 10/01/09 | Delayed due to less staff than anticipated |
|
| Changed: |
< < |
| Main Servo complete | 06/30/07 | 08/30/07 | |
|
> > |
| Main Servo complete | 06/30/07 | 08/30/07 | |
|
| Changed: |
< < |
| Subreflector nod tests memo released | 04/01/07 | | |
|
> > |
| Subreflector nod tests memo released | 04/01/07 | 05/03/07 | Complete |
|
| Changed: |
< < |
| Test YGOR manager on MUSTANG on GBT | 01/30/08 | | |
| Write up results from 2nd engineering run | 03/30/08 | | |
|
> > |
| Test YGOR manager on MUSTANG on GBT | 01/30/08 | | |
| Document results from 2nd engineering run | 03/30/08 | | |
|
| Changed: |
< < |
| Upgrade of pointing model with track terms | 09/30/07 | | |
| Transfer of pointing model generation ability to Green Bank | 12/31/07 | | |
| Streamlining of OOF Holography procedure | 02/01/08 | | |
| Upgrade of traditional Holography Manager | 10/31/07 | | |
|
> > |
| Upgrade of pointing model with track terms | 09/30/07 | | |
| Transfer of pointing model generation ability to Green Bank | 04/01/07 | 12/31/07 | |
| Streamlining of OOF Holography procedure | 02/01/08 | | |
| Upgrade of traditional Holography Manager | 10/31/07 | | |
|
|
|
| Changed: |
< < |
| Deploy BOS to Socorro and Green Bank | 5/15/07 | | |
|
> > |
| Deploy BOS to Socorro and Green Bank | 5/15/07 | 9/1/07 | Getting sponsor feedback and the sponsor testing process has been slower than expected. |
|
| Changed: |
< < |
| Subreflector nod tests memo released | 04/01/07 | |
|
> > |
| Subreflector nod tests memo released | 04/01/07 | | |
|
| Changed: |
< < |
| Upgrade of pointing model with track terms | 09/30/07 | |
|
> > |
| Upgrade of pointing model with track terms | 09/30/07 | | |
|
| Changed: |
< < |
| Streamlining of OOF Holography procedure | 02/01/08 | |
| Upgrade of traditional Holography Manager | 10/31/07 | |
| Recommissioning of traditional holography receiver | 04/01/08 | |
|
> > |
| Streamlining of OOF Holography procedure | 02/01/08 | | |
| Upgrade of traditional Holography Manager | 10/31/07 | | |
| Recommissioning of traditional holography receiver | 04/01/08 | | |
|
| Changed: |
< < |
| Project assesment complete | 08/31/07 | | |
|
> > |
| Project assesment complete | 08/31/07 | | This is on-hold indefinitely pending resource allocation. |
|
|
|
| Changed: |
< < |
| Upgrade Complete | 02/15/07 | 07/31/07 | Will be performed during summer shutdown |
|
> > |
| Upgrade Complete | 02/15/07 | 08/31/07 | Will be performed during summer shutdown |
|
| Changed: |
< < |
| First version of the iBob and ADC modules produced and documented | 06/01/07 | | |
|
> > |
| First version of the iBob and ADC modules produced and documented | 06/01/07 | 06/28/07 | Complete |
|
| Changed: |
< < |
| Initial PLC Design Complete | 01/15/07 | 02/28/07 | |
| PLC Programming Complete | 02/28/07 | 03/30/07 | |
| PLC Interface Cards Procured | 02/28/07 | | |
| Panels wired and tested | 04/30/07 | | |
| All programming complete | 05/31/07 | | |
| Main Servo installation begins | 06/01/07 | | |
| Main Servo complete | 06/30/07 | | |
| Secondary Servo installation begins | 07/01/07 | | |
| Secondary Servo installation complete | 07/31/07 | | |
| Project cleanup | 08/01/07 | | |
| Project Complete | 08/31/07 | | |
|
> > |
| Initial PLC Design Complete | 01/15/07 | 02/28/07 | Complete |
| PLC Programming Complete | 02/28/07 | 07/30/07 | |
| PLC Interface Cards Procured | 02/28/07 | | Complete |
| Panels wired and tested | 04/30/07 | | 07/30/07 |
| All programming complete | 05/31/07 | | 07/30/07 |
| Main Servo installation begins | 06/01/07 | 08/07/07 | |
| Main Servo complete | 06/30/07 | 08/30/07 | |
| Secondary Servo installation begins | 07/01/07 | 05/01/08 | |
| Secondary Servo installation complete | 07/31/07 | 05/31/08 | |
| Project cleanup | 08/01/07 | 08/01/08 | |
| Project Complete | 08/31/07 | 08/31/08 | |
|
| Changed: |
< < |
| Trajectory Generations and Servo improvements complete | 12/31/06 | 4/30/2007 | Only slow-speed tracking improvements |
| Short-term slow-speed tracking improvements complete | 09/30/06 | 3/15/2007 | |
|
> > |
| Trajectory Generations and Servo improvements complete | 12/31/06 | 8/30/2007 | Only slow-speed tracking improvements |
| Short-term slow-speed tracking improvements complete | 09/30/06 | 8/15/2007 | |
|
| Changed: |
< < |
| Wind measuring instruments design complete | 07/10/07 | | |
| PLC interlock system installed | 08/31/07 | | |
|
> > |
| Wind measuring instruments design complete | 07/10/07 | | On Hold |
| PLC interlock system installed | 08/31/08 | | |
|
| Changed: |
< < |
| Laser Range Finder V2 development complete | 09/31/07 | | |
|
> > |
| Laser Range Finder V2 development complete | 09/31/07 | 03/01/08 | |
|
| Changed: |
< < |
| Control System upgrade complete | 10/01/06 | 03/31/07 | |
|
> > |
| Control System upgrade complete | 10/01/06 | 03/31/07 | Complete |
|
| Changed: |
< < |
| LTA fix Complete | 10/01/07 | 07/15/07 | |
|
> > |
| LTA fix Complete | 10/01/07 | 09/15/07 | |
|
|
|
| Deleted: |
< < |
|
| Changed: |
< < |
| Work Plan and Schedule complete | 10/01/06 | 10/10/06 | 10/10/06 |
| First 24 wear and base plates manufactured | 01/31/07 | 03/01/07 | 3/13/07 |
| Next 24 wear and base plates manufactured | 03/30/07 | 4/2/07 | |
| All components on site | 03/30/07 | 4/5/07 | |
| Refurbishment starts | 05/01/07 | 4/30/07 | |
|
> > |
| Work Plan and Schedule complete | 10/01/06 | 10/10/06 | Complete |
| First 24 wear and base plates manufactured | 01/31/07 | 03/13/07 | Complete |
| Next 24 wear and base plates manufactured | 03/30/07 | 4/2/07 | |
| All components on site | 03/30/07 | 4/5/07 | |
| Refurbishment starts | 05/01/07 | 4/30/07 | |
|
| Changed: |
< < |
| Documentation of current calibration procedures complete | 10/31/06 | 2/16/06 | Complete and available on the GBTIDL web page |
|
> > |
| Documentation of current calibration procedures complete | 10/31/06 | 2/16/06 | Complete |
|
| Added: |
> > |
|
| Changed: |
< < |
| Version 2.0 of Observing Manual completed | 04/01/07 | | Will be available by 4/20/07 |
|
> > |
| Version 2.0 of Observing Manual completed | 04/01/07 | 4/20/07 | |
|
| Changed: |
< < |
| Test Phase Complete | 04/31/07 | 10/31/07 | Test phase moved to fall to ease burden on GBT observers |
|
> > |
| Test Phase I Complete | 04/31/07 | 9/31/07 | Test phase moved to fall to ease burden on GBT observers |
|
| Changed: |
< < |
| Stage I tools complete, Dynamic scheduling commences | 02/01/08 | | |
| Stage II tools complete | 02/01/09 | | |
|
> > |
| Stage I tools complete, Dynamic scheduling commences | 06/01/08 | | |
| Stage II tools complete | 06/01/09 | | |
| FPGA Development Project |
| First version of the iBob and ADC modules produced and documented | 06/01/07 | | |
|
| Changed: |
< < |
| Subreflector NOD tests | 2/15/07 | 03/01/06 | Complete, memo by 4/1/07 |
|
> > |
| Subreflector NOD tests | 2/15/07 | 03/01/06 | Complete |
| Subreflector nod tests memo released | 04/01/07 | |
|
| Deleted: |
< < |
| The remaining Spectrometer milestones need to be replaced by new ones in light of the change to simply fix the FPGA socket problem |
|
| Changed: |
< < |
| LTA upgrade schedule available | 9/01/06 | 11/09/06 | |
| DSP analysis complete | 11/15/06 | | |
| Cross correlation MRs complete | 11/15/06 | 2/15/07 (12/21/06) | |
|
> > |
| Cross correlation MRs complete | 11/15/06 | 2/15/07 | |
|
| Changed: |
< < |
| LTA upgrade complete | 10/01/07 | 07/15/07 | |
|
> > |
| LTA fix Complete | 10/01/07 | 07/15/07 | |
|
| Changed: |
< < |
| Science validation complete | 05/31/07 | | |
|
> > |
| Science validation complete | 06/01/08 | | |
|
| Changed: |
< < |
Control System Upgrades (Inter-scan Latency Reduction Project, Unified Messaging, Fits data streams) |
|
> > |
Control System Upgrades (Inter-scan Latency Reduction Project, Unified Messaging, Fits data streams) |
|
|
|
| Changed: |
< < |
| Documentation of current calibration procedures complete | 10/31/06 | 2/16/06 | Complete, still to be circulated |
|
> > |
| Documentation of current calibration procedures complete | 10/31/06 | 2/16/06 | Complete and available on the GBTIDL web page |
|
| Changed: |
< < |
| Chapter 3: Observing Strategies; released for comment | 01/12/07 | | To be released with Cptr 1 |
| Chapter 6: Tutorial on Weather and Dyn Sched; released for comment | 01/26/07 | | |
| Chapter 1: Intro to Astrid; released for comment | 02/09/07 | | |
| Chapter 4: GBT IF System; released for comment | 02/16/07 | | |
| Chapter 5: RFI; released for comment | 03/2/07 | | |
| Chapter 7: Before your Observing; released for comment | 03/9/07 | | |
| Chapter 8: After your Observing; released for comment | 03/9/07 | | |
| Version 2.0 of Observing Manual completed | 04/01/07 | | |
|
> > |
| Chapter 3: Observing Strategies; released for comment | 01/12/07 | 3/6/07 | Complete |
| Chapter 6: Tutorial on Weather and Dyn Sched; released for comment | 01/26/07 | 3/6/07 | Complete |
| Chapter 1: Intro to Astrid; released for comment | 02/09/07 | 3/6/07 | Complete |
| Chapter 4: GBT IF System; released for comment | 02/16/07 | 3/6/07 | Complete |
| Chapter 5: RFI; released for comment | 03/2/07 | 3/6/07 | Complete |
| Chapter 7: Before your Observing; released for comment | 03/9/07 | 3/6/07 | Complete |
| Chapter 8: After your Observing; released for comment | 03/9/07 | 3/6/07 | Complete |
| Version 2.0 of Observing Manual completed | 04/01/07 | | Will be available by 4/20/07 |
|
| Changed: |
< < |
| Subreflector NOD tests | 2/15/07 | 03/01/06 | New commissioning exercise |
|
> > |
| Subreflector NOD tests | 2/15/07 | 03/01/06 | Complete, memo by 4/1/07 |
|
|
|
| Changed: |
< < |
| 43m regular Space craft tracking | 05/01/06 | On-going | |
| MLLN tunable receiver up/down-converter installed | 08/18/06 | 11/30/06 | Complete |
| Cooled (70K) Dewar installed | 01/30/07 | | | |
| Improved CITECH system health reporting | 02/28/07 | | |
|
> > |
| MLLN tunable receiver installed | 08/18/06 | 11/30/06 | Complete |
| Cooled (70K) Dewar installed | 01/30/07 | 01/07/07 | Complete |
| Improved CITECH system health reporting | 02/28/07 | | |
|
| Changed: |
< < |
| All components on site | 03/30/07 | | |
| Begin track replacement field work | 05/01/07 | | |
| Welding plan and schedule complete | 08/31/06 | | Complete |
| Contractor work/safety plan and schedule complete | 10/10/06 | | Complete |
| First 24 wear and base plates manufactured | 01/31/07 | | |
|
> > |
| Welding plan and schedule complete | 08/31/06 | /08/31/06 | Complete |
| Contractor work/safety plan and schedule complete | 10/01/06 | 10/01/06 | Complete |
| Work Plan and Schedule complete | 10/01/06 | 10/10/06 | 10/10/06 |
| First 24 wear and base plates manufactured | 01/31/07 | 03/01/07 | |
|
| Changed: |
< < |
| Refurbishment starts | 04/30/07 | | |
|
> > |
| All components on site | 03/30/07 | | |
| Refurbishment starts | 05/01/07 | | |
|
| Changed: |
< < |
| 3rd CCB Detector finished | 09/01/06 | 03/31/07 | Delayed due to work on ALMA and Spectrometer LTA |
| 4th CCB Detector finished | 10/01/06 | 03/31/07 | Delayed due to work on ALMA and Spectrometer LTA |
| Project Complete | 10/01/06 | 03/31/07 | Delayed due to work on ALMA and Spectrometer LTA |
|
> > |
| 3rd CCB Detector finished | 09/01/06 | 01/12/07 | Complete |
| 4th CCB Detector finished | 10/01/06 | N/A | Not to be built |
| Project Complete | 10/01/06 | 01/26/07 | Complete - Completion delayed due to work on spectrometer LTA cards |
|
| Changed: |
< < |
| Documentation of current calibration procedures complete | 10/31/06 | 12/29/06 | Complete, still to be circulated |
|
> > |
| Documentation of current calibration procedures complete | 10/31/06 | 2/16/06 | Complete, still to be circulated |
|
| Changed: |
< < |
| Project complete | 02/15/07 | | |
|
> > |
| Project complete | 02/15/07 | 04/15/06 | |
|
| Changed: |
< < |
| Chapter 3: Observing Strategies; released for comment | 01/12/07 | | |
|
> > |
| Chapter 3: Observing Strategies; released for comment | 01/12/07 | | To be released with Cptr 1 |
|
| Changed: |
< < |
| Initial PLC Design Complete | 01/15/07 | | |
| PLC Programming Complete | 02/28/07 | | |
|
> > |
| Initial PLC Design Complete | 01/15/07 | 02/28/07 | |
| PLC Programming Complete | 02/28/07 | 03/30/07 | |
|
| Changed: |
< < |
| Qband comissioning complete | 10/31/06 | 12/14/06 | Moved to accomodate astronomoical observing; Complete |
|
> > |
| Qband comissioning complete | 10/31/06 | 12/14/06 | Moved to accomodate astronomical observing; Complete |
|
| Changed: |
< < |
| Subreflector NOD tests | 2/15/07 | | New commissioning exercise |
|
> > |
| Subreflector NOD tests | 2/15/07 | 03/01/06 | New commissioning exercise |
|
| Changed: |
< < |
| Document results from Fall Commissioning | 12/31/06 | | |
|
> > |
| Document results from Fall Commissioning | 12/31/06 | 03/31/07 | |
|
| Changed: |
< < |
| Short-term slow-speed tracking improvements complete | 09/30/06 | 1/31/2007 (12/21/2006) | |
|
> > |
| Short-term slow-speed tracking improvements complete | 09/30/06 | 3/15/2007 | |
|
| Changed: |
< < |
| Final 10 units complete | 12/01/06 | 2/15/07 | | |
| New GBT fits format |
| Project plan complete | 08/31/07 | | |
|
> > |
| Final 10 units complete | 12/01/06 | 03/31/07 | | |
|
| Changed: |
< < |
| Control System upgrade complete | 10/01/06 | 12/29/06 | |
|
> > |
| Control System upgrade complete | 10/01/06 | 03/31/07 | |
|
| Changed: |
< < |
| GBT RFI monitoring Station Complete | 09/01/06 | 1/31/07 (12/20/06) | Complete on ground. |
|
> > |
| GBT RFI monitoring Station Complete | 09/01/06 | 1/31/07 | Complete on ground. |
|
|
|
| Changed: |
< < |
| 3rd CCB Detector finished | 09/01/06 | 12/29/06 | Delayed due to work on ALMA and Spectrometer LTA |
| 4th CCB Detector finished | 10/01/06 | 12/29/06 | Delayed due to work on ALMA and Spectrometer LTA |
| Project Complete | 10/01/06 | 12/29/06 | Delayed due to work on ALMA and Spectrometer LTA |
|
> > |
| 3rd CCB Detector finished | 09/01/06 | 03/31/07 | Delayed due to work on ALMA and Spectrometer LTA |
| 4th CCB Detector finished | 10/01/06 | 03/31/07 | Delayed due to work on ALMA and Spectrometer LTA |
| Project Complete | 10/01/06 | 03/31/07 | Delayed due to work on ALMA and Spectrometer LTA |
|
| Changed: |
< < |
| Documentation of current calibration procedures complete | 10/31/06 | 12/29/06 | Complete |
|
> > |
| Documentation of current calibration procedures complete | 10/31/06 | 12/29/06 | Complete, still to be circulated |
|
| Changed: |
< < |
| Upgrade Complete | 02/15/07 | | Actual start date depends on the winter Penn Array schedule |
| Comissioning Complete | 03/01/07 | | Actual start date depends on the winter Penn Array schedule |
|
> > |
| Upgrade Complete | 02/15/07 | 07/31/07 | Will be performed during summer shutdown |
| Comissioning Complete | 03/01/07 | 09/30/07 | Will be commissioned after summer shutdown |
|
| Changed: |
< < |
| Quadrant Detector samplers graphic screen complete | 12/29/06 | | Complete |
| Trajectory Generations and Servo improvements complete | 12/31/06 | 3/30/2007 | |
|
> > |
| Quadrant Detector samplers graphic screen complete | 12/29/06 | 12/29/06 | Complete |
| Trajectory Generations and Servo improvements complete | 12/31/06 | 3/31/2007 | |
|
| Added: |
> > |
| The remaining Spectrometer milestones need to be replaced by new ones in light of the change to simply fix the FPGA socket problem |
|
|
|
| Changed: |
< < |
| Project MRs written and reviewed | 11/15/06 | 12/29/2006 | |
|
> > |
| Project MRs written and reviewed | 11/15/06 | 12/29/2006 | Complete |
|
| Changed: |
< < |
| Project charter written | 10/01/06 | 12/29/06 | Delayed due to needing feedback from the business offices |
|
> > |
| Project charter written | 10/01/06 | 12/29/06 | Complete |
|
| Changed: |
< < |
| Subreflector NOD tests | 2/15/07 | | Proposed New Project? |
|
> > |
| Subreflector NOD tests | 2/15/07 | | New commissioning exercise |
|
| Changed: |
< < |
| Quadrant Dector manger complete | 08/15/06 | 09/27/06 | |
| Quadrant Detector samplers graphic screen complete | 12/29/06 | | |
| Trajectory Generations and Servo improvements complete | 12/31/06 | | |
| Short-term slow-speed tracking improvements complete | 09/30/06 | 12/31/06 | |
|
> > |
| Quadrant Dector manager complete | 08/15/06 | 09/27/06 | Complete |
| Quadrant Detector samplers graphic screen complete | 12/29/06 | | Complete |
| Trajectory Generations and Servo improvements complete | 12/31/06 | 3/30/2007 | |
| Short-term slow-speed tracking improvements complete | 09/30/06 | 1/31/2007 (12/21/2006) | |
|
| Changed: |
< < |
| Cross correlation MRs complete | 11/15/06 | 12/29/06 | |
|
> > |
| Cross correlation MRs complete | 11/15/06 | 2/15/07 (12/21/06) | |
|
| Changed: |
< < |
| Comissioning tests complete | 12/01/06 | | |
|
> > |
| Comissioning tests complete | 12/01/06 | 12/01/06 | Complete |
|
| Changed: |
< < |
| GBT RFI monitoring Station Complete | 09/01/06 | 12/31/06 | |
|
> > |
| GBT RFI monitoring Station Complete | 09/01/06 | 1/31/07 (12/20/06) | Complete on ground. |
|
| Changed: |
< < |
| Automatic Updating of zernike Coefficients | 10/06/06 | 09/29/06 | Complete |
|
> > |
| Automatic Updating of Zernike Coefficients | 10/06/06 | 09/29/06 | Complete |
|
| Changed: |
< < |
| Repair astrid "hang-ups" problem | 11/15/06 | 12/1/06 | |
| Turtle/GFM communication upgrade | 11/15/06 | 12/1/06 | |
|
> > |
| Repair astrid "hang-ups" problem | 11/15/06 | 12/31/06 (12/20/06) | |
| Turtle/GFM communication upgrade | 11/15/06 | 12/31/06 (12/20/06) | |
|
|
|
| Changed: |
< < |
| Documentation of current calibration procedures complete | 10/31/06 | 12/29/06 | |
|
> > |
| Documentation of current calibration procedures complete | 10/31/06 | 12/29/06 | Complete |
|
| Changed: |
< < |
| Chapter 2: Intro to SBs and Observing Scripts; released for comment | 12/8/06 | | |
| GBTIDL User's Guide Complete | 12/21/06 | | |
|
> > |
| Chapter 2: Intro to SBs and Observing Scripts; released for comment | 12/8/06 | 12/18/06 | Complete |
| GBTIDL User's Guide Complete | 12/21/06 | 12/22/06 | Complete |
|
| Changed: |
< < |
| Qband comissioning complete | 10/31/06 | 12/14/06 | Moved to accomodate astronomoical observing |
|
> > |
| Qband comissioning complete | 10/31/06 | 12/14/06 | Moved to accomodate astronomoical observing; Complete |
|
| Changed: |
< < |
| Ka comissioning complete | 11/31/06 | 12/14/06 | Moved to accomodate astronomoical observing & Qband commisioning |
|
> > |
| Ka comissioning complete | 11/31/06 | 12/14/06 | Moved to accomodate astronomoical observing & Qband commisioning; Complete |
| Subreflector NOD tests | 2/15/07 | | Proposed New Project? |
|
| Changed: |
< < |
| 10 units complete | 09/01/06 | 11/15/06 | |
| Final 10 units complete | 12/01/06 | 12/31/06 | | |
|
> > |
| 10 units complete | 09/01/06 | 11/15/06 | Complete |
| Final 10 units complete | 12/01/06 | 2/15/07 | | |
|