NRAO Home  >  Green Bank  |  Wiki Topic:    GB > Documents > PennArrayReceiverCycleFive2004Summ
   Changes? | Index? | Contents? | Search? | Go

PennArrayReceiver? Cycle Five 2004 Elec Request

Continued consultation from Roger.

PennArrayReceiver? Cycle Five 2004 Mech Request

Preliminary design for Penn Array mounting hardware (dewar and RFI crate)

Final RFI crate design

(all Pending Simon Dicker's input)

PennArrayReceiver? Cycle Five 2004 Sci Request

Brian for:

PennArrayReceiver? Cycle Five 2004 SDD Request

Background task for Melinda (and/or someone): be available to consult with Brian on python GRAIL interface and GPIB/JNI. If possible, attend a 1-day meeting in GSFC (notionally Monday 2nd Aug)

As background, the GSFC meeting agenda is to begin getting up to speed on IRC implementation of the GBT interface (via python) and the GPIB stuff (test JNI in IRC). The actual implementation of IRC code will be done in the Fall by Simon Dicker, Brian, and GSFC personnel, but SDD consultation will be crucial to the GBT side in particular working.

NOTE: Brian will probably be in Philadelphia for the first two weeks of August.

Topic PennArrayReceiverCycleFive2004Summ . { Edit | Attach | Ref-By | Printable | Diffs | r1.1 | More }
Revision r1.1 - 17 Jun 2004 - 01:13 GMT - TWikiGuest Content copyright © 1999-2007 by the contributing authors.
All material on this collaboration platform is the property of the contributing authors.