PennArrayReceiver? Cycle 4 2004 Electronics

Support for GBT tests with final penn array cryostat (probably a few days time from Roger Norrod). This will involve a more extended run on the telescope with the final (as opposed to test) cryostat, and ideally preceded by a cold trapping of the cryo lines. The date for this run is not set, but we have discussed late June/early July.

PennArrayReceiver? Cycle 4 2004 Mechanical Division Request

Time from a technician to finish RFI enclosure drawings, and work with Simon Dicker to draft a schematic (not necessarily buildable drawings) of how the Penn Array will be mounted in the receiver room.

PennArrayReceiver? Cycle Four 2004 Scientific Services Division Request

Brian at 30% for: visit to Penn to work on cryogenics & MUX; begin thinking about calibration & (lab) bolometer characeterization strategy; a few fixes to the simulations for Bill Cotton.

PennArrayReceiver? Cycle 4 2004 SDD Request

Finish & test JNI GPIB code.

Topic PennArrayReceiverCycleFour2004Summ . { Edit | Attach | Ref-By | Printable | Diffs | r1.1 | More }
Revision r1.1 - 07 May 2004 - 02:55 GMT - BrianMason Content copyright © 1999-2007 by the contributing authors.
All material on this collaboration platform is the property of the contributing authors.