PennArrayReceiver? Cycle Six 2004 Elec Request

Consultation (John Ford, Jeff Acree) mostly on packaging and RFI mitigation issues.

PennArrayReceiver? Cycle Six 2004 Mech Request

Continue design work for Penn Array mount, and finalize the RFI crate in consultation with the Penn guys.

PennArrayReceiver? Cycle Six 2004 Sci Request

Brian (15% - 40%) for project coordination and possibly attending a meeting at Goddard; also, possibly, an extended working visit to Penn (which keeps getting delayed, and is contingent on software and/or electronics and/or detector delivery from Goddard).

PennArrayReceiver? Cycle Six 2004 SDD Request

Melinda for possible attendance at a 1-2 day meeting at GSFC (currently discussed date is 23 + 24 Aug but this is not firm). This is a lower priority than Ka band however.

PennArrayReceiver? Cycle Six 2004 Misc Request

At the 30jul commissioning meeting (and based on an email Brian sent to the project planning committee some time ago) we tentatively decided that the Penn Array would go in the S-band hole. We need to make this decision final, the packaging work is proceeding.

Topic PennArrayReceiverCycleSix2004Summ . { Edit | Attach | Ref-By | Printable | Diffs | r1.1 | More }
Revision r1.1 - 30 Jul 2004 - 21:46 GMT - TWikiGuest Content copyright © 1999-2007 by the contributing authors.
All material on this collaboration platform is the property of the contributing authors.