Penn Array Receiver Electronics Division Request Cycle 2 2004

NONE

Penn Array Receiver Mechanical Division Request Cycle 2 2004

The optics tower job will be submitted to the shop in this period. This is a substantially smaller job than the Penn Array dewar , however will require some checking of the drawings first.

Penn Array Receiver Scientific Services Division Request Cycle 2 2004

Brian @ 15% (proj mgt), 15% (proj sci) for: coordination of Michael Lacasse's NASA/GSFC (IRC JNI) work, one or two trips to Penn and Goddard, and continued work with Bill Cotton on simulations and analysis software.

Penn Array Receiver Software Development Division Request Cycle 2 2004

Michael Lacasse at 50% (for the next 2 cycles) to write Java Native Interface (JNI) to GPIB and PCI drivers for NASA's IRC software.

NONE

NONE

NONE

Topic PennArrayReceiverCycleTwo2004Summ . { Edit | Attach | Ref-By | Printable | Diffs | r1.1 | More }
Revision r1.1 - 05 May 2004 - 22:44 GMT - TWikiGuest Content copyright © 1999-2007 by the contributing authors.
All material on this collaboration platform is the property of the contributing authors.