NRAO Home  >  Green Bank  |  Wiki Topic:    GB > Dynamic > DssSandbox
   Changes | Index | Search | Go

DSS Sandbox


Nell, version 0.5a:

Nell, version 0.5:

Nell, version 0.1:

To Do List

These are non-critical items having no deadlines. When and if any item is deemed otherwise it should go onto the WBS and/or a MR should be generated. Prority runs from 1 (high - as soon as we can) to 3 (low - sometime)

Item Effort Priority Status
Sessions with elevations < 5 medium 1 MHC
Sessions states and time accounting low 1 DONE
Phone numbers form needs to block blank entries low 3 DONE
Blackout Dates from needs to validate that start < end date low 3 DONE
No tool tip on second half of split session (schedule and overview page) low 3  
Errors in Project & Session validators & forms low 1 DONE
Problem w/ indenting Project, Allocation, Phone & Blackout edit forms low 3 DONE
Server generates all zero scores after running days (priority assumes there is a workaround) low 3  
Units as helptext in forms (or otherwise demarcated) low 2 DONE
Better handling of types from text fields low 3  
Limit the duration for a fixed session by the min and max duration (validator) low 3 DONE
Add used weather to session table low 4  
Allow a range of times for windowed allocations medium 2  
Deployment medium 1 MTM
Detect and report deadlock medium 1 DONE
Should 0 or minDuration be used check if allocation time has expired? low 4  
Overlapping sessions high 1 DONE
Weather station 2 for current wind speed medium 2 MHC
Interface to CLEO forecast from Weather class medium 1  
Use new "climate" file simulateFrequency_2004-2007.txt low 1  
Use label "ET" instead of "local" in UI low 1 DONE
Thesis status fails to stick in Project edit form low 1 DONE
antioch unit tests work from an installation instead of source tree medium 1 DONE
Upgrade to the newest version of TG and SA. high 1 DONE
Preferred format for RA/DEC is xx:xx:xx.xx (validator) medium 1 DONE
Release version is slow - cause sqlite? low 1 DONE
Save methods are not being validating add forms medium 1 DONE
No windowed allocations in scheduler bin low 1 DONE
Factors and Scheduling scores appear out of sync. low 1 DONE
Extra day in factors table low 1 DONE
Create News if time remaining is less than the minimum duration low 1 DONE
Get rid of hard coded paths in antioch low 1 DONE
Separate antioch installation per nell version low 1 DONE
Score changes from bin to schedule - use min duration? low 2 DONE
Times remaining on projects page are wrong low 1 DONE
Align scoring classes names with note 5.2's names low 1 DONE
Fill in blank cells in session probabilities low 2 DONE
Pack handles previously scheduled sessions high 1 DONE
Pack handles time between medium 1 DONE
Prioritize observers on project medium 1 DONE
Add online help low 3  
Only display time hours that are different low 2  
Use username instead of BOS Id low 1 DONE
Give better description for "add" link at top right of session page unknown 1 DONE
Add help information for RSS and icals unknown 1 DONE
Look into RSS and pine compatability low 1 DONE
Test and integrate new charleston weather databse high 4  
Add cloud cover fraction into automative weather info unknown 3  
Integrate probabilities computation and display low 1 MHC
fix bug with removing observer with more then one project low 1 DONE
display line breaks in text derived from text areas low 1 DONE
perform necessary actoins when disqualifying an allocation low 1  
handle dead links (ex: Session details list, after session has been removed); w/ proper feedback low 1  

Output needed from astronomers for summer tests

MarkClark - 23 Feb 2008

Topic DssSandbox . { Edit | Attach | Ref-By | Printable | Diffs | r1.39 | > | r1.38 | > | r1.37 | More }
Revision r1.39 - 06 May 2008 - 15:55 GMT - PaulMarganian
Parents: WebHome
Content copyright © 1999-2007 by the contributing authors.
All material on this collaboration platform is the property of the contributing authors.