2008 Summer 2008 Test Preparation List

To Do List

DONE = Done; REFACTOR = Being worked on; ALERT! = Not started; frown = On hold; N/A = Not Applicable

Item Priority Software Status Astronomy Status Comments
Weather History 1 REFACTOR DONE  
Current Weather 1 REFACTOR DONE  
Observer Contact/Schedule 2 DONE DONE Astronomer input at ObserverContact
Overview calendar 2 DONE N/A  
User's Handbook 1 N/A %Y Intro and tutorial complete
Complete database fields 1 DONE N/A  
Clean up (crud 2.0) 2 DONE N/A  
Statistical Analysis 1 DONE DONE  
Basic Security 3 DONE N/A Need by May 2
Complete Backlog 1 DONE N/A  
Update time from Carl's database 3 ALERT! N/A Needs to be done at the end of May
Reporting tool to feed information back into Carl's database at the end of the summer 3 ALERT! ALERT! Not to be started until after summer tests are underway
Ability to flexibly schedule hardware changes and have that reflected in the availability calendar 3 ALERT! N/A Not needed until Sept 1

Topic SummerTestSchedule . { Edit | Attach | Ref-By | Printable | Diffs | r1.10 | > | r1.9 | > | r1.8 | More }
Revision r1.10 - 12 May 2008 - 09:44 GMT - KarenONeil Content copyright © 1999-2007 by the contributing authors.
All material on this collaboration platform is the property of the contributing authors.