NRAO Home  >  Green Bank  |  Wiki Topic:    GB > Observing > AugustSeptember2007
   Changes | Index | Contents | Search | Go

GBT Astronomy for August/September 2007

Schedules

Astronomy for Track Work and Transition

Astronomy Track Re-Characterization Period

Proposals

PC Band(s) Description Contact
GBT07A-034 K ~7 x 8h @ 12 LST Jim Braatz (jbraatz@nrao.edu)
GBT07A-051 All * x 6h @ 17.5 LST Tony Remijan (tremijan@nrao.edu)
GBT07A-060 L 6 x 6.25h @ 17.75 LST Julia Deneva (deneva@astro.cornell.edu)
  L or 40 x 1.25h @ 17.75 LST in drift mode  
GBT07B-002 4S 5 days (see sched) Bruce Campbell (campbellb@si.edu)
GBT07B-010 S 1 x 10h @ 18.75 LST Dunc Lorimer (Duncan.Lorimer@mail.wvu.edu)
GBT07B-011 3 1 x 10h @ 21.50 LST (can be split if nec) Dunc Lorimer (Duncan.Lorimer@mail.wvu.edu)
GBT07B-012 3 All sky Survey Dunc Lorimer (Duncan.Lorimer@mail.wvu.edu)
GBT07B-023 K 9 x 8h @ 7.25 LST Jeff Wagg (jwagg@nrao.edu)
GBT07B-026 US 1 x 5h @ 19 LST Jeremy Darling (jdarling@origins.colorado.edu)
GBT07B-039 X 1 x 1h in the late afternoon Alan Rogers (arogers@haystack.mit.edu)

-- CarlBignell - 10 Aug 2007

Topic AugustSeptember2007 . { Edit | Attach | Ref-By | Printable | Diffs | r1.3 | > | r1.2 | > | r1.1 | More }
Revision r1.3 - 10 Aug 2007 - 17:44 GMT - CarlBignell
Parents: WebHome
Content copyright © 1999-2007 by the contributing authors.
All material on this collaboration platform is the property of the contributing authors.