Az Track, Antennae Report -- Bob


Observing News -- Ron

We supported 14 projects in 24 sessions, including a VLBI run. Average setup time was 13 minutes. The telescope was also scheduled for 42 hrs maintenance, 5 hrs PTCS tests, 1 hr program checkout, and 2 hrs calibration. Lost time was 2.6 hrs, about 2.2% of the time scheduled for tests and observing. Of the 14 operator shifts, only 4 had lost-time problems. Problems were:

In other news, we decided on our support schedule for September.


Scheduling Status -- Carl


Microwave Electronics Status -- Roger

Operations

No issues this week.

Development

Q-band Receiver: Q-Band receiver assembly continues. Except for the new mixer bias assemblies, the mechanical part of the IF rebuild is complete. A large part of the week has been set aside to investigate whether voltage transients have been destroying Q-Band amplifiers. Transients were found due to starting and stopping the refrigerator motor, and we are investigating ways of reducing or eliminating the voltage transients. We are preparing to measure the conversion loss of the mixers that have been installed in the Q-Band receiver.

Ka Receiver: The MMIC LO doublers and dual chip amplifiers were tested and found to have short circuits due to conductive epoxy squeezing into the DC feedthroughs. After cleaning and retesting we have three working doublers, one working amp and one amp missing a coax to microstrip tab but working. One amp lost a chip due to the epoxy shorts, both amps requiring further micro attention are being repaired Friday (18th). Work on the 300K stage continues but slowed due to my attention to the doublers and amplifiers. A good portion of the wiring harness from the previous assembly is usable, saving some time in the wiring process, which shall begin in earnest this (Thursday, 17th) afternoon. Gate leakage currents were checked on the cryogenic amps and they seem to be OK - no different than when constructed in 2004.

C-band: The new cryostat was assembled and successfully vacuum leak-checked. The cylinder and heat shields are being shipped to a contractor for electropolishing and nickle plating respectively. Copper dewar parts have been annealed and are ready for gold plating. The second set of low loss coaxial dewar lines were assembled and tested. Initial results look good. Addition testing will be done in the test dewar. Evaluation of components for the new post-dewar electronics design continues.

IF Improvements: All parts from the shop have been completed and construction started on the ORM power dividers and CF amplifier upgrades.

Penn Array: All necessary equipment has been gathered, cryogenic lines charged, and lab space made available for the Penn Array arrival this weekend.


Digital Electronics Status -- Randy

Digital Group Status 12-AUG-06 THRU 18-AUG-06

***Operations, Problem Summary***

No problems to report...

Active Surface...

No work was done on the Active Surface this week.

Miscellaneous...

***Development***

Caltech Continuum Backend (CCB)...

Construction of CCB #3 is still underway with a newly revised completion date of 01-SEP-06.

Spectrometer LTA Re-design...

Work continues on the LTA re-design project... A detailed project schedule should be ready by 01-SEP-06. Following this, an informal preliminary design review will be scheduled for sometime in the mid- to late-September time frame.

Lab Spectrometer...

ALMA (As reported by Jason Ray)...

***Plans***

Randy


Software Status -- Mark

Beginning of cycle and entire group returning from Software Conference in Soccoro.


Pulsar Related -- Scott


MIT/LL 43m Project -- Glen


Any other Business

-- RichardPrestage - 16 Aug 2006

Topic CommissioningMeeting06Aug18 . { Edit | Attach | Ref-By | Printable | Diffs | r1.7 | > | r1.6 | > | r1.5 | More }
Revision r1.7 - 18 Aug 2006 - 13:43 GMT - MarkClark
Parents: WebHome > CommissioningMeetings
Content copyright © 1999-2007 by the contributing authors.
All material on this collaboration platform is the property of the contributing authors.