GBT Operations & Commissioning Meeting

25 August 2006

AGENDA


Az Track, Antennae Report -- Bob


Observing News -- Toney

This week we had a very light observing load, supporting 8 projects in 14 sessions. Average setup time was 12 minutes. The telescope was also scheduled for 42 hrs maintenance, 26 hrs PTCS tests, 1.5 hr receiver checkout, and 10 hrs track tests. Despite the light observing load we had more lost time than normal. Lost time was 7.3 hrs, about 6.3% of the time scheduled for tests and observing. Of the 14 operator shifts, 6 had lost-time problems. Problems were:


Scheduling Status -- Carl


Microwave Electronics Status -- Roger

Operations

Other than fairly routine cryogenics maintenance, no problems this week.

Development

Q-band Receiver: All the system mixers were bench tested and found satisfactory for use. We now have in hand enough LNA's from CDL to complete assembly. However, the gain flatness of some of the new amps is not as good as expected, so gain equalization is being investigated. An IF amp designed for the Optical Driver modules is being evaluated for use in the receiver - it has potential advantages over the commercial amps used previously.

Ka Receiver: MMIC problems corrected, amps tests came out well. 300K assembly nearly complete, needing a few K connector and .141 coax assemblies. Card cage tests going well, no problems yet. Receiver should be assembled Friday the 25th to start cooling.

C-band: The new cryostat and heat shields are at Alexandria Metal Finishers. Component testing for the electronics redesign continues; some components have been ordered.

IF Improvements: The remaining buffered power divider assemblies are about 30% completed.

Penn Array: In the outdoor test building for cooldown and testing.


Digital Electronics Status -- Randy

Operations, Problem Summary

Development

Plans


Software Status -- Amy

This ends the first full week of 6 in the sixth development cycle of 2006 which can be viewed at PlanOfRecordC62006. We are scheduled to release on September 29.

We have been very busy with Penn Array support this week. Our testbed computer, spider, has been found to be much faster than Penn's machine. So spider is being prepared to go into the telescope in lieu of the Penn machine. To support this, we added a GPIB card and driver to run the housekeeping/cryo equipment. From a software point of view, things look good!

MelindaMello will be attending Virtual Observatory (VO) school in September.

Operational support was very light.

Modification Requests:


Pulsar Related -- Scott


MIT/LL 43m Project -- Glen

Normal spacecraft tracking this week. Request for quote received from MIT/LL. We are working on changes to the statement of work for 2007.


Commissioning Plans -- Toney

Commissioning Summary & Milestones: Sept 1 - Dec 31:


Any other Business

-- RichardPrestage - 16 Aug 2006

Topic CommissioningMeeting06Aug25 . { Edit | Attach | Ref-By | Printable | Diffs | r1.7 | > | r1.6 | > | r1.5 | More }
Revision r1.7 - 25 Aug 2006 - 12:40 GMT - RogerNorrod
Parents: WebHome > CommissioningMeetings
Content copyright © 1999-2007 by the contributing authors.
All material on this collaboration platform is the property of the contributing authors.