NRAO Home  >  Green Bank  |  Wiki Topic:    GB > Observing > CommissioningMeetings > CommissioningMeeting07Aug10
   Changes | Index | Contents | Search | Go

GBT Operations & Commissioning Meeting

10 August 2007

AGENDA


Upcoming Activities -- Carl

Activities List


Az Track, Antennae Report -- Bob

The final four welds caused the adjacent areas to bow upward as much as 0.050 inch. In addition, the surface very close to the weld drew down about 0.010 inch. These can be corrected by building up the low areas with weld, and machining down the high areas. Here's what the affect on the schedule looks like; we're still trying to optimize the work.

Weld build-up of the low areas: Today through Monday or Tuesday. Machining of these areas: Sunday through Tuesday or Wednesday (night work) Alignment of unaffected areas: Last night through Sunday night Forming for grouting: today through Monday Grouting: Sunday through Tuesday or Wednesday Cure: Wednesday or Thursday Move: After cure Machining of high areas: Start Wednesday or Thursday night, take 8 nights Grouting of remaining areas: As an octant is finished and aligned. Estimated finish and release for pointing: 8/26 or 8/27.

Now, the HIGH temperatures are affecting work. Plates are storing heat, which affects the alignment effort at night. The grout moves very slowly at warmer ambient and metal temperatures, too (it starts curing quicker). This may cause these activities to take longer.


Observing News -- Ron

We discovered a problem with the 1st stage amplifier in one chanel in PF1. After confering with the obsrevers, Carl, Gary, John, ..., we decided that we will remove the receiver on Monday and repair the amplifier. The receiver should be back on the telescope by Aug 22-24. We also lost ~5 hours when the observers could not restart their obsreving scripts. Governor's school observing went OK, but we're definitely out of practice observing with a 350 MHz, PF transit telescope.


Scheduling Status -- Carl

Last Week
=========

Observations for proposals
   GBT07B-012, GBT07B-035

Next Week
=========
Observations scheduled for **
  GBT07B-012 [F  ] Dunc Lorimer
       Pulsar searching in the classroom using the GBT   
** Scheduled as F-ixed, P-rimary, B-ackup

Contact Information for 08/23/2007 - 09/06/2007
=======================================
Proposal   PI                 Bands Email [NRAO contact]    
---------- ------------------ ----- --------------------

Scheduled hours [backup]
========================
Category/Month-> August    September 
    Astronomy ~  330 [026] 314 [376] 
  Maintenance ~  195        21 [068] 
  Test & Comm ~  219 [005] 322 [030] 
  Un-assigned ~    0        93       

Proposal Checkouts #[hrs]*
=========================
Awaiting checkout - 0[0]
  Active checkout - 0[0]
          On Hold - 0[0]
         Schedule - 76[3221]
        Completed - 491[6289]
* All but completed queue applies to GBT only proposals


Current backlog of Reg & RRS proposals [hours prior to 07B*] = 1170
   [2005:369(14), 2006:358(18), 2007:444(21)]
   Backlog includes 59 hrs of monitoring projects
                    182 hrs of vlbi projects
Total time to discharge [hours] = 6336
   Includes 274 hours++ of monitoring (not Large or Spec) after trimester 07B
            2787 hours of Regular & RRS proposals 
            3317 hours of Large proposals 
            50 hours of Track Refurbishment proposals 
            182 hours of VLBI proposals 
* Includes projects that are on hold for trimester 07B
++ Time is counted in other break down as well. 07B


Microwave Electronics Status -- Steve

Operations

Development


Digital Electronics Status -- Randy

Operations, Problem Summary

Development

Plans

Complete charter for new pulsar backend development

Continue planning process for new pulsar backend


Servo Systems Status -- John and Bob

Tested subreflector this week, which revealed software problems. At the macro level, the actuators seemed to follow the commands properly, but the test needs to be repeated after the software problems are fixed.

PLC Interlock chassis lab testing was completed this week. Next week, it will be installed in the servo interface cabinet and readied for testing. We will need to coordinate between this testing and need for motion of the telescope during the day. At night, the system will be put back to original configuration.

Operations, Problem Summary

There have been intermittent alarms occurring on the 43meter Citect display which are in error. We are troubleshooting the Citect system to isolate where it is coming from. The system is otherwise functioning properly.

Development

The debug of the Servo PLC upgrade, in the lab, is just about complete. The system will be installed on the GBT next week. Static testing will begin mid to end of next week.


Software Status -- Amy

We are in the final full week of the fifth development cycle of 2007 which can be viewed at PlanOfRecordC52007. We are scheduled to release on August 15. We conducted two integration tests this week on August 7 and 9. The reports are available - August 7, August 9. Release notes are in development.

Operational & User Support

Operational and user support was very light over the last couple of weeks and included:

Modification Requests/Tasks


Computing -- Chris

Parts for the GBT network upgrade are arriving. Looks good for completion by the end of August.

Some issues exist with the Jansky lab <-> Tour Center link and are being investigated.


PTCS -- PTCS Team


Pulsar Related -- Scott


MIT/LL 43m Project -- Glen


Commissioning Plans -- Ron

I've modified the commissioning plans to reflect the shift in the end of the track shutdown. Most activities have not been affected. Note that the next milestones are the installation/cooling of Q-band (now with a due date of Aug 31).

On Monday, we will restart our 1 PM commissioning meetings in the conference room. All those involved with any of the activities listed below are invited. I'll send out an agenda either late today or tomorrow.


Any other Business

Topic CommissioningMeeting07Aug10 . { Edit | Attach | Ref-By | Printable | Diffs | r1.13 | > | r1.12 | > | r1.11 | More }
Revision r1.13 - 13 Aug 2007 - 04:56 GMT - RonMaddalena
Parents: WebHome > CommissioningMeetings
Content copyright © 1999-2007 by the contributing authors.
All material on this collaboration platform is the property of the contributing authors.