NRAO Home  >  Green Bank  |  Wiki Topic:    GB > Observing > GbtEquipmentPlans
   Changes | Index | Contents | Search | Go

GBT Equipment Status

Gregorian Receivers
Receiver Status Remove InstallDescription
L (1.15 - 1.73 GHz) I      
S (1.73 - 2.60 GHz) I      
C (3.95 - 5.85 GHz) I (03/21/05)   Remove for Penn Bol 
X (8.00 - 10.1 GHz) I      
Ku (12.0 - 15.4 GHz) I      
Ka (26.5 - 40.0 GHz) I (06/01/05?)   Astronomy - 03/15/05-05/31/05 
Q (40.0 - 50.0 GHz) I      
Penn Bolometer (80.0 - 110.0 GHz) D   (04/01/05) Engineering tests

Prime Focus Receivers
Receiver + Feed Status Remove InstallDescription
PF1 3(0.29-0.395 GHz)- 340 MHz S      
PF1 4(0.385-0.520 GHz)- 450 MHz S     Feed Only
PF1 6(0.51-0.69 GHz)- 600 MHz S    
PF1 8(0.68-0.92 GHz)- 800 MHz I     Feed only 
PF2 (0.91-1.23 GHz) S ~ (01/17/05)  

The status codes for the hardware include:
  • I - installed and operational
  • R - installed but in repair state and not available
  • RL - in repair/upgrade state in the lab
  • D - in development
  • S - in storage.
Dates enclosed in round braces () are tentative dates only.
Last Updated on November 9, 2004.

-- CarlBignell - 31 Mar 2004

Topic GbtEquipmentPlans . { Edit | Attach | Ref-By | Printable | Diffs | r1.13 | > | r1.12 | > | r1.11 | More }
Revision r1.13 - 28 Dec 2004 - 18:40 GMT - CarlBignell
Parents: WebHome
Content copyright © 1999-2007 by the contributing authors.
All material on this collaboration platform is the property of the contributing authors.