NRAO Home  >  Green Bank  |  Wiki Topic:    GB > Operate > BlankPage
   Changes | Index | Contents | Search | Go

TELESCOPE OPERATIONS


Power Disconnect for D-17

General

D-17 breaker controls all the electronic equipment in the receiver room. This large grey box is located in the receiver room on the wall left of the door marked D-17. Inside this larg grey box are 11 breakers and several spares.

Info

STEP ACTION
1 Open the door for D-17 and
2  

-- DavidRose - 15 Nov 2004

Topic BlankPage . { Edit | Attach | Ref-By | Printable | Diffs | r1.6 | > | r1.5 | > | r1.4 | More }
Revision r1.6 - 13 Apr 2006 - 15:20 GMT - KevinGum
Parents: WebHome
Content copyright © 1999-2007 by the contributing authors.
All material on this collaboration platform is the property of the contributing authors.