MAINTENANCE DAYS

Warning

Ensure personnel safety through effective communications and the two man rule. Notify people of telescope movements, before they're made! Fall protection is required at several PMU/PCT connection locations.

General

This procedure concerns support for routine maintenance day activities.

Maintenance Days

Per the schedule on routine maintenance days, operations from the Jansky Lab control room will be suspended. The dayshift operator will then proceed to the GBT site where they will work out of the warehouse to monitor and coordinate telescope activities until normal operations resume. Procedures to support these actions follow.

Info

The character ^ is used below to emphasize spaces between dialog elements.

Suspending Operations at the Jansky Lab Control Room

STEP ACTION
1 Terminate observing routines per schedule.
2 Move the telescope to Access position (EL: 77.850 deg.) and AZ: 44.15 deg. unless requested otherwise. Insert stow pin. Disable AZ/EL drives.
3 Stow the sub reflector and retract prime focus boom if required. Disable these servo systems.
4 Release M&C antenna control.
5 Revoke antenna control via the Cleo Gateway application as needed to restrict access (see Cleo Gateway Management procedure).
6 Lockout antenna and take the antenna control lockout key.
7 Advise site via e-mail of the GBT Status.
8 Set the Scan Coordinator project ID to: JMAINT (It may be changed later if a particular project ID is needed for testing)
9 Reboot the control room Linux workstations as necessary: victor, naiad, titania, and arial. Use the commands who and ps ^ -ef ^ ^ more to see if anyone is logged in and what processes are running. The reboot may be delayed until the close of the maintenance period if necessary, or to a following maintenance day if circumstances warrant it.
10 Proceed to the GBT site with: Gate/warehouse and vehicle keys; Any items in the operator's in basket marked for the warehouse or servo room; Personal safety devices (hard hat, fall protection, safety glasses, etc. as needed).

GBT Site and Warehouse Office Duties

STEP ACTION
1 Upon arrival, proceed to the servo room to lock out the AZ/EL servo system.
2 Attend to warehouse office duties:

STEP ACTION
3 Should an AZ/EL move be required:

STEP ACTION
4 Should a turret, sub reflector, or prime focus move be required:

Resuming Operations at the Jansky Lab Control Room

STEP ACTION
1 At the servo room/GBT: After mechanics walk-through inspection, complete the elevation tipping and azimuth rolling inspection. Pass antenna control to the OCT prior to leaving servo room. Remove the antenna control lockout key to take to lab control room.
2 Close down operations from the warehouse office: Log out and turn off the office workstations. Turn off appliances/radios. Turn off all lights. Gather any items to return to the control room.
3 Upon return to the control room: Return gate/warehouse and vehicle keys. Store personal safety devices. Update Ops log as necessary.
4 Restore antenna control via M&C. Make changes to Cleo Gateway access as needed.
5 Prepare for and resume normal operations.

-- DavidRose - 6 Feb 2008

Topic MaintenanceDays . { Edit | Attach | Ref-By | Printable | Diffs | r1.10 | > | r1.9 | > | r1.8 | More }
Revision r1.10 - 06 Feb 2008 - 19:34 GMT - DavidRose
Parents: WebHome > TelescopeOperations
Content copyright © 1999-2007 by the contributing authors.
All material on this collaboration platform is the property of the contributing authors.