NRAO Home  >  Green Bank  |  Wiki Topic:    GB > Operate > TelescopeOperations > ObservingWithFeedArmSCUPowerOff
   Changes | Index | Contents | Search | Go

TELESCOPE OPERATIONS


OBSERVING WITH FEED ARM SCU POWER OFF

General

The following procedures are designed to support prime focus observing or testing that requires turning off power to feed arm servo systems (SCU).

Info

If this type of observing is to be done for an extended period (many hours), SCU power should be turned off in the receiver room (D15 Service box, main breaker) instead of on the allidade at the D14 breaker.

M&C Preparations

STEP ACTION
1 Stow Sub Reflector unless already stowed.
2 Set up Antenna Control screens for Prime Focus observing: Optics Mode = Prime Focus Optics; Subreflector Mode = Prime; Pointing Coefficients = Prime Focus with focus tracking OFF; Pointing Models = Focus Tracking OFF.
3 Using M&C or the OCU/OCT, set the prime focus axis as follows: Prime Focus Y axis = 1030mm (40.55 in.); Prime Focus X axis = 560mm (22.05in.)
4 Extend Prime Focus boom (can be done later if necessary, but must be done prior to shutting power off).
5 With M&C in control of the antenna, go to the Antenna Control Drives tab and set the SCU Control State to disabled.
6 Proceed to Powering Off SCU Servos when ready.

Powering Off SCU Servos

STEP ACTION
1 Confirm the prime focus axis are set.
2 Turn OFF the D14 breaker in the D1A service box, Allidade power cabinets.
3 The antenna is now set for prime focus observing with SCU power off.

Potential Problems / Solutions

Two problems can occur inhibiting antenna operation with SCU power off:

PROBLEM SOLUTION
Problem 1 Turn ON D14 breaker. Clear the M&C faults. With M&C in control of the antenna, go to the Antenna Control Drive tab and set the SCU Control State to disabled. Turn OFF D14 breaker.
Problem 2 On the Antenna Control Screen, Prime Focus Ctrl tab, replace any zeroed values with legal ones. Any legal values will work and will not affect observing. Upon pressing Move to, the faults should clear.

Restoring SCU Power for Normal Operations

STEP ACTION
1 Turn ON D14 breaker in the D1A service box, Allidade power cabinets.
2 Setup M&C antenna control screens for normal (feed arm power on) observing as necessary.

-- DavidRose - 6 Feb 2008

Topic ObservingWithFeedArmSCUPowerOff . { Edit | Attach | Ref-By | Printable | Diffs | r1.5 | > | r1.4 | > | r1.3 | More }
Revision r1.5 - 06 Feb 2008 - 16:49 GMT - DavidRose
Parents: WebHome > TelescopeOperations
Content copyright © 1999-2007 by the contributing authors.
All material on this collaboration platform is the property of the contributing authors.