Mustang Software Support Meeting 14-Apr-08

Attendees:

Agenda (standing):

Meeting Notes:

Priority of work (priority unchanged):

  1. Detector Bias curves – Preliminary tests on MUSTANG before removal from telescope were successful but MUSTANG was not fully cooled; Final tests will be conducted when MUSTANG is cold and available at UPenn.
  2. YGOR/Spider installation – Ray to contact Simon to sort out details of logging on to Spider in UPenn and install YGOR.
  3. Addition of low-level messages for errors –Development complete and code checked in. Final tests will be conducted on ‘Green’.
  4. Data monitoring – Ready to code.
  5. Two changes are planned for ‘Bias File’ (which saves tuning information):

Known staff unavailability:

SddCalendar

*******************************

Martin,

Mark and I have discussed the creation of a cryogenics simulator to aid in the development of the housekeeping software. Such a simulator would be a state machine that would receive commands through the M&C GPIB interface (simulated at a lower level than the manager) and would then set itself to the proper state. There are a few good reasons to implement this:

* It would serve as an excellent vehicle to understanding the operating principles of the Mustang cryogenics system.

* It would expose any deficiencies in the documentation on the cryogenics system

* It would speed up the development of the actual housekeeping software, by limiting the need for spider

* It would facilitate troubleshooting problems with the housekeeping software in the future.

What we need is time allocated to do this. I believe that the time we are talking about is in the range of 40-80 hours to actually develop the simulator. (This does not include time spent understanding the cryogenics system, since that time would have to be spent anyway before any design or implementation of housekeeping system could take place.) The time actually spent on the simulator will hopefully return many dividends during the development and testing of the housekeeping software.

Ray

************************

-- MartyBloss - 15 Apr 2008

Topic MeetingNotes14Apr08 . { Edit | Attach | Ref-By | Printable | Diffs | r1.2 | > | r1.1 | More }
Revision r1.2 - 15 Apr 2008 - 14:59 GMT - BrianMason
Parents: WebHome > MustangProjectPlan > WeeklyMeetingNotes
Content copyright © 1999-2007 by the contributing authors.
All material on this collaboration platform is the property of the contributing authors.