Software Continuing Maintenance & Enhancement (CM&E)


1. Scope

This project encompasses all discretionary software-only project work designed to improve the performance or operation of the GBT, which is not covered by any other project. Software CME subprojects are classified as small (less than one cycle of effort), medium (1-2 cycles) or large (2+ cycles).

2. Strategic Value

This project seeks to further develop existing telescope capabilities and/or observing modes. CME projects may be instantiated to satisfy operational support issues which are chronic or have wide impact.

3. Personnel

4. Work Packages

5. Short Term Goals (Q1-Q2 2005)

6. Longer Term Goals

Strategic:

  1. Eliminate backlog of maintenance & enhancement work (described at ChangeControlCommittee page)
  2. Reduce the frequency of critical failures requiring callout and/or operational support to as near zero as feasible
  3. Reduce MTBF/MTTRs for each of M&C's primary components (e.g. Spectrometer) - first, current values must be assessed

7. Resource Requests for Cycle 5 2005 (Feb 14 - Mar 31 2005)

8. Accomplishments

  1. done C8 2004 Make sure all of M&C primary systems have simulators, to reduce our wintertime telescope time needs
  2. done C8 2003 Reduce daily builds to 0 Errors/0 Warnings

Go to SoftwareCMEOldRequests to see previous requests...

Topic SoftwareCME . { Edit | Attach | Ref-By | Printable | Diffs | r1.9 | > | r1.8 | > | r1.7 | More }
Revision r1.9 - 08 Feb 2005 - 19:51 GMT - NicoleRadziwill
Parents: WebHome
Content copyright © 1999-2007 by the contributing authors.
All material on this collaboration platform is the property of the contributing authors.