Add Motor Rack Control Functions

Modification Request #1 (C1 2006)



1. Introduction

We are adding features (digital control functions) to the Motor Rack. These will allow remote control of refrigerator drives, a vacuum pump, and a vacuum valve.

2. Background

Motor Rack M&C specification document is attached. This document defines the control addresses and bits to be added.

Refrigerator Control

There are five Refrigerator Power Supply chassis (1-5) in the Motor Rack. Each one has five drive output ports (S1-S5) which are controlled independently. Therefore five control bits are required for each chassis, 25 in total. Setting a control bit to 1 turns the associated refrigerator motor drive OFF. Because of a shortage of control bits in the Motor Rack MCB interface, the 25 bits are scattered over five control addresses. Changing one bit must not affect others sharing the same address.

These controls will normally be used only by engineers and operators, so the primary interface will be via a Cleo screen or Device Explorer (for monitoring) and a configuration file. Basically we want it so that an engineer, technician, or operator can easily turn a specific drive port OFF or ON. Yet, we should try to minimize the chance of accidental changes by making control accessible only by editing the configuration file. The Cleo screen will be used only for monitoring the values.

Vacuum Control

Two control bits have been added for Vacuum Pump control and for Vacuum Valve control. The same comments about control via configuration file and monitoring via Cleo apply.

State Memory

It is quite important that the system not turn off refrigerators that should be running. (It takes about 2 days to recover if a cryo system warms up. If heaven forbid all the refrigerators warm up it could take a couple of weeks to fully recover.) It is also potentially damaging to equipment if a refrigerator runs for a long period when it is supposed to be off, or if a vacuum valve opens that is supposed to be closed. So, the system must be as robust as possible. The hardware power-up state is designed to put the control bits in a safe mode until the M&C system resets values. Because of these considerations, we request the following:

3. Design

The Motor rack coordinator has five refrigerator managers and a feed defroster manager. This MR will add a vacuum control manager, and augment the existing refrigerator managers. The feedback paramter names and mapping to managers is shown in the table below:

Description SIB Address Bit Manager Feedback Parameter Name Parameter Type
Pump On/Off Control 4A 5 VacuumControl vac_pump_control enum On,Off
Valve On/Off Control 4A 6 VacuumControl vac_valve_control enum Closed,Open
Refr Supply1, Drive S1 48 0 RefrigeratorPowerSupply1 refr_supply_drive_S1 enum On,Off
Refr Supply1, Drive S2 48 1 RefrigeratorPowerSupply1 refr_supply_drive_S2 enum On,Off
Refr Supply1, Drive S3 48 2 RefrigeratorPowerSupply1 refr_supply_drive_S3 enum On,Off
Refr Supply1, Drive S4 48 3 RefrigeratorPowerSupply1 refr_supply_drive_S4 enum On,Off
Refr Supply1, Drive S5 4C 0 RefrigeratorPowerSupply1 refr_supply_drive_S5 enum On,Off
Refr Supply2, Drive S1 4C 1 RefrigeratorPowerSupply2 refr_supply_drive_S1 enum On,Off
Refr Supply2, Drive S2 4C 2 RefrigeratorPowerSupply2 refr_supply_drive_S2 enum On,Off
Refr Supply2, Drive S3 4C 3 RefrigeratorPowerSupply2 refr_supply_drive_S3 enum On,Off
Refr Supply2, Drive S4 4D 0 RefrigeratorPowerSupply2 refr_supply_drive_S4 enum On,Off
Refr Supply2, Drive S5 4D 1 RefrigeratorPowerSupply2 refr_supply_drive_S5 enum On,Off
Refr Supply3, Drive S1 4D 2 RefrigeratorPowerSupply3 refr_supply_drive_S1 enum On,Off
Refr Supply3, Drive S2 4D 3 RefrigeratorPowerSupply3 refr_supply_drive_S2 enum On,Off
Refr Supply3, Drive S3 4D 4 RefrigeratorPowerSupply3 refr_supply_drive_S3 enum On,Off
Refr Supply3, Drive S4 4D 5 RefrigeratorPowerSupply3 refr_supply_drive_S4 enum On,Off
Refr Supply3, Drive S5 4D 6 RefrigeratorPowerSupply3 refr_supply_drive_S5 enum On,Off
Refr Supply4, Drive S1 4D 7 RefrigeratorPowerSupply4 refr_supply_drive_S1 enum On,Off
Refr Supply4, Drive S2 4E 0 RefrigeratorPowerSupply4 refr_supply_drive_S2 enum On,Off
Refr Supply4, Drive S3 4E 1 RefrigeratorPowerSupply4 refr_supply_drive_S3 enum On,Off
Refr Supply4, Drive S4 4E 2 RefrigeratorPowerSupply4 refr_supply_drive_S4 enum On,Off
Refr Supply4, Drive S5 4E 3 RefrigeratorPowerSupply4 refr_supply_drive_S5 enum On,Off
Refr Supply5, Drive S1 4E 4 RefrigeratorPowerSupply5 refr_supply_drive_S1 enum On,Off
Refr Supply5, Drive S2 4E 5 RefrigeratorPowerSupply5 refr_supply_drive_S2 enum On,Off
Refr Supply5, Drive S3 4E 6 RefrigeratorPowerSupply5 refr_supply_drive_S3 enum On,Off
Refr Supply5, Drive S4 4E 7 RefrigeratorPowerSupply5 refr_supply_drive_S4 enum On,Off
Refr Supply5, Drive S5 4A 7 RefrigeratorPowerSupply5 refr_supply_drive_S5 enum On,Off

4. Deployment Checklist

5. Test Plan


Signatures

APPROVED: I acknowledge that my request is fully contained in this MR, and if the SDD delivers exactly what I specified, I will be happy.

ACCEPTED: I acknowledge that I have validated the completed code according to the acceptance tests, and I am happy with the results.

Written DONE - JoeBrandt, RogerNorrod - 08Dec2005
Checked DONE - MarkClark - 08 Mar 2006
Approved by Sponsor DONE - RogerNorrod - 21Mar06
Approved by CCC DONE - JohnFord - 10Apr06
Accepted/Delivered by Sponsor DONE - RogerNorrod - 07Apr06

Symbols:


CCC Discussion Area

-- NicoleRadziwill - 06 Dec 2005

Attachment: sort Action: Size: Date: Who: Comment:
35207d001.pdf action 15468 07 Dec 2005 - 19:41 RogerNorrod M&C Specification Document

Topic ModificationRequest1C106 . { Edit | Attach | Ref-By | Printable | Diffs | r1.16 | > | r1.15 | > | r1.14 | More }
Revision r1.16 - 10 Apr 2006 - 13:03 GMT - JohnFord Content copyright © 1999-2007 by the contributing authors.
All material on this collaboration platform is the property of the contributing authors.