Modification Request 1C507



1. Introduction

Zpectrometer observations require changes in the Ka Receiver which amount to removal of components from the physical receiver and their associated control and monitoring functions in the software manager.

2. Background

The existing manager will function for in-house and familiar users but will generate error messages and hence confusion for unfamiliar users.

3. Requirements

General

Components for radiometer 2 will be disabled or removed from the receiver.

Specific

Parameters to disable:

s2BiasSwitch, d2BiasSwitch
See 'Problems Noted' below, d2LEDswitch
s2CryoAmp, d2CryoAmp
s2PhaseSwitch, d2PhaseSwitch
sigRefs2PhaseSwitch, sigRefd2PhaseSwitch
diff2_bypassHybrid, sum2_bypassHybrid
diff2_toZpectrometer, sum2_toZpectrometer

Samplers to disable:

cryoAmpBiasSampler: all d2, all s2
phaseSwCurrentSampler: all
phaseModulatorSampler: d2phaseSwitch, s2phaseSwitch,

Problems Noted

LED samplers and switch parameters for s1 and s2 seem to be exchanged, it is unknown if this is in hardware or in the manager.

4. Design

What is your plan? How are you going to fulfill the requirements?

Cleo

Since the manager may be reverted to its old configuration, CLEO will use the existence or absence of parameter fields to determine whether it is the old of new receiver design that is in use. CLEO will then configure its look according to the state of the manager. Work involved includes:

Approximately 1.5 days of work.

5. Add Any More Sections That Are Appropriate

6. Deployment Checklist

What has to get done to integrate this completely into the system. This checklist must be completed before Cycle Integration Testing begins.

7. Test Plan

Cleo

Testing will consist of setting by hand the above-mentioned flag to determine whether the application configures itself appropriately.

Critical!! ChangeControlCommittee will be reviewing these.

Don't forget to include/acquire any additional GBT test time needed outside integration/regression testing! Get your requests in early!

Important! If possible, you should conduct as many of your tests as possible in offline modes and/or with a simulator. We should constantly endeavor to minimize our use of telescope time for testing!

7.1 Internal Testing

This section covers things like unit testing, simulator testing, and any other tests required to make sure this MR is ready for sponsor/integration/regression testing.

7.2 Sponsor Testing

Lab (or on-telescope) testing of modified receiver manager will be performed, verifying all monitoring and control functions.

7.3 Integration/Regression Tests

What do the integration/regression testers need to do in order to test this MR.


Signatures

APPROVED: I acknowledge that my request is fully contained in this MR, and if the SDD delivers exactly what I specified, I will be happy.

ACCEPTED: I acknowledge that I have validated the completed code according to the acceptance tests, and I am happy with the results.

Written symbol - name - date
Checked symbol - name - date
Approved by Sponsor symbol - name - date
Approved by CCC symbol - name - date
Accepted/Delivered by Sponsor symbol - name - date

Symbols:


CCC Discussion Area

-- GalenWatts - 12 Jul 2007

Topic ModificationRequest1C507 . { Edit | Attach | Ref-By | Printable | Diffs | r1.3 | > | r1.2 | > | r1.1 | More }
Revision r1.3 - 04 Sep 2007 - 15:51 GMT - RonMaddalena
Parents: PlanOfRecordC52007
Content copyright © 1999-2007 by the contributing authors.
All material on this collaboration platform is the property of the contributing authors.