Modification Request 7C507



1. Introduction

Zpectrometer observations require changes in the Ka Receiver which amount to removal of components from the physical receiver, changing the number of IF paths from the receiver and thus requiring changes in how the signal paths from the receiver are configured.

2. Background

3. Requirements

What are the implementation-independent requirements for this MR?

4. Design

What is your plan? How are you going to fulfill the requirements?

5. Add Any More Sections That Are Appropriate

6. Deployment Checklist

What has to get done to integrate this completely into the system. This checklist must be completed before Cycle Integration Testing begins.

7. Test Plan

Critical!! ChangeControlCommittee will be reviewing these. Please send a link to this MR to RonMaddalena along with a suggestion for two reviewers when it is ready for CCC review.

Don't forget to include/acquire any additional GBT test time needed outside integration/regression testing! Get your requests in early!

Important! If possible, you should conduct as many of your tests as possible in offline modes and/or with a simulator. We should constantly endeavor to minimize our use of telescope time for testing!

7.1 Internal Testing

This section covers things like unit testing, simulator testing, and any other tests required to make sure this MR is ready for sponsor/integration/regression testing.

7.2 Sponsor Testing

This section is for the sponsor. What do you need to do in order to ensure that the MR is complete and correct? These tests are the prerequisite for sign off for the "accepted/delivered by sponsor" item in the "signatures" section.

7.3 Integration/Regression Tests

What do the integration/regression testers need to do in order to test this MR.


Signatures

APPROVED: I acknowledge that my request is fully contained in this MR, and if the SDD delivers exactly what I specified, I will be happy.

ACCEPTED: I acknowledge that I have validated the completed code according to the acceptance tests, and I am happy with the results.

Written symbol - name - date
Checked symbol - name - date
Approved by Sponsor symbol - name - date
Approved by CCC symbol - name - date
Accepted/Delivered by Sponsor symbol - name - date

Symbols:

-- GalenWatts - 19 Jul 2007

Topic ModificationRequest7C507 . { Edit | Attach | Ref-By | Printable | Diffs | r1.1 | More }
Revision r1.1 - 19 Jul 2007 - 12:02 GMT - GalenWatts
Parents: WebHome > KaBandReceiver
Content copyright © 1999-2007 by the contributing authors.
All material on this collaboration platform is the property of the contributing authors.