Software Plan of Record

Cycle 1 2006 (January 1 - February 15, 2006)


Releases this Cycle:

Weeks

  • Week 1 1/2 - 1/6 (Monday Holiday)
  • Week 2 1/9 - 1/13
  • Week 3 1/16 - 1/20 (Monday Holiday)
  • Week 4 1/23 - 1/27
  • Week 5 1/30 - 2/3
  • Week 6 2/6 - 2/15 (spans 1.5 weeks)

Who's in the Box?
  • Science - 100% Bob (Except for AAS)
  • Astrid Support - 50% Mark
  • CCB Commissioning Support - 50% Mark
  • Config/LO - 16% Melinda (1 wk)
  • Penn Array - 50% Melinda (3 wks)
  • Gbtstatus - 34% Melinda (2 wks)
  • Data - 50% Paul
  • GFM - 100% Amy, 50% Paul
  • Infrastructure, Integration Tests - Joe and Ray 100%

Key for the "Status" column:

  • DONE (%Y%) means the task has been successfully completed
  • MOVED TO... (%M%) means the task has been completed and is awaiting integration tests
  • PICK (%S%) means the task has been completed and is awaiting sponsor tests
  • ALERT! (%X%) means the task will not be completed this cycle, but was expected to be completed
  • ok means that the task is not yet complete or ready for tests, but NMR has evaluted results & progress is clearly on track

1. Operational/Scientific Support Items Completed During C1 2006


2. Commitments

The default/unsorted state reflects priority order for this cycle.

Task Info/MR Lead Sponsor,Team Notes Status
GBTIDLv2.0 w/Flagging on ~TBD N/A BobGarwood NicoleRadziwill, JimBraatz See IDLPlanUpdate.
Release planned for end of Feb.
 
GBTIDLv2.0 User Documentation N/A JimBraatz BobGarwood, NicoleRadziwill See IDLPlanUpdate.
Release planned for end of Feb.
 
GFM (CCB & quality checks) ModificationRequest12C705, ModificationRequest16C705 AmyShelton BrianMason, NicoleRadziwill MR12 is being written. MR16 is under development in ashelton's sandbox. ALERT!
Physical Infrastructure Upgrades PhysicalInfrastructureC82005, SystemPortTo26, RHE4 System Problems RamonCreager, JoeBrandt Computing Division We have begun testing of the gcc3/RHE4 based release, with llama-sparrow (picture that). See report central for details.
Simulator should be ready for testing.
 
LO1 Tolerance in Configuration ModificationRequest3C805 MelindaMello KarenONeil   DONE
Stop & Abort for Pulsar Observations ModificationRequest2C106 MarkClark ScottRansom, AmyShelton Draft MR completed, investigating solutions. No progress, have been working on new release (OS and gcc) and Astrid bug (missed states). ALERT!
CCB/Ka Commissioning Support CcbSoftwareCleanup MarkClark BrianMason, MelindaMello Remaining work: two requirements and three bugs. No progress, have been working on new release (OS and gcc) and Astrid bug (missed states). ALERT!
Spectral Line Capabilities in GFM for Engineers ModificationRequest1C705 PaulMarganian NicoleRadziwill Engineering: 80% of functionality coded. Prototype undergoing sponsor testing. No new work done this week. This item should get finished this cycle. Spectral Line for Astronomers:
All critical requirments meet. Online problems need to be addressed in today's int tests.
 
Penn Array FITS Header Keywords ModificationRequest2C505 MelindaMello BrianMason, JoeBrandt A DONE
Gbtstatus: Complete Additions ModificationRequest1C805 MelindaMello KarenONeil DONE -with the following caveats: the 4 least important items on the list were not complete. Backend frequencies for KA configs are not correct (late evaluation/agreement of requirements), multibackend if paths only display paths for last backend routed. Karen needs to retest Commanded coordinate item DONE
Finish Auto* Changes ModificationRequest14C705 MarkClark KarenONeil, AmyShelton   DONE


3. Refactored Code

Description Tests Submitter Notes Status
Astrid Stop & Abort Abort works in Observation State " SB Executing" and Stop works in Ygor State "Running" MarkClark Missing or late LPCs generates pop-ups, should be documented in the release notes. DONE
TaskMaster Changed to properly indicate when a runonce process has failed. Fixed a solaris bug. JoeBrandt Now displays "Failure" when process dies DONE
Antenna Manager Moved weather host information into system.conf JoeBrandt   DONE
showDeviceInfo Added -q option for quering a manager. JoeBrandt Debugging tool and upgrade to the cleo launcher as a 'lightweight' alternative to using a 'heavyweight' panel connection. No special tests necessary. DONE

4. Background Tasks

Project TASK MR Team Notes Status
SoftwareCME Correct boom deploy/retract under M&C control BoomDeployRetractProblem? JasonRay, JoeBrandt, MelindaMello Code works, but SCU rejects reset command. Needs investigation with electronics support.  
Add Motor Rack Control Functions ModificationRequest1C106 MarkClark RogerNorrod, AmyShelton    

5. Miscellaneous

-- NicoleRadziwill - 04 Jan 2006

Topic PlanOfRecordC12006 . { Edit | Attach | Ref-By | Printable | Diffs | r1.38 | > | r1.37 | > | r1.36 | More }
Revision r1.38 - 12 Feb 2006 - 15:24 GMT - JoeBrandt Content copyright © 1999-2007 by the contributing authors.
All material on this collaboration platform is the property of the contributing authors.