| Project | TASK | MR | Sponsor | Lead | Checker | Notes | Status |
| DataHandlingImprovements | Work towards 5/30/2005 release as per project plan | N/A | RonMaddalena | BobGarwood | JimBraatz | | |
| DataHandlingImprovements | Work towards IDL deployment issues as specified in project plan | N/A | NicoleRadziwill | PaulMarganian | NicoleRadziwill | See Status | |
| DataHandlingImprovements | Resolve sdfits known issues as per project plan | ModificationRequest6C205 | RonMaddalena | PaulMarganian | NicoleRadziwill | 11 of 13 issues coded and tested. SP issues not supported. See status | |
| DataHandlingImprovements | Add SDFITS epoch keyword | N/A | KarenONeil | PaulMarganian | MelindaMello | Tested by Tim Robishaw | |
| DataHandlingImprovements | CLASS update for Gary Fuller | N/A | JimBraatz | PaulMarganian | JimBraatz | done | |
| PennArrayReceiver | Penn Array software project charter | N/A | BrianMason | MelindaMello | NicoleRadziwill | Complete | |
| PennArrayReceiver | Complete MR for M&C/IRC interfaces | ModificationRequest5C105, ModificationRequest8C105 | BrianMason | MelindaMello | NicoleRadziwill | Complete | |
| PennArrayReceiver | Write MR for Pennarray FITS skeleton | ModificationRequest1C205? | BrianMason | MelindaMello | NicoleRadziwill | I am still investigating the IRC mechanisms that will enable me to specify the task. I don't want to write the MR incorrectly and commit myself to the wrong requirements or design. | |
| PTCS | Put together order for equipment for vortex replacement. | N/A | NicoleRadziwill | JoeBrandt | NicoleRadziwill | Purchase order submitted. | |
| PTCS | Antenna trajectory data analysis investigation. Deliverable: Investigation results. | AntennaTrajectorySubproject | RichardPrestage | JoeBrandt | MelindaMello | Document out for review. | |
| PTCS | GFM items (40, 47, 48, 49, 50, 21, 22, 30, 25) from GbtFitsMonitorContinuumRequests | See GbtFitsMonitorContinuumRequests | RichardPrestage | AmyShelton | MarkClark | Improvements to Item 40 as a result of sponsor testing are being made in ashelton's sandbox. Items 22, 30, 47, 49, & 50 are sponsor tested and in gfm-test. Item 48 has been dropped for this cycle because it is not as important as once thought. Items 21 and 25 will not be completed this cycle. | |
| PTCS | Serve as a consultant to Dana to advise him in the upgrade/refactoring of PTCS observing scripts | N/A | RichardPrestage | AmyShelton | MarkClark | | |
| PTCS | Create repository for PTCS software/scripts | N/A | RichardPrestage | AmyShelton | MarkClark | Bojan is not ready for this yet. | |
| PTCS | Active Surface Manager Upgrades: (1) Calculate Zernike polynomials as a function of elevation, (2) Replace F. Schwab's Zernike calculation algorithm with Bojan's | ModificationRequest2C205?, ModificationRequest3C205? | RichardPrestage | AmyShelton | MelindaMello | This item was dropped. | |
| SoftwareCME | Decouple LEDA from IF Manager. See IFManagerWorkOverview for more information. | N/A | NicoleRadziwill | MarkClark | AmyShelton | | |
| SoftwareCME | IF Manager does not list cabling file devices | PO#867 | RonMaddalena | MarkClark | AmyShelton | | |
| SoftwareCME | IF Manager should not report errors for non-selected backends | PO#849 | RichardPrestage | MarkClark | AmyShelton | started, but tabled for this cycle | |
| SoftwareCME | Investigate cfitsio memory leak in SDFITS | SDFITSMemoryLeakInvestigationResults | NicoleRadziwill | MelindaMello | PaulMarganian | Completed Investigation SEE: SDFITSMemoryLeakInvestigationResults | |
| SoftwareCME | Antenna should consider Beam C and 1 identical for single-beam receivers | ModificationRequest9C205 | RonMaddalena | JoeBrandt | RamonCreager | Code and database changes on simulator. Testing. | |
| SoftwareCME | Antenna should handle PF focus positions the same as for Gregorian. | ModificationRequest10C205 | RonMaddalena | JoeBrandt | RamonCreager | I discussed this with Ron, and I think this task may be delayed. | |
| SoftwareCME | Rate mismatch fault check in servo controller needs to detect number of motors faulted. (Lower priority) | ModificationRequest11C205 | RichardPrestage | JoeBrandt | RamonCreager | Not started. | |
| SoftwareCME | Add simplified Peak and Focus to Turtle | ModificationRequest4C205 | KarenONeil | MarkClark | AmyShelton | | |
| SoftwareCME | Linux Migration according to project plan (DCR/LO1 over 2 cycles; vortex by mid April) | N/A | JohnFord | RamonCreager | JoeBrandt | The test DCR seems to work, but troubles with getting the right timing signals (1PPS and 10MHz with the correct relationship) has beem problematic. We resolved to install the test DCR in the equipment room and just use the site timing signals. DcrLinuxDesign | |
| SoftwareCME | Grail support for coop student project | N/A | RonDuPlain | RamonCreager | RonDuPlain | Increased number of threads Grail can launch; added pre-allocated thread pool to service SOAP input | |
| SoftwareCME | Ka Band configuration addition | ModificationRequest7C205 | FrankGhigo | MelindaMello | | Completed - patched in to 5.1 | |
| SoftwareCME | Go from mc version of aips++ to glish standalone | N/A | NicoleRadziwill | BobGarwood | ??? | | |
| SoftwareCME | Integration Tests | PerformIntegrationTests | MarkClark | RamonCreager | N/A | See SddCalendar for dates. | |