Software Plan of Record

Cycle 3 2006 (April 3 - May 12, 2006)


Weeks

  • Week 1 4/3 - 4/7
  • Week 2 4/10 - 4/14
  • Week 3 4/17 - 4/21
  • Week 4 4/24 - 4/28
  • Week 5 5/1 - 5/5
  • Week 6 5/8 - 5/12

Release date for GBTIDL: May 17

Release date for M&C/Sparrow: May 17

Who's in the Box?
  • Melinda - 20% Observing Software, 30% CM&E, 50% Penn Array
  • Joe - 10% Weather, 40% PTCS, 50% Penn Array
  • Ray - 20% Integration Testing, 80% Zspectrometer Manager
  • Amy - 10% Zpectrometer, 10% Dynamic Scheduling, 10% Weather Manager, 20% Observing Software, 50% Management
  • Bob - 10% Quality App (if needed), 90% Data
  • Paul - 15% Data, 85% Support Carl & Reservation System
  • Mark - 100% Astrid/CCB/Ka Support

Key for the "Status" column:

  • DONE (%Y%) means the task has been successfully completed
  • MOVED TO... (%M%) means the task has been completed and is awaiting integration tests
  • PICK (%S%) means the task has been completed and is awaiting sponsor tests
  • ALERT! (%X%) means the task will not be completed this cycle, but was expected to be completed
  • ok means that the task is not yet complete or ready for tests, but ALS has evaluated results & progress is clearly on track

1. Operational/Scientific Support Items Completed During C3 2006


2. Commitments

The default/unsorted state reflects priority order for this cycle.

Task Info/MR Lead Sponsor,Team Notes Status
GBTIDLv2.0 w/Flagging on ~TBD N/A BobGarwood NicoleRadziwill, JimBraatz See IDLPlanUpdate. Release now planned to align with M&C version 6.3.  
Add Motor Rack Control Functions ModificationRequest1C106 JoeBrandt RogerNorrod, AmyShelton Patched into 6.2 DONE
Attend Observing Software Meeting in Edinburgh N/A AmyShelton MelindaMello Attended meeting. DONE
Attend Zpectrometer Meeting ZpectProject KarenONeil AmyShelton, RamonCreager Scheduled for April 14. Agenda available at ZpectMeeting3 Another meeting is scheduled for May 15. Agenda available at ZpectMeeting4 DONE
Complete Zspectrometer Manager ModificationRequest1C306 RamonCreager KarenONeil, AmyShelton See status page. Also see: ZpectProject, ZpectSoftwareDevelopment  
Resolve Offset Nomenclature Ambiguities in Scheduling Blocks ModificationRequest13C306 MarkClark KarenONeil, AmyShelton Testing on May 10 fell short, trying again on May 11. DONE
Add LST Capabilities to Scheduling Blocks ModificationRequest14C306 MarkClark FrankGhigo, AmyShelton Implementation completed except for Horizon's ability to accept solar system objects as a location for GetRise and GetSet. ALERT!
Allow Saving of Invalid Scheduling Blocks ModificationRequest4C805 MarkClark KarenONeil, AmyShelton MR written and approved. ALERT!
Integrate F. Schwab's Antenna Trajectory Algorithm & Test ModificationRequest2C306 JoeBrandt JohnFord, MelindaMello Received preliminary code from Fred. Unit test created. Task moved to next cycle. ALERT!
Upgrade Weather1 Manager ModificationRequest3C306 AmyShelton JasonRay, JoeBrandt   DONE
Add Weather1 as a Choice for Refraction Corrections in Antenna ModificationRequest4C306 JoeBrandt RonMaddalena, AmyShelton   DONE
Integrate Lab Spectrometer into SDFITS/GBTIDL. ModificationRequest5C306 PaulMarganian RonMaddalena Ready for sponsor testing. PICK
Implement Single Factor Dynamic Scheduling ModificationRequest6C306? AmyShelton NicoleRadziwill, MarkClark Will not complete this cycle. ALERT!
GBTIDL Support for Toney's Investigation into Spectrometer Non-linearity Issues IDLPlanUpdate BobGarwood ToneyMinter   DONE
Add Inputs For Van Vleck Sampler Levels and DC Offsets To SDFITS ModificationRequest7C306 PaulMarganian ToneyMinter   DONE
Penn Array Commissioning Support PennArrayReceiverSoftwareCleanup? MelindaMello BrianMason, JoeBrandt    
CCB/Ka Commissioning Support CcbSoftwareCleanup MarkClark BrianMason, MelindaMello Remaining issues are the sponsor's. hehe! (friendly) DONE
Support Incremental Network Upgrades N/A AmyShelton ChrisClark, All   DONE
Integration Tests N/A RamonCreager All    
Create NRAO-wide reservation system. N/A PaulMarganian NicoleRadziwill, CarlBignell Ready for alpha tests.
See also ReservationsStageOne.
 
Antenna rehosted on Linux & deployed ModificationRequest8C306 JoeBrandt JohnFord, MelindaMello Updated MR with results of tests comparing results between old and new systems. Updated FITS documentation. DONE


3. Refactored Code

Description Tests Submitter Notes Status
Fixed sign bug in Location representation Create the following Location object: Location("Encoder", "00:02:23", "-00:20:41") and then print it. The printout should read: Encoder @ (-00:02:23.00, -00:20:41.00) Before the change it would have read: Encoder @ (00:02:23.00, 00:20:41.00) AmyShelton Patched into 6.2 DONE
Modified cfitsio SWIG interface SWIG directives for getting column information was failing in cases of retrieving the column name. This specific SWIG directive was returned to the previous definition. All access to FITS files should work as previsously implemented. Confirmed for unit tests. MarkClark   DONE
Install the config tool in /python/telescope/gbt/config from linux prompt: type config_tool. Run configuration of testers choice. No import errors etc should occur.
Run an astrid script that contains a configuration and verify that no error occur.
MelindaMello Turtle should now be able to import the config tool from telescope.gbt
This should alleviate the need for 2 copies of the config tool
DONE
Fixed memory leak in CCB API There were calls to the tolist function of Numeric in CCBData which seems to generate a memory leak. I removed those and went a different way using numarray. AmyShelton Patched into 6.2 DONE
Added some memory cleanup to GFM Continuum plugin Added some extra cleanup when plots and options are regenerated. AmyShelton Patched into 6.2 DONE
Patched Sysload script Revised Sysload script to properly mount directories. This was causing problems with active surface booting. JoeBrandt Patched into both 6.2 and 6.3 DONE

4. Background Tasks

Task MR Team Notes Status
Correct boom deploy/retract under M&C control BoomDeployRetractProblem? JasonRay, JoeBrandt, MelindaMello Code works, but SCU rejects reset command. Needs investigation with electronics support.  
Create Penn Array Manager ModificationRequest15C306 BrianMason, MelindaMello, JoeBrandt    
Create spectrometer integration-level plot server and client. N/A PaulMarganian, AmyShelton    
Create Linux Quadrant Detector Manager ModificationRequest9C306 JasonRay, RamonCreager Writing MR. Implementation scheduled for C4 2006. Ray and I have a meeting on May 10 to discuss the MR with Jason and John.  
Implement CCB Self-Test ModificationRequest10C306 BrianMason, MarkClark Completed FITS CCB comparison code.  
Add Setting of Spectral Processor Parameter, taper, to the Configuration Tool ModificationRequest11C306 KarenONeil, MelindaMello Ready for integration testing. DONE
Add Peak for Daytime High Frequency Observing ModificationRequest12C306 DanaBalser, MarkClark Tabled indefinitely DONE
GFM Return Code in Astrid ModificationRequest17C705 KarenONeil, MarkClark Talk to sponsor before starting!  
Quality App ModificationRequest12C705 NicoleRadziwill, AmyShelton, RonDuPlain We have a design in place and are ironing out details.  

5. Miscellaneous

Topic PlanOfRecordC32006 . { Edit | Attach | Ref-By | Printable | Diffs | r1.74 | > | r1.73 | > | r1.72 | More }
Revision r1.74 - 13 Jun 2006 - 18:16 GMT - MarkClark Content copyright © 1999-2007 by the contributing authors.
All material on this collaboration platform is the property of the contributing authors.