Software Plan of Record

Cycle 5 2006 (July 3 - August 15, 2006)


Weeks

  • Week 1 7/3 - 7/7
  • Week 2 7/10 - 7/14
  • Week 3 7/17 - 7/21
  • Week 4 7/24 - 7/28
  • Week 5 7/31 - 8/4
  • Week 6 8/7 - 8/11

Release date for M&C/Sparrow: August 16, 2006

Who's in the Box?
  • Amy - 30% Management, 20% Dynamic Scheduling, 10% Zpectrometer, 30% Conference, 10% Vacation
  • Bob - 40% Data, 30% Research, 20% Conference, 10% Vacation
  • Joe - 30% Ka Receiver, 50% PTCS, 20% Conference
  • Mark - 25% Dynamic Scheduling, 25% Quality, 20% DB Support, 20% Conference, 10% Vacation
  • Melinda - 25% Penn Array, 50% Dynamic Scheduling, 20% Conference, 5% Balancing
  • Paul - 50% Dynamic Scheduling, 10% Reservation System, 30% Conference, 10% Vacation
  • Ray - 40% Zpectrometer, 40% PTCS (Quadrant Detector), 20% Conference
  • Ron - 100% Quality

Key for the "Status" column:

  • DONE (%Y%) means the task has been successfully completed
  • MOVED TO... (%M%) means the task has been completed and is awaiting integration tests
  • PICK (%S%) means the task has been completed and is awaiting sponsor tests
  • ALERT! (%X%) means the task will not be completed this cycle, but was expected to be completed
  • ok means that the task is not yet complete or ready for tests, but ALS has evaluated results & progress is clearly on track

1. Operational/Scientific Support Items Completed During C5 2006

For each support item, please list the amount of effort involved as either: low, medium, or high. Guidelines for these rankings are as follows:

If multiple people are involved in an item, please list it only once. Effort estimates should reflect total time elapsed, i.e. how long did it take to fix the problem start to finish - not the sum total of each person's time.


2. Commitments

The default/unsorted state reflects priority order for this cycle.

Task Info/MR Lead Sponsor,Team Notes Status
Evolve Dynamic Scheduling Proposal Dynamic Web AmyShelton KarenONeil, MelindaMello, PaulMarganian, MarkClark Includes trip to JCMT and algorithm development: presentation ready for 8/4.  
Create NRAO-wide reservation system. ReservationsStageThree PaulMarganian NicoleRadziwill, CarlBignell Bussiness Manager's respond to ReservationsStageThree document: request scenario 3, a full replacement of BARS. Videocon on August 3 with all stakeholders. Agenda ready for said meeting.  
Attend Zpectrometer Meetings ZpectProject KarenONeil AmyShelton, RamonCreager The next meeting is scheduled for August 9. See ZpectMeeting6 for an agenda.  
Test Zpectrometer Manager with UMd Hardware ModificationRequest1C306 RamonCreager KarenONeil, AmyShelton See status page. Also see: ZpectProject, ZpectSoftwareDevelopment. Hardware arrived, and I have installed it in my office  
Write MR for Integration of the Zpectrometer into SDFITS and GBTIDL ModificationRequest4C406 RamonCreager KarenONeil, AmyShelton The MR needs more detail, e.g. which piece of software is getting what information from which file. (No progress)  
Modifications to Ka Manager ModificationRequest1C506 JoeBrandt GalenWatts Code changes for manager complete, and tested on simulator. Incorporated MR comments. MR under consideration by CCC. Currently testing IFManager modifications.  
Penn Array Commissioning Support of Fits Archiver N/A MelindaMello BrianMason Steve White is in the process of updating the DFB and Interface card firmware. If the updates are completed in time, I will test on 7/11/2006. Created some slides for the PAR review.  
Attend Penn Array Review Meeting PennArrayReceiver BrianMason MelindaMello The meeting is scheduled for July 31 and August 1 in Philadelphia.  
Implement Spectrometer Bad Lags Fix ModificationRequest15C306 BobGarwood KarenONeil Testing is progressing. I found and fixed a few bugs using some faked data to test various special cases. PICK
Test F. Schwab's Antenna Trajectory Algorithm ModificationRequest2C306, Trajectory Test Notes JoeBrandt JohnFord, MelindaMello This task is in support of the testing of Fred's algorithm only - no integration with the Antenna Manager planned for C4. One round of testing completed. Plotted results in report, and discussed results with John. I committed to providing a test version of the servo sw for John to experiment with in August. (Done)  
Implement Linux Quadrant Detector Manager ModificationRequest9C306 RamonCreager JasonRay, PaulMarganian Work is almost complete. Currently, the Manager compiles and links, with new GDAQ library. All samplers and parameters added to DDL, which is complete. Summary of work remaining: DT-50 library, testing (No change)  
Balancing Project - Create Project Charter Add link to charter here MelindaMello FrankGhigo    
GBTIDL Autoflagger ModificationRequest2C506 BobGarwood RonMaddalena Started.  
Investigate imaging for GBTIDL add link to investigation results here BobGarwood RonMaddalena    
Quality App ModificationRequest12C705 NicoleRadziwill RonDuPlain, MarkClark No updates.  
Attend Software Engineering Conference in Socorro Agenda All All    
Database Support - Migrate CarlBignell's DBs to MySQL N/A MarkClark CarlBignell Discussions have begun.  
MR for test tone control via RPC for Zpectrometer ModificationRequest3C506 JoeBrandt RamonCreager MR written, coding mostly complete. MR requires either config-tool or scheduling block code to place LO1B in/out of service during Zpectrometer calibration.  


3. Refactored Code

Description Tests Submitter Notes Status

4. Background Tasks

Task Info/MR Lead Sponsor,Team Notes Status
Incorporate OOF Holography Zernike models into Active Surface ModificationRequest1C406 JoeBrandt DanaBalser Some progress made. Unable to fully reproduce "lags by 1 scan problem".
Added proposed schema to MR.
 
Assist CarlBignell in migrating from dbase to MySQL N/A PaulMarganian CarlBignell    
Allow Saving of Invalid Scheduling Blocks ModificationRequest4C805 MarkClark KarenONeil, AmyShelton   MOVED TO...
Create Penn Array Manager ModificationRequest3C406 JoeBrandt BrianMason, MelindaMello    
Fix Faulty Self-Test in Spectrometer ModificationRequest6C406 RamonCreager RandyMcCullough    
Correct boom deploy/retract under M&C control BoomDeployRetractProblem? JasonRay JoeBrandt, MelindaMello    
Create spectrometer integration-level plot server and client. N/A AmyShelton PaulMarganian    
GFM Return Code in Astrid ModificationRequest17C705 KarenONeil MarkClark Not started.  
Balancing Project - Get, Set, and Change Attenuators ModificationRequest8C505 MelindaMello FrankGhigo, RamonCreager    
Balancing Project - Converter Rack: Add Ability to Set Power Levels and to Balance to those Levels ModificationRequest4C505 MelindaMello FrankGhigo, RamonCreager    
Balancing Project - Change Spectrometer Warning Messages During Balance ModificationRequest9C505 MelindaMello FrankGhigo, RamonCreager    
Balancing Project - IF Rack: Change messages to indicate non-balance and non-linearity ModificationRequest10C505 MelindaMello FrankGhigo, RamonCreager    
Balancing Project - Multiple sampling for Balancing procedures to diminish RFI effects ModificationRequest11C505 MelindaMello FrankGhigo, RamonCreager    
Provide a servo version with adjustable rate feedfoward for testing. N/A JoeBrandt JohnFord Installed and available for test. (Sent John instructions on use.) PICK

5. Miscellaneous

Topic PlanOfRecordC52006 . { Edit | Attach | Ref-By | Printable | Diffs | r1.43 | > | r1.42 | > | r1.41 | More }
Revision r1.43 - 03 Aug 2006 - 16:45 GMT - PaulMarganian Content copyright © 1999-2007 by the contributing authors.
All material on this collaboration platform is the property of the contributing authors.