| Project | TASK | MR | Sponsor | Lead | Checker | Notes | Status |
| DataHandlingImprovements | Upgrade Spectral Line Capabilities in GFM for Astronomers | ModificationRequest6C505 | RonMaddalena | PaulMarganian | AmyShelton | MR approved, still waiting for sponsor testing. Major real time issues jeopardize task: fql FITS file buffering, DEAP plotting time. Issues being addressed (see below). | |
| DataHandlingImprovements | Upgrade Spectral Line Capabilities in GFM for Engineers | ModificationRequest1C705 | RichardLacasse | NicoleRadziwill | PaulMarganian | Nicole and Rich getting together 11/2 to 11/5 sometime to finalize MR. | |
| DataHandlingImprovements | DEAP or Matplotlib Additions for Plotting Performance | ModificationRequest2C705? | NicoleRadziwill | AmyShelton | PaulMarganian | Matplotlib is half-way integrated into DEAP. We are currently working on getting GFM to use the new DEAP. The problems with that are actually fitting related - not plotting. We also have a test version of sparrow built against the new McPython? in /home/gbt7/llama2. Refactoring of Sparrow libraries increasing IO performance by more then two fold. | |
| DataHandlingImprovements | GBTIDLv1.2 | N/A | NicoleRadziwill | BobGarwood | JimBraatz | See IDLPlanUpdate. Making progress on version 1.2. | |
| DataHandlingImprovements | Instructions for expanding GBTIDL for other telescopes | N/A | NicoleRadziwill | PaulMarganian | BobGarwood | Discussed briefly, but not started yet. | |
| CaltechContinuumBackend | CCB/Ka Commissioning Support | CcbSoftwareCleanup | BrianMason | MarkClark | MelindaMello | Except for one bug, in general support mode. | |
| CaltechContinuumBackend | Add CCB to IF Mgr | ModificationRequest6C705 | BrianMason | MarkClark | RamonCreager | Waiting for CCC approval. | |
| CaltechContinuumBackend | Implement Data Quality Checks for Ka FITS Files & Interpret in GFM | ModificationRequest12C705 | BrianMason | PaulMarganian | NicoleRadziwill | MR written. Supporting code in sparrow developed. Working on GFM changes. Need more time with Brian to discuss GFM calibration . This is in danger of sliding. | |
| CaltechContinuumBackend | Add Support for new Ka Channels to GFM | ModificationRequest13C705 | BrianMason | PaulMarganian | AmyShelton | MR being written. but this should be a very simple task. This is also in danger of sliding. | |
| CaltechContinuumBackend | Create MR for Adding Support for CCB to GFM | ModificationRequest16C705 | BrianMason | AmyShelton | PaulMarganian | MR being written. Brian is working on the requirements section. I expect him to complete that sometime next week. | |
| CaltechContinuumBackend | Config Tool Addition for CCB | ModificationRequest8C705 | BrianMason | MelindaMello | MelindaMello | | |
| CaltechContinuumBackend | FITS File Name to Scan Log | ModificationRequest5C705 | BrianMason | MarkClark | MelindaMello | Waiting for CCC approval. | |
| PennArrayReceiver | Add remaining features to FITS archiver (v9, keywords, channel mapping) | ModificationRequest2C505 | BrianMason | MelindaMello | JoeBrandt | IRC and MarkIII? CVS tag in place, PAR code tagged/released with installation instuctions on the Wiki. | |
| PTCS | Split enabling of dynamic corrections for pting/focus | ModificationRequest4C705 | DanaBalser | JoeBrandt | PaulMarganian | done | |
| PTCS | Standardize different versions of Peak/Focus scan types | ModificationRequest14C705 | KarenONeil | MarkClark | AmyShelton | Reasons for slippage are: 1) Most of the cycle went to iterating through the requirements. 2) The CCB chose the end of the cycle to expose an especially nasty bug which has taken nearly a week of effort (so far). | |
| SoftwareCME | Provide low-level support for cross-correlation tests if necessary | N/A | KarenONeil | MarkClark | PaulMarganian | No requests made | |
| SoftwareCME | CFITSIO Fix | N/A | KarenONeil | MelindaMello | PaulMarganian | I have nearly 2 weeks of vacation scheduled for this cycle. As the lowest priority task, this one most likely will not be completed. NOTE:If not lowest priority, please let me know. (Joe agreed to look into this issue -- time permitting.) | |
| SoftwareCME | Write 3mm Receiver Manager | N/A | MikeStennes | RamonCreager | JoeBrandt | Rev. 1 of the conventional portion of the receiver is written. Work is proceeding on testing this with the simulator, and on writing the Calibration Optics control code for the receiver. | |
| SoftwareCME | Config Tool Addition for GASP and/or SPIGOT without BCPM | ModificationRequest7C705 | ScottRansom | MelindaMello | MelindaMello | | |
| SoftwareCME | Resurrect the Tipper Manager | TipperInvestigation | BrianMason | JoeBrandt | RamonCreager | All of my tests point to a hardware issue, either mechanical (the system binds and stalls the motor?), or a controller/connection problem. (Update: Jason has found the motor to be bad.) | |
| SoftwareCME | Changes to AutoPeakFocus for Catalog Support [Note: Only if CCB Commiss Needs Not Extensive] | ModificationRequest10C705 | KarenONeil | MarkClark | AmyShelton | Waiting for CCC approval. | |
| SoftwareCME | Integration Tests | PerformIntegrationTests | AmyShelton | RamonCreager | AmyShelton | See SddCalendar for dates. | |
| Other | Zspectrometer Meeting on October 14 | N/A | KarenONeil | AmyShelton | NicoleRadziwill | Complete. Additional details available at ZpectProject | |
| Other | Panel Discussion on October 5, 1p-2:30p in Tour Center Classroom | N/A | NicoleRadziwill | MarkClark | None | | |
| SoftwareCME | Resolve Astrid Secondary Optics Issues | AstridSecondaryOpticsInvestigation? | AmyShelton | JoeBrandt | None | complete/patched into 5.6 | |
| SoftwareCME | LO1 10MHz external reference monitoring | ModificationRequest11C804 | RogerNorrod | JoeBrandt | None | | |